NYSDOT contract D265388 bid tabulation

MOBILITY IMPROVEMENTS - CLEARVIEW EXPRESSWAY - Route I-295. Let by New York State DOT on January 23, 2025, Queens, Region 11. 7 bids received; low bid $2,942,165 by Es II Enterprises LLC /DBA El Sol Enterprises.

Owner
New York State DOT
Letting
23 JAN 2025
Pay items
146
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Es II Enterprises LLC /DBA El Sol Enterprises$2,942,165Low
2Restani Construction Corp$3,274,673+11%
3Bove Industries Inc$3,725,000+27%
4Jrcruz Corp$4,004,850+36%
5Grace Industries LLC$4,223,235+44%
6Oliveira Contracting Inc$4,525,869+54%
7Quintal Contracting Corp$6,323,599+115%
NYSDOT contract D265388: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Es II Enterprises LLC /DBA El Sol Enterprises2. Restani Construction Corp3. Bove Industries Inc4. Jrcruz Corp5. Grace Industries LLC6. Oliveira Contracting Inc
1Clearing and Grubbing (201.07)ACRE0.50$25,000$300,000$200,000$50,000$33,000$50,000
2Unclassified Excavation and Disposal (203.02)CY919$75.00$200.00$75.00$65.00$190.00$150.00
3Embankment In Place (203.03)CY350$125.00$5.00$40.00$65.00$100.00$200.00
4Select Granular Fill (203.07)CY414$10.00$20.00$40.00$65.00$85.00$95.00
5Trench and Culvert Excavation (206.0201)CY1,628$100.00$28.00$10.00$65.00$115.00$120.00
6Conduit Excavation and Backfill including Surface Restoration (206.03)LF610$20.00$65.00$35.00$125.00$150.00$225.00
7 (206.03180010)20$300.00$30.00$200.00$125.00$260.00$225.00
8 (209.11010024)7$250.00$300.00$900.00$200.00$300.00$550.00
9 (304.00010018)550$1.00$1.00$0.02$20.00$8.50$10.00
10Subbase Course, Type 1 (304.11)CY259$200.00$120.00$40.00$125.00$160.00$200.00
11 (402.25020018)204$40.00$45.00$40.00$25.00$62.00$31.00
12 (404.0001)TON31$175.00$175.00$175.00$175.00$175.00$175.00
13 (404.0189)TON80$225.00$90.00$150.00$300.00$310.00$300.00
14 (404.1281)TON230$225.00$200.00$285.00$300.00$300.00$350.00
15 (404.1959)TON306$200.00$175.00$275.00$300.00$310.00$375.00
16Diluted Tack Coat (407.0102)GAL368$4.00$15.00$25.00$10.00$5.50$15.00
17Asphalt Pavement Joint Adhesive (418.7603)LF3,000$1.00$2.50$2.00$2.00$5.50$8.00
18 (490.10120011)1,925$35.00$25.00$20.00$20.00$25.00$50.00
19 (502.0021)231$600.00$630.00$1,300.00$2,000.00$1,010.00$850.00
20 (502.31010018)155$6.00$100.00$150.00$100.00$290.00$165.00
21 (502.32010011)161$100.00$50.00$50.00$100.00$23.00$125.00
22 (502.33010018)161$50.00$50.00$50.00$100.00$23.00$125.00
23 (502.34010018)141$20.00$40.00$12.00$75.00$30.00$35.00
24 (502.37010018)176$20.00$40.00$12.00$70.00$30.00$35.00
25 (502.38010018)176$20.00$5.00$35.00$40.00$21.00$35.00
26Longitudinal Joints (502.9110)LF775$20.00$30.00$15.00$45.00$37.00$35.00
27Performance Concrete Quality Adjustment - PCC Pavement (502.99)QUALITY UNