Morano Brothers Corp: NYSDOT bid record

Morano Brothers Corp submitted 38 bids on New York State DOT contracts in the data, from 01 SEP 2022 to 17 SEP 2026, and was the low bidder on 11 of them (29%). When it was not low, its total sat a median +12% above the low bid.

Owner
New York State DOT
Low bid volume
$84,105,537
Latest bid
17 SEP 2026
Data through
15 OCT 2026
38Bids
11Low bids
29Win rate, percent
+12%Median gap to the low bid when not low, 26 bids

By year

YearBidsLow bidsWin rate
2022200%
202312325%
20246350%
202511218%
20267343%
Morano Brothers Corp, NYSDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL3535 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL3333 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL3333 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL3232 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL2929 (100%)$1.00$1.00
Clean, Grade and Shape Existing Roadside Section621.05LF2216 (73%)$4.10$8.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT1515 (100%)$105.00$85.00
Pavement Density Quality Adjustment to Asphalt Items404.000021QUALITY UNIT1515 (100%)$105.00$85.00
680.512002081614 (88%)$112.50$750.00
Pavement Density Quality Adjustment to Asphalt Items404.0002QUALITY UNIT1212 (100%)$120.00$110.00
Longitudinal Joint Density Quality Adjustment to Asphalt Items404.0003QUALITY UNIT1212 (100%)$120.00$110.00
404.0001TON1010 (100%)$120.00$95.00
Morano Brothers Corp, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Morano Brothers Corp, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
17 SEP 2026D265820Region 08BIENNIAL GRAFFITI REMOVAL4 of 4$592,920+56%
26 MAR 2026D265748Region 08PMI: RESURFACING OF ROUTE 117 AND ROUTE 9A3 of 6$15,052,208+11%
22 JAN 2026D265529Region 08HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS3 of 4$8,420,542+25%
22 JAN 2026D265531Region 08PEDESTRIAN SAFETY IMPROVEMENTS2 of 3$5,217,249+12%
22 JAN 2026D265654Region 08PAVEMENT RESURFACING - US ROUTE 1 AND PUTNAM AVENUE1 of 9$8,566,997Low, 5.0% under the second
22 JAN 2026D265679Region 08PAVEMENT RESURFACING - Routes 133 & 100B1 of 6$7,722,105Low, 2.0% under the second
08 JAN 2026D265648Region 08ROADWAY RESURFACING - Route 303, SH 8448, 50021 of 8$9,220,000Low, 3.0% under the second
11 SEP 2025D265557Region 08Standby Where & When Highway, Region-Wide2 of 6$6,014,198+2.0%
22 MAY 2025D265496Region 08ADA SIDEWALKS AND RAMPS.4 of 4$4,394,988+15%
24 APR 2025D265484Region 08ROUTE 134 RESURFACING ROUTE 9A1 of 6$2,044,228Low, 8.0% under the second
20 MAR 2025D265471Region 08RESURFACING - Route 3122 of 6$2,335,753+12%
13 MAR 2025D265409Region 08CULVERT JOB ORDER CONTRACT - Various Locations.4 of 5$2,200,000+9.0%
13 MAR 2025D265463Region 08CATCH BASIN REPAIRS - Hutchinson River Parkway, Rt 907W1 of 7$4,084,801Low, 10% under the second
27 FEB 2025D265442Region 08PAVEMENT RESURFACING - Route 174 of 7$10,781,798+11%
27 FEB 2025D265448Region 08Regional Graffiti Removal Contract3 of 4$771,700+84%
20 FEB 2025D265386Region 08Culvert Replacements and Rehabilitations - Various Locations5 of 5$14,836,946+58%
20 FEB 2025D265427Region 08ROUTE 52 - RESURFACING PUTNAM COUNTY2 of 7$4,205,389+5.0%
23 JAN 2025D265415Region 08RESURFACING - TACONIC STATE PARKWAY- Route 55 to Tyrrel Road6 of 7$7,717,061+35%
24 OCT 2024D265349Region 08PAVEMENT RESURFACING - Route 454 of 5$4,911,612+17%
12 SEP 2024D265312Region 08RESURFACING - ROUTES 100A 100B TO 100C/1004 of 6$5,380,657+10%
28 MAR 2024D265205Region 08ROUTE 100 PAVING1 of 3$17,302,661Low, 4.0% under the second
29 FEB 2024D265198Region 08Route 45 Complete Streets Improvements1 of 2$10,995,000Low, 41% under the second
29 FEB 2024D265222Region 08RTE 35 RESURFACING: RTE 22 TO BOUTON ROAD, WESTCHESTER1 of 2$6,501,413Low, 9.0% under the second
08 FEB 2024D265201Region 08RT 376 (Raymond Ave) at Hooker Ave Intersection Improvements8 of 11$14,299,974+25%
14 DEC 2023D265125Region 08ROUTE 22 PAVING PUTNAM AND DUTCHESS COUNTIES2 of 3$16,333,642+10%
Morano Brothers Corp: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy