NYSDOT contract D265529 bid tabulation
HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS. Let by New York State DOT on January 22, 2026, Westchester, Region 08. 4 bids received; low bid $6,754,552 by Verde Electric Maintenance Corp.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 155
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Verde Electric Maintenance Corp | $6,754,552 | Low |
| 2 | Northbrook Contracting Corp | $6,938,000 | +3.0% |
| 3 | Morano Brothers Corp | $8,420,542 | +25% |
| 4 | Triumph Construction Corp | $9,774,243 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Verde Electric Maintenance Corp | 2. Northbrook Contracting Corp | 3. Morano Brothers Corp | 4. Triumph Construction Corp |
|---|---|---|---|---|---|---|---|
| 1 | (201.07010004) | 7 | $5,850.00 | $1,700.00 | $5,500.00 | $10,000 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 926 | $365.00 | $235.00 | $300.00 | $100.00 |
| 3 | Embankment In Place (203.03) | CY | 246 | $135.00 | $185.00 | $196.00 | $25.00 |
| 4 | Select Granular Fill (203.07) | CY | 109 | $68.00 | $180.00 | $196.00 | $40.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 144 | $25.00 | $370.00 | $70.00 | $500.00 |
| 6 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 2,549 | $95.00 | $126.00 | $182.00 | $150.00 |
| 7 | Test Pit Excavation (206.05) | EACH | 102 | $1,500.00 | $910.00 | $2,375.00 | $700.00 |
| 8 | Mulch – Temporary (209.100101) | SY | 1,166 | $3.65 | $1.00 | $0.55 | $16.00 |
| 9 | Seed and Mulch – Temporary (209.1003) | SY | 626 | $3.65 | $6.00 | $3.00 | $20.00 |
| 10 | (304.11000008) | 714 | $125.00 | $350.00 | $150.00 | $200.00 | |
| 11 | (404.0983) | TON | 65 | $425.00 | $875.00 | $253.00 | $250.00 |
| 12 | (404.1989) | TON | 36 | $400.00 | $415.00 | $349.00 | $250.00 |
| 13 | (404.3789) | TON | 72 | $395.00 | $300.00 | $306.00 | $250.00 |
| 14 | Straight Tack Coat (407.0103) | GAL | 54 | $60.00 | $56.00 | $33.00 | $30.00 |
| 15 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,612 | $2.75 | $2.00 | $3.60 | $35.00 |
| 16 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 120 | $1,070.00 | $350.00 | $359.00 | $1,500.00 |
| 17 | (520.50000004) | 66 | $7.25 | $41.00 | $7.30 | $11.00 | |
| 18 | Shields and Shoring (552.17) | SF | 224 | $85.00 | $9.00 | $53.00 | $5.00 |
| 19 | Concrete for Structures, Performance (555.0021) | CY | 1.11 | $2,420.00 | $1,200.00 | $1,963.00 | $7,000.00 |
| 20 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $15.00 | $15.00 | $15.00 | $15.00 |
| 21 | Sidewalks and Safety Walks (557.30) | SY | 61 | $310.00 | $200.00 | $472.00 | $1,500.00 |
| 22 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $27.01 | $27.01 | $27.01 | $27.01 |
| 23 | Removal of Structural Concrete (580.01) | CY | 20 | $730.00 | $1,500.00 | $1,250.00 | $300.00 |
| 24 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 30 | $100.00 | $140.00 | $103.00 | $130.00 |
| 25 | (603.6001) | LF | 26 | $1,080.00 | $45.00 | $270.00 | $50.00 |
| 26 | (603.6002) | LF | 83 | $425.00 | $40.00 | $250.00 | $50.00 |
| 27 | Concrete Collars (603.77) | EACH | 1 | $2,180.00 | $2,600.00 | $1,100.00 | $4,500.00 |
| 28 | (604.070801) | EACH | 8 | $4,360.00 | $1,300.00 | $1,500.00 | $5,000.00 |
| 29 | (604.300103) | LF | 21 | $1,620.00 | $500.00 | $2,200.00 | $500.00 |
| 30 | (604.300203) | LF | 4 | $1,690.00 | $550.00 | $1,900.00 | $550.00 |
| 31 | (604.310132) | LF | 4 | $2,590.00 | $400.00 | $1,900.00 | $475.00 |
| 32 | Box Beam Guide Railing (606.10) | LF | 165 | $135.00 | $130.00 | $220.00 | $80.00 |
| 33 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 7 | $250.00 | $165.00 | $330.00 | $400.00 |
| 34 | Box Beam End Piece (606.120101) | EACH | 1 | $2,200.00 | $1,500.00 | $1,000.00 | $1,250.00 |
| 35 | Anchorage Units for Corrugated Beam Guide Railing (606.22) | EACH | 1 | $3,850.00 | $15,000 | $3,300.00 | $6,500.00 |
| 36 | HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) (606.270101) | LF | 47 | $82.00 | $87.00 | $270.00 | $250.00 |
| 37 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 1 | $4,290.00 | $7,500.00 | $3,900.00 | $6,500.00 |
| 38 | Single-Slope Concrete Half Section Barrier (Precast) (606.3062) | LF | 66 | $440.00 | $225.00 | $344.00 | $120.00 |
| 39 | Resetting Box Beam Guide Railing (606.53) | LF | 60 | $172.00 | $77.00 | $976.00 | $180.00 |
| 40 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 101 | $9.00 | $34.00 | $40.00 | $16.00 |
| 41 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 243 | $9.00 | $27.00 | $42.00 | $9.00 |
| 42 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 1 | $17,600 | $20,000 | $17,000 | $13,000 |
| 43 | Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier (606.8903) | EACH | 1 | $14,850 | $10,000 | $13,000 | $10,000 |
| 44 | (607.96000008) | 9 | $200.00 | $35.00 | $137.00 | $100.00 | |
| 45 | (607.97000008) | 20 | $200.00 | $125.00 | $221.00 | $200.00 | |
| 46 | Concrete Sidewalks and Driveways (608.0101) | CY | 202 | $1,100.00 | $2,100.00 | $1,500.00 | $5,000.00 |
| 47 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 63 | $440.00 | $350.00 | $309.00 | $350.00 |
| 48 | (608.21000003) | 157 | $425.00 | $500.00 | $374.00 | $300.00 | |
| 49 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 1,190 | $225.50 | $225.00 | $110.00 | $400.00 |
| 50 | (609.0401) | LF | 1,992 | $121.00 | $190.00 | $74.00 | $350.00 |
| 51 | Turf Establishment – Performance (610.1605) | SY | 555 | $27.00 | $40.00 | $3.00 | $26.00 |
| 52 | (614.060204) | EACH | 1 | $2,790.00 | $3,200.00 | $3,200.00 | $4,000.00 |
| 53 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $785,000 | $550,681 | $900,000 | $2,000,000 |
| 54 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 10 | $155.00 | $200.00 | $785.00 | $160.00 |
| 55 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 60 | $200.00 | $400.00 | $270.00 | $550.00 |
| 56 | Cleaning Drainage Structures (621.04) | EACH | 1 | $485.00 | $1,100.00 | $460.00 | $7,500.00 |
| 57 | Survey Operations (625.01) | LS | 1 | $215,050 | $98,000 | $305,000 | $200,000 |
| 58 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 16 | $1,460.00 | $2,000.00 | $765.00 | $1,000.00 |
| 59 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 13 | $730.00 | $200.00 | $850.00 | $1,500.00 |
| 60 | (627.50140008) | 398 | $5.50 | $30.00 | $5.00 | $13.00 | |
| 61 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 24,449 | $1.65 | $3.00 | $1.65 | $4.00 |
| 62 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 24 | $165.00 | $175.00 | $55.00 | $150.00 |
| 63 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 6 | $165.00 | $250.00 | $55.00 | $175.00 |
| 64 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $11,500 | $2,000.00 | $7,088.00 | $3,500.00 |
| 65 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 24 | $5,765.00 | $2,500.00 | $8,700.00 | $3,250.00 |
| 66 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 68 | (637.41000115) | 24 | $200.00 | $1,500.00 | $200.00 | $750.00 | |
| 69 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 80 | $70.00 | $25.00 | $112.00 | $80.00 |
| 70 | Type A Sign Posts (645.81) | EACH | 41 | $485.00 | $200.00 | $275.00 | $400.00 |
| 71 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 25 | $275.00 | $135.00 | $175.00 | $127.00 |
| 72 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 8 | $55.00 | $135.00 | $175.00 | $380.00 |
