Grace Industries LLC: NYSDOT bid record
Grace Industries LLC submitted 51 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 9 of them (18%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $118,460,316
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 14 | 3 | 21% |
| 2023 | 11 | 2 | 18% |
| 2024 | 8 | 2 | 25% |
| 2025 | 9 | 1 | 11% |
| 2026 | 9 | 1 | 11% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 10 | 21 | 3 | 14% |
| Region 08 | 17 | 6 | 35% |
| Region 11 | 11 | 0 | 0% |
| Region MO | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 50 | 50 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 49 | 49 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 47 | 47 (100%) | $1.00 | $1.00 |
| 691.04000020 | 29 | 29 (100%) | $1.00 | $1.00 | ||
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 39 | 24 (62%) | $0.30 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 20 | 20 (100%) | $115.00 | $85.00 |
| Pavement Patching (Force Acount) | 619.2601 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Partnering Workshop | 637.35 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Pavement Density Quality Adjustment to Asphalt Items | 404.000021 | QUALITY UNIT | 14 | 14 (100%) | $112.50 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H & L Contracting LLC | 27 | 24 of 27 |
| Jrcruz Corp | 21 | 4 of 21 |
| Posillico Civil Inc | 15 | 11 of 15 |
| Bove Industries Inc | 15 | 12 of 15 |
| Elq Industries Inc | 15 | 3 of 15 |
| Tully Construction Company Inc | 12 | 8 of 12 |
| Oliveira Contracting Inc | 12 | 8 of 12 |
| Pratt Brothers Inc | 11 | 7 of 11 |
| Restani Construction Corp | 11 | 7 of 11 |
| Morano Brothers Corp | 11 | 6 of 11 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265809 | Region 10 | PIN 0050.30 NY 135 Bridge Replace over I-495 | 3 of 8 | $40,181,997 | +10% |
| 26 MAR 2026 | D265748 | Region 08 | PMI: RESURFACING OF ROUTE 117 AND ROUTE 9A | 2 of 6 | $13,769,288 | +2.0% |
| 12 MAR 2026 | D265672 | Region 11 | Asphalt Pavement Preservation to correct deficiencies. | 4 of 5 | $40,618,147 | +23% |
| 26 FEB 2026 | D265699 | Region 10 | CONCRETE PAVEMENT RESTORATION SOUTHERN STATE PKWY (908M). | 7 of 7 | $19,596,089 | +31% |
| 26 FEB 2026 | D265712 | Region 08 | CORRIDOR PAVING RTE 304: ROCKLAND COUNTY | 2 of 6 | $19,787,583 | +5.0% |
| 05 FEB 2026 | D265653 | Region 08 | PAVEMENT PREVENTATIVE MAINTENANCE - I-287 | 1 of 6 | $25,928,265 | Low, 15% under the second |
| 22 JAN 2026 | D265654 | Region 08 | PAVEMENT RESURFACING - US ROUTE 1 AND PUTNAM AVENUE | 4 of 9 | $9,384,000 | +10% |
| 22 JAN 2026 | D265679 | Region 08 | PAVEMENT RESURFACING - Routes 133 & 100B | 4 of 6 | $8,338,500 | +8.0% |
| 08 JAN 2026 | D265686 | Region 08 | PAVEMENT REHABILITATION - Routes 987F-SH 9480, 987G-SH 9488 | 2 of 6 | $35,949,000 | +2.0% |
| 11 SEP 2025 | D265542 | Region 10 | Bridge Repairs at Various Locations, Town of Hempstead | 3 of 6 | $16,544,155 | +4.0% |
| 24 APR 2025 | D265484 | Region 08 | ROUTE 134 RESURFACING ROUTE 9A | 4 of 6 | $2,615,135 | +28% |
| 10 APR 2025 | D265428 | Region 10 | BRIDGE IMPROVEMENTS - Routes CR 19, 906A, NY 110 & 454 | 3 of 5 | $8,619,721 | +19% |
| 27 MAR 2025 | D265393 | Region 10 | Highway Safety and Mobility Improvements - NY 347 | 5 of 6 | $58,777,347 | +32% |
| 27 MAR 2025 | D265401 | Region 10 | Drainage Improvements Various Locations Suffolk County | 6 of 7 | $21,040,653 | +75% |
| 20 FEB 2025 | D265365 | Region 11 | Pavement Preservation (Asphalt) Queens Counties | 4 of 5 | $11,220,285 | +27% |
| 20 FEB 2025 | D265382 | Region 10 | I-495 Sound Barrier Requirements, Exits 49-57, | 1 of 11 | $8,888,495 | Low, 12% under the second |
| 20 FEB 2025 | D265412 | Region MO | RUNWAY PAVEMENT IMPROVEMENTS - Republic Airport | 4 of 4 | $11,225,611 | +69% |
| 23 JAN 2025 | D265388 | Region 11 | MOBILITY IMPROVEMENTS - CLEARVIEW EXPRESSWAY - Route I-295 | 5 of 7 | $4,223,235 | +44% |
| 19 DEC 2024 | D265350 | Region 10 | PM Bridge Repairs Town of Southampton, Suffolk County | 3 of 5 | $16,881,023 | +9.0% |
| 12 SEP 2024 | D265312 | Region 08 | RESURFACING - ROUTES 100A 100B TO 100C/100 | 3 of 6 | $5,077,205 | +4.0% |
| 06 JUN 2024 | D265268 | Region 08 | PAVEMENT - I287, WESTCHESTER COUNTY | 1 of 4 | $32,377,766 | Low, 0.0% under the second |
| 09 MAY 2024 | D265254 | Region 08 | ROUTE 9A RESURFACING ROUTE 133 TO MAIDEN LANE | 1 of 6 | $16,049,853 | Low, 1.0% under the second |
| 28 MAR 2024 | D265205 | Region 08 | ROUTE 100 PAVING | 2 of 3 | $17,959,172 | +4.0% |
| 14 MAR 2024 | D265169 | Region 11 | Pavement Preservation (Concrete) at Various Locations | 9 of 9 | $21,791,854 | +93% |
| 29 FEB 2024 | D265155 | Region 11 | Safety and Operational Improvements on Jackie Robinson Pkwy | 4 of 5 | $13,563,537 | +41% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.