NYSDOT contract D265654 bid tabulation
PAVEMENT RESURFACING - US ROUTE 1 AND PUTNAM AVENUE. Let by New York State DOT on January 22, 2026, Westchester, Region 08. 9 bids received; low bid $8,566,997 by Morano Brothers Corp.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 63
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morano Brothers Corp | $8,566,997 | Low |
| 2 | Petrillo Contracting Inc | $8,982,123 | +5.0% |
| 3 | Yonkers Contracting Company Inc | $9,377,610 | +9.0% |
| 4 | Grace Industries LLC | $9,384,000 | +10% |
| 5 | Waters Construction Co Inc | $9,399,438 | +10% |
| 6 | Elq Industries Inc | $9,973,914 | +16% |
| 7 | Montesano Bros Inc | $10,984,908 | +28% |
| 8 | Jrcruz Corp | $11,260,000 | +31% |
| 9 | Restani Construction Corp | $14,550,213 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morano Brothers Corp | 2. Petrillo Contracting Inc | 3. Yonkers Contracting Company Inc | 4. Grace Industries LLC | 5. Waters Construction Co Inc | 6. Elq Industries Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | (304.00010018) | 15,520 | $2.00 | $1.80 | $5.00 | $0.15 | $1.00 | $8.00 | |
| 2 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 3 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 480 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 4 | (404.0179) | TON | 490 | $195.00 | $240.00 | $150.00 | $230.00 | $180.00 | $180.00 |
| 5 | (404.1969) | TON | 520 | $235.00 | $240.00 | $300.00 | $360.00 | $300.00 | $252.00 |
| 6 | (406.1261) | TON | 10,910 | $185.00 | $233.00 | $150.00 | $240.00 | $207.00 | $177.00 |
| 7 | Straight Tack Coat (407.0103) | GAL | 4,860 | $13.00 | $15.00 | $11.00 | $5.50 | $13.00 | $11.40 |
| 8 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 75,010 | $1.50 | $2.00 | $1.00 | $0.15 | $1.90 | $1.10 |
| 9 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 86,130 | $8.30 | $10.00 | $8.00 | $10.00 | $8.00 | $9.40 |
| 10 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,170 | $31.00 | $30.00 | $25.00 | $43.00 | $38.00 | $34.00 |
| 11 | (502.0021) | 160 | $550.00 | $950.00 | $310.00 | $1,150.00 | $2,000.00 | $491.75 | |
| 12 | (502.0041) | 440 | $550.00 | $980.00 | $1,200.00 | $1,150.00 | $1,300.00 | $913.00 | |
| 13 | (502.0141) | 30 | $1,000.00 | $1,100.00 | $1,600.00 | $1,240.00 | $2,100.00 | $1,070.00 | |
| 14 | (502.0241) | 40 | $1,200.00 | $1,250.00 | $1,800.00 | $1,460.00 | $2,200.00 | $1,401.00 | |
| 15 | (502.9100) | 960 | $10.00 | $38.00 | $70.00 | $27.00 | $50.00 | $44.00 | |
| 16 | Longitudinal Joints (502.9110) | LF | 1,590 | $10.00 | $38.00 | $40.00 | $27.00 | $29.00 | $38.00 |
| 17 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 960 | $10.00 | $14.00 | $11.95 | $16.00 | $13.00 | $13.00 |
| 18 | Sealing Longitudinal Joints -Preformed Elastic Joint Sealer (502.9301) | LF | 1,590 | $10.00 | $45.00 | $39.95 | $54.00 | $16.00 | $43.00 |
| 19 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $4.52 | $4.52 | $4.52 | $4.52 | $4.52 | $4.52 |
| 20 | Production Grinding – New PCC Pavement with Slurry Removal (505.0202) | SY | 1,730 | $15.00 | $30.00 | $21.00 | $34.00 | $39.00 | $32.00 |
| 21 | (510.20000018) | 1,730 | $120.00 | $150.00 | $300.00 | $150.00 | $180.00 | $96.00 | |
| 22 | (604.070801) | EACH | 5 | $2,100.00 | $3,200.00 | $8,000.00 | $2,250.00 | $5,400.00 | $3,000.00 |
| 23 | (604.07290010) | 120 | $63.00 | $100.00 | $100.00 | $140.00 | $163.00 | $74.00 | |
| 24 | (604.07600008) | 50 | $2,200.00 | $6,500.00 | $9,000.00 | $3,120.00 | $6,550.00 | $8,400.00 | |
| 25 | (604.07610008) | 30 | $3,100.00 | $7,000.00 | $10,000 | $5,210.00 | $9,650.00 | $9,381.00 | |
| 26 | Concrete Sidewalks and Driveways (608.0101) | CY | 60 | $2,200.00 | $1,100.00 | $4,500.00 | $2,710.00 | $1,200.00 | $2,677.00 |
| 27 | (608.02010015) | 230 | $150.00 | $200.00 | $750.00 | $190.00 | $420.00 | $327.00 | |
| 28 | (608.02020015) | 80 | $230.00 | $130.00 | $75.00 | $240.00 | $1,182.00 | $629.00 | |
| 29 | (608.21000003) | 70 | $390.00 | $600.00 | $300.00 | $680.00 | $540.00 | $338.00 | |
| 30 | (609.0401) | LF | 690 | $110.00 | $90.00 | $115.00 | $140.00 | $78.00 | $141.00 |
| 31 | Turf Establishment – Performance (610.1605) | SY | 220 | $3.00 | $20.00 | $5.00 | $20.00 | $57.00 | $19.00 |
| 32 | Basic Work Zone Traffic Control (Daily Operations) (619.0101) | LS | 1 | $850,000 | $310,000 | $698,000 | $581,000 | $950,000 | $1,695,378 |
| 33 | (619.0901) | LF | 98,340 | $0.65 | $1.00 | $0.60 | $0.75 | $0.55 | $0.60 |
| 34 | (619.110511) | EACH | 10 | $20,000 | $25,000 | $8,000.00 | $15,900 | $7,500.00 | $23,041 |
| 35 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 33 | $280.00 | $280.00 | $250.00 | $340.00 | $250.00 | $268.00 |
| 36 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $650,000 | $280,000 | $100,000 | $209,000 | $162,000 | $300,000 |
| 37 | Traffic Control Supervisor (619.25) | MONTH | 6 | $32,000 | $15,000 | $30,000 | $29,300 | $31,000 | $30,000 |
| 38 | Cleaning Closed Drainage Systems (621.03) | LF | 3,600 | $13.00 | $16.00 | $8.50 | $16.00 | $13.00 | $18.00 |
| 39 | Cleaning Drainage Structures (621.04) | EACH | 119 | $600.00 | $900.00 | $900.00 | $880.00 | $445.00 | $863.00 |
| 40 | Survey Operations (625.01) | LS | 1 | $150,000 | $100,000 | $40,000 | $17,300 | $55,000 | $103,000 |
| 41 | (627.50140008) | 4,140 | $6.00 | $7.00 | $11.00 | $7.00 | $8.00 | $8.00 | |
| 42 | (633.05040008) | LS | 1 | $250,000 | $40,000 | $675,001 | $178,000 | $9,700.00 | $130,000 |
| 43 | (635.13010011) | 2,020 | $1.00 | $6.00 | $0.90 | $1.00 | $0.85 | $1.00 | |
| 44 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $8,500.00 | $6,000.00 | $3,000.00 | $3,680.00 | $5,400.00 | $7,033.00 |
| 45 | Engineer’s Field Office – Type 4 (637.14) | MONTH | 15 | $5,500.00 | $10,000 | $15,000 | $6,760.00 | $6,400.00 | $6,164.00 |
| 46 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Cast Frame F2, UnMountable Curb Box CU2 & Reticuline Grate G2 (655.0705) | EACH | 30 | $3,600.00 | $2,200.00 | $3,300.00 | $2,030.00 | $2,300.00 | $2,462.00 |
| 48 | (662.60030008) | 13 | $410.00 | $220.00 | $200.00 | $2,250.00 | $600.00 | $559.00 | |
| 49 | Adjust Existing Valve Box Elevation (663.33) | EACH | 11 | $160.00 | $200.00 | $250.00 | $110.00 | $600.00 | $564.00 |
| 50 | (680.05010007) | 11 | $30,000 | $30,000 | $26,400 | $35,700 | $26,400 | $28,320 | |
| 51 | (680.05020007) | 11 | $5,000.00 | $5,000.00 | $4,500.00 | $6,090.00 | $4,500.00 | $4,827.00 | |
| 52 | (680.51200208) | 38 | $50.00 | $1,000.00 | $150.00 | $2,850.00 | $2,929.38 | $356.00 | |
| 53 | (685.16010014) | 14,260 | $1.65 | $2.10 | $1.50 | $2.00 | $1.45 | $1.60 | |
| 54 | (685.17010014) | 39,880 | $1.65 | $2.10 | $1.50 | $2.00 | $1.45 | $1.60 | |
| 55 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 36,640 | $2.80 | $1.50 | $2.60 | $3.50 | $2.50 | $2.75 |
| 56 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 7,560 | $2.80 | $1.70 | $2.60 | $3.50 | $2.50 | $2.80 |
| 57 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 96 | $105.00 | $150.00 | $98.00 | $130.00 | $95.00 | $105.00 |
| 58 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 44 | $140.00 | $150.00 | $129.00 | $170.00 | $125.00 | $138.00 |
| 59 | Field Change Payment (FCP) (697.03) | DOL | 400,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 60 | Asphalt Price Adjustment (698.04) | DOL | 8,608 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 61 | Fuel Price Adjustment (698.05) | DOL | 5,908 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 62 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 63 | Mobilization (699.040001) | LS | 1 | $320,000 | $344,000 | $350,000 | $349,475 | $358,000 | $382,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.