NYSDOT contract D265748 bid tabulation
PMI: RESURFACING OF ROUTE 117 AND ROUTE 9A. Let by New York State DOT on March 26, 2026, Westchester, Region 08. 6 bids received; low bid $13,511,530 by Yonkers Contracting Company Inc.
- Owner
- New York State DOT
- Letting
- 26 MAR 2026
- Pay items
- 62
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Yonkers Contracting Company Inc | $13,511,530 | Low |
| 2 | Grace Industries LLC | $13,769,288 | +2.0% |
| 3 | Morano Brothers Corp | $15,052,208 | +11% |
| 4 | Jrcruz Corp | $15,125,000 | +12% |
| 5 | Elq Industries Inc | $16,047,105 | +19% |
| 6 | Montesano Bros Inc | $17,899,594 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Yonkers Contracting Company Inc | 2. Grace Industries LLC | 3. Morano Brothers Corp | 4. Jrcruz Corp | 5. Elq Industries Inc | 6. Montesano Bros Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 530 | $300.00 | $178.00 | $160.00 | $65.00 | $200.00 | $180.00 |
| 2 | (203.24010017) | 510 | $150.00 | $110.00 | $88.00 | $250.00 | $128.00 | $147.00 | |
| 3 | (304.11000008) | 320 | $100.00 | $210.00 | $235.00 | $100.00 | $234.00 | $242.00 | |
| 4 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1,475 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 5 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 576 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 6 | (404.0179) | TON | 3,290 | $120.00 | $180.00 | $165.00 | $125.00 | $159.40 | $162.00 |
| 7 | (404.1969) | TON | 2,950 | $170.00 | $215.00 | $160.00 | $215.00 | $184.90 | $238.00 |
| 8 | (406.1261) | TON | 26,190 | $125.00 | $180.00 | $162.00 | $231.00 | $163.65 | $164.00 |
| 9 | (407.01040009) | 15,280 | $8.00 | $4.45 | $20.00 | $10.00 | $9.00 | $13.55 | |
| 10 | (407.01110004) | 49,750 | $0.50 | $1.00 | $15.00 | $1.35 | $0.50 | $0.36 | |
| 11 | (407.01120007) | 1,110 | $18.00 | $8.00 | $15.00 | $30.00 | $6.10 | $7.32 | |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 175,070 | $0.90 | $0.25 | $1.70 | $1.00 | $1.00 | $1.26 |
| 13 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 206,920 | $6.25 | $7.00 | $5.70 | $7.00 | $6.85 | $9.00 |
| 14 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 11,310 | $20.00 | $18.00 | $15.00 | $25.00 | $21.00 | $30.00 |
| 15 | (502.0021) | 5 | $500.00 | $2,000.00 | $3,500.00 | $5,000.00 | $470.00 | $1,089.00 | |
| 16 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 17 | (604.070801) | EACH | 10 | $5,000.00 | $3,000.00 | $2,180.00 | $2,000.00 | $3,225.00 | $3,626.00 |
| 18 | (604.07600008) | 60 | $5,000.00 | $2,100.00 | $2,890.00 | $5,000.00 | $6,570.00 | $4,933.00 | |
| 19 | (604.07610008) | 20 | $5,500.00 | $3,200.00 | $4,000.00 | $9,000.00 | $8,300.00 | $4,933.00 | |
| 20 | Concrete Sidewalks and Driveways (608.0101) | CY | 20 | $4,000.00 | $3,600.00 | $3,000.00 | $3,200.00 | $2,750.00 | $2,000.00 |
| 21 | (608.02010015) | 40 | $1,000.00 | $250.00 | $245.00 | $65.00 | $368.00 | $382.00 | |
| 22 | (608.02020015) | 20 | $100.00 | $250.00 | $220.00 | $100.00 | $640.00 | $368.00 | |
| 23 | (608.21000003) | 20 | $600.00 | $300.00 | $400.00 | $185.00 | $345.00 | $275.00 | |
| 24 | (609.0401) | LF | 690 | $125.00 | $110.00 | $145.00 | $110.00 | $123.00 | $136.00 |
| 25 | Turf Establishment – Performance (610.1605) | SY | 240 | $15.00 | $18.00 | $3.00 | $20.00 | $20.00 | $38.00 |
| 26 | Basic Work Zone Traffic Control (Daily Operations) (619.0101) | LS | 1 | $871,001 | $553,000 | $950,000 | $1,000,000 | $2,204,000 | $2,700,000 |
| 27 | (619.0901) | LF | 286,510 | $0.30 | $0.50 | $0.56 | $0.50 | $0.33 | $0.43 |
| 28 | (619.110511) | EACH | 14 | $14,000 | $14,000 | $22,000 | $7,000.00 | $25,500 | $24,000 |