| 73 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 32 | $110.00 | $135.00 | $154.00 | $440.00 |
| 74 | Expendable Impact Attenuator , TL 2, ≤ 2 ft Obstruction Width (654.5020) | EACH | 2 | $40,150 | $20,000 | $43,000 | $50,000 |
| 75 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 9 | $2,200.00 | $1,500.00 | $2,400.00 | $610.00 |
| 76 | Manhole Frame & Grate (655.1201) | EACH | 1 | $2,200.00 | $1,500.00 | $2,000.00 | $675.00 |
| 77 | Manhole Frame & Cover (655.1202) | EACH | 5 | $2,420.00 | $900.00 | $1,700.00 | $700.00 |
| 78 | (662.60000108) | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 79 | (662.60030008) | 1 | $415.00 | $300.00 | $350.00 | $2,000.00 | |
| 80 | Relocate Existing Hydrant (663.31) | EACH | 1 | $14,000 | $15,000 | $9,800.00 | $7,500.00 |
| 81 | (680.05010007) | 11 | $26,525 | $35,000 | $36,000 | $35,000 | |
| 82 | (680.05020007) | 11 | $4,500.00 | $5,000.00 | $6,400.00 | $5,500.00 | |
| 83 | (680.10040001) | 9 | $490.00 | $525.00 | $1,000.00 | $550.00 | |
| 84 | Pole Excavation and Concrete Foundation (680.5001) | CY | 136 | $3,800.00 | $4,200.00 | $5,800.00 | $3,000.00 |
| 85 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $2,500.00 | $4,500.00 | $5,000.00 | $5,000.00 |
| 86 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 2 | $1,500.00 | $800.00 | $5,000.00 | $2,000.00 |
| 87 | (680.51000010) | 6 | $750.00 | $600.00 | $2,400.00 | $600.00 | |
| 88 | (680.510501) | EACH | 42 | $2,400.00 | $3,000.00 | $3,700.00 | $3,000.00 |
| 89 | (680.51100010) | 33 | $200.00 | $170.00 | $450.00 | $175.00 | |
| 90 | (680.51200208) | 14 | $1,750.00 | $400.00 | $273.00 | $1,200.00 | |
| 91 | (680.520106) | LF | 1,086 | $34.00 | $21.00 | $55.00 | $22.00 |
| 92 | (680.520108) | LF | 1,358 | $50.00 | $47.00 | $53.00 | $45.00 |
| 93 | (680.520110) | LF | 110 | $90.00 | $72.00 | $137.00 | $70.00 |
| 94 | (680.53010010) | 904 | $7.00 | $10.00 | $13.00 | $10.00 | |
| 95 | (680.600830) | EACH | 2 | $15,000 | $18,000 | $21,000 | $18,000 |
| 96 | (680.600831) | EACH | 1 | $15,000 | $18,000 | $21,000 | $18,500 |
| 97 | (680.600832) | EACH | 1 | $15,000 | $18,000 | $21,000 | $19,000 |
| 98 | (680.601231) | EACH | 1 | $18,500 | $21,000 | $26,000 | $21,000 |
| 99 | (680.601232) | EACH | 1 | $18,500 | $21,000 | $26,000 | $21,500 |
| 100 | (680.621960) | EACH | 1 | $30,500 | $44,000 | $43,000 | $42,000 |
| 101 | (680.622040) | EACH | 1 | $20,900 | $23,000 | $30,000 | $22,000 |
| 102 | (680.681202) | EACH | 82 | $1,725.00 | $2,000.00 | $2,800.00 | $1,950.00 |
| 103 | (680.682002) | EACH | 10 | $1,850.00 | $2,300.00 | $3,000.00 | $2,300.00 |
| 104 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 5 | $1,650.00 | $5,100.00 | $2,800.00 | $5,200.00 |
| 105 | Messenger Assembly (680.7004) | EACH | 313 | $8.00 | $10.00 | $16.00 | $10.00 |
| 106 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $1,500.00 | $600.00 | $2,000.00 | $600.00 |
| 107 | (680.730214) | LF | 673 | $5.00 | $3.00 | $8.00 | $3.50 |
| 108 | (680.730514) | LF | 22,600 | $5.25 | $5.00 | $8.00 | $5.00 |
| 109 | (680.731014) | LF | 1,250 | $7.50 | $10.00 | $11.00 | $9.00 |
| 110 | (680.78000001) | LS | 1 | $3,500.00 | $265.00 | $8,900.00 | $275.00 |
| 111 | (680.79000001) | LS | 1 | $25,000 | $21,000 | $144,000 | $50,000 |
| 112 | (680.79300010) | 13 | $135.00 | $150.00 | $190.00 | $150.00 | |
| 113 | (680.80324515) | 17 | $3,250.00 | $3,500.00 | $6,800.00 | $3,500.00 | |
| 114 | (680.80324708) | 2 | $1,275.00 | $1,700.00 | $1,900.00 | $1,750.00 | |
| 115 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 28 | $155.00 | $100.00 | $222.00 | $100.00 |
| 116 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 5 | $150.00 | $100.00 | $213.00 | $100.00 |
| 117 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 29 | $160.00 | $100.00 | $233.00 | $100.00 |
| 118 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 11 | $155.00 | $100.00 | $219.00 | $100.00 |
| 119 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 31 | $160.00 | $100.00 | $233.00 | $100.00 |
| 120 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 6 | $155.00 | $100.00 | $222.00 | $100.00 |
| 121 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 106 | $290.00 | $500.00 | $457.00 | $500.00 |
| 122 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 17 | $600.00 | $350.00 | $908.00 | $350.00 |
| 123 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $850.00 | $800.00 | $1,300.00 | $800.00 |
| 124 | (680.81230008) | 11 | $650.00 | $500.00 | $920.00 | $500.00 | |
| 125 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 202 | $435.00 | $572.00 | $635.00 | $550.00 |
| 126 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 101 | $400.00 | $200.00 | $600.00 | $200.00 |
| 127 | Pedestrian Signal Section, Aluminum, Type I, for 16 inches by 18 inches LED module (680.813108) | EACH | 8 | $500.00 | $530.00 | $709.00 | $550.00 |
| 128 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 109 | $500.00 | $700.00 | $751.00 | $650.00 |
| 129 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 101 | $400.00 | $200.00 | $600.00 | $200.00 |
| 130 | Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002) | EACH | 8 | $450.00 | $300.00 | $682.00 | $300.00 |
| 131 | (680.8151) | EACH | 110 | $1,625.00 | $1,400.00 | $2,625.00 | $1,500.00 |
| 132 | (680.8152) | EACH | 2 | $3,000.00 | $4,800.00 | $5,600.00 | $5,000.00 |
| 133 | Backplates for Traffic Signal Heads (680.8199) | EACH | 31 | $350.00 | $225.00 | $580.00 | $220.00 |
| 134 | (680.8201) | EACH | 11 | $780.00 | $1,400.00 | $1,100.00 | $1,300.00 |
| 135 | (680.8207) | EACH | 6 | $1,000.00 | $1,300.00 | $1,500.00 | $1,200.00 |
| 136 | Breakaway Transformer Base (680.8223) | EACH | 92 | $900.00 | $1,000.00 | $1,400.00 | $1,000.00 |
| 137 | (680.82250101) | 19 | $135.00 | $210.00 | $191.00 | $200.00 | |
| 138 | (680.82250608) | 13 | $270.00 | $1,900.00 | $376.00 | $1,200.00 | |
| 139 | (680.82250801) | 11 | $1,200.00 | $1,800.00 | $1,700.00 | $1,500.00 | |
| 140 | (680.94000008) | 3 | $1,400.00 | $1,700.00 | $2,000.00 | $1,750.00 | |
| 141 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 10 | $1,400.00 | $130.00 | $2,000.00 | $125.00 |
| 142 | (680.950206) | LF | 190 | $5.75 | $8.00 | $9.00 | $7.00 |
| 143 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 144 | (680.99050010) | 9 | $400.00 | $600.00 | $573.00 | $600.00 | |
| 145 | (680.99060010) | 5 | $3,000.00 | $4,700.00 | $4,700.00 | $3,750.00 | |
| 146 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,051 | $1.50 | $4.00 | $3.00 | $4.00 |
| 147 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 511 | $1.65 | $4.00 | $3.00 | $4.00 |
| 148 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 32,215 | $1.65 | $4.00 | $2.30 | $4.00 |
| 149 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 20 | $220.00 | $156.00 | $164.00 | $130.00 |
| 150 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 13 | $220.00 | $190.00 | $164.00 | $160.00 |
| 151 | Field Change Payment (FCP) (697.03) | DOL | 409,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 152 | Asphalt Price Adjustment (698.04) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 153 | Fuel Price Adjustment (698.05) | DOL | 1,100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 154 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 155 | Mobilization (699.040001) | LS | 1 | $243,000 | $260,000 | $300,000 | $375,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.