Montesano Bros Inc: NYSDOT bid record

Montesano Bros Inc submitted 22 bids on New York State DOT contracts in the data, from 19 JAN 2023 to 21 MAY 2026, and was the low bidder on 1 of them (5%). When it was not low, its total sat a median +28% above the low bid.

Owner
New York State DOT
Low bid volume
$4,890,205
Latest bid
21 MAY 2026
Data through
15 OCT 2026
22Bids
1Low bids
5Win rate, percent
+28%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2023700%
20243133%
2025400%
2026800%
Montesano Bros Inc, NYSDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL2222 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL2222 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL2222 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL2222 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1919 (100%)$1.00$1.00
Pavement Density Quality Adjustment to Asphalt Items404.0002QUALITY UNIT1212 (100%)$140.00$110.00
Longitudinal Joint Density Quality Adjustment to Asphalt Items404.0003QUALITY UNIT1010 (100%)$140.00$110.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT88 (100%)$105.00$85.00
Pavement Density Quality Adjustment to Asphalt Items404.000021QUALITY UNIT88 (100%)$105.00$85.00
Plant Production Quality Adjustment to 624.020101624.020110QUALITY UNIT77 (100%)$110.00$110.00
Unclassified Excavation and Disposal203.02CY196 (32%)$179.00$71.00
404.0001TON66 (100%)$120.00$95.00
Montesano Bros Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Elq Industries Inc1613 of 16
Morano Brothers Corp1513 of 15
Jrcruz Corp94 of 9
Grace Industries LLC97 of 9
Yonkers Contracting Company Inc97 of 9
Northbrook Contracting Corp44 of 4
Petrillo Contracting Inc44 of 4
Paleen Construction Corp33 of 3
Tilcon New York Inc33 of 3
Transit Construction Corp22 of 2
Montesano Bros Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
21 MAY 2026D265781Region 08INTERCHANGE IMPROVEMENTS - CROSS COUNTY PARKWAY EXIT 34 of 5$3,772,961+24%
21 MAY 2026D265783Region 08WALL REPAIR: ROUTE 22 - SCARSDALE2 of 3$5,812,231+16%
26 MAR 2026D265748Region 08PMI: RESURFACING OF ROUTE 117 AND ROUTE 9A6 of 6$17,899,594+32%
26 MAR 2026D265749Region 08PAVEMENT MAINTENANCE - Various Routes4 of 4$4,610,744+41%
26 FEB 2026D265647Region 08Wall Repair, Drainage and Pavement Improvements.3 of 3$4,889,666+15%
22 JAN 2026D265654Region 08PAVEMENT RESURFACING - US ROUTE 1 AND PUTNAM AVENUE7 of 9$10,984,908+28%
22 JAN 2026D265679Region 08PAVEMENT RESURFACING - Routes 133 & 100B6 of 6$9,515,002+23%
08 JAN 2026D265648Region 08ROADWAY RESURFACING - Route 303, SH 8448, 50028 of 8$13,351,384+45%
24 APR 2025D265484Region 08ROUTE 134 RESURFACING ROUTE 9A6 of 6$3,301,073+61%
20 MAR 2025D265471Region 08RESURFACING - Route 3126 of 6$2,997,749+43%
27 FEB 2025D265424Region 08Replacement and Relining of Culverts - Various locations4 of 5$16,581,083+24%
20 FEB 2025D265427Region 08ROUTE 52 - RESURFACING PUTNAM COUNTY7 of 7$4,816,447+21%
12 SEP 2024D265312Region 08RESURFACING - ROUTES 100A 100B TO 100C/1001 of 6$4,890,205Low, 0.0% under the second
09 MAY 2024D265254Region 08ROUTE 9A RESURFACING ROUTE 133 TO MAIDEN LANE3 of 6$16,984,555+6.0%
28 MAR 2024D265217Region 08Highway Reconstruction US Rt 6 at Annsville Circle6 of 6$36,975,816+54%
13 JUL 2023D265052Region 08Route 35/202 Resurfacing, TSP to Route 1183 of 4$4,799,012+16%
04 MAY 2023D265029Region 08PMI PAVING: ROUTE 1 AND NEW ROCHELLE REFERENCE ROUTES4 of 6$13,803,370+35%
20 APR 2023D265009Region 08HIGHWAY - SAFETY IMPROVEMENTS - Various Locations3 of 3$7,612,451+35%
23 MAR 2023D264989Region 08RT6 & RT125 PAVE/PED IMPROVEMENTS TOWN CORTLANDT/MAMARONECK5 of 5$6,954,961+37%
23 MAR 2023D265003Region 08ROUTE 52 PAVING3 of 3$4,511,060+16%
16 FEB 2023D264937Region 08PMI ROUTE 9, GREENGURGH, WESTCHESTER COUNTY2 of 6$9,391,732+3.0%
19 JAN 2023D264967Region 08TACONIC STATE PARKWAY8 of 8$4,850,000+158%
Montesano Bros Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way