| 29 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $500,000 | $375,000 | $750,000 | $250,000 | $850,000 | $500,000 |
| 30 | Traffic Control Supervisor (619.25) | MONTH | 9 | $30,000 | $18,000 | $33,000 | $12,500 | $30,000 | $45,400 |
| 31 | Pavement Patching (Force Acount) (619.2601) | DOL | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | Cleaning Closed Drainage Systems (621.03) | LF | 3,030 | $25.00 | $15.00 | $12.00 | $10.00 | $14.40 | $21.00 |
| 33 | Cleaning Drainage Structures (621.04) | EACH | 110 | $1,000.00 | $770.00 | $680.00 | $1,250.00 | $768.00 | $1,575.00 |
| 34 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 61,480 | $3.00 | $9.30 | $7.00 | $1.00 | $6.00 | $6.30 |
| 35 | Asphalt Gutter (624.020101) | TON | 430 | $200.00 | $326.00 | $290.00 | $300.00 | $226.00 | $410.00 |
| 36 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 22 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 37 | Survey Operations (625.01) | LS | 1 | $50,000 | $30,000 | $56,000 | $150,000 | $100,000 | $175,000 |
| 38 | (627.50140008) | 3,110 | $15.00 | $6.20 | $6.00 | $5.00 | $8.00 | $10.50 | |
| 39 | (633.05040008) | LS | 1 | $1,250,000 | $365,000 | $370,000 | $50,000 | $345,000 | $675,000 |
| 40 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 7,350 | $6.00 | $0.10 | $2.00 | $3.00 | $8.65 | $42.00 |
| 41 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,000.00 | $2,800.00 | $12,000 | $5,000.00 | $6,500.00 | $5,850.00 |
| 42 | Engineer’s Field Office – Type 4 (637.14) | MONTH | 15 | $15,000 | $5,500.00 | $7,200.00 | $7,500.00 | $5,500.00 | $10,000 |
| 43 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 44 | (649.31000008) | 49,750 | $1.10 | $0.80 | $2.00 | $0.50 | $0.72 | $0.60 | |
| 45 | (655.30010010) | 15 | $3,200.00 | $2,000.00 | $3,600.00 | $2,500.00 | $3,100.00 | $2,917.00 | |
| 46 | (662.60030008) | 10 | $300.00 | $95.00 | $580.00 | $1,000.00 | $300.00 | $20.00 | |
| 47 | Adjust Existing Valve Box Elevation (663.33) | EACH | 10 | $300.00 | $95.00 | $160.00 | $350.00 | $300.00 | $120.00 |
| 48 | (680.05010007) | 3 | $30,000 | $33,300 | $35,000 | $30,000 | $33,000 | $33,325 | |
| 49 | (680.05020007) | 3 | $5,000.00 | $5,700.00 | $5,000.00 | $5,000.00 | $5,200.00 | $5,329.00 | |
| 50 | (680.51200208) | 12 | $500.00 | $1,800.00 | $36.00 | $1,250.00 | $410.00 | $67.00 | |
| 51 | (685.07200810) | 21 | $50.00 | $100.00 | $95.00 | $100.00 | $55.00 | $95.00 | |
| 52 | (685.16010014) | 108,350 | $1.40 | $1.60 | $1.50 | $1.70 | $1.50 | $1.52 | |
| 53 | (685.17010014) | 162,110 | $1.40 | $1.54 | $1.50 | $1.70 | $1.50 | $1.52 | |
| 54 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 14,790 | $2.80 | $3.00 | $2.20 | $2.40 | $3.00 | $2.20 |
| 55 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 1,260 | $2.00 | $3.00 | $2.20 | $2.00 | $2.20 | $2.00 |
| 56 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 36 | $75.00 | $172.00 | $140.00 | $150.00 | $83.00 | $140.00 |
| 57 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 21 | $225.00 | $195.00 | $170.00 | $175.00 | $247.00 | $168.00 |
| 58 | Field Change Payment (FCP) (697.03) | DOL | 1,000,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 59 | Asphalt Price Adjustment (698.04) | DOL | 34,239 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 60 | Fuel Price Adjustment (698.05) | DOL | 15,290 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 61 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 62 | Mobilization (699.040001) | LS | 1 | $500,000 | $525,000 | $560,000 | $581,302 | $615,000 | $600,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 26, 2026. Compiled by Mirage Metrics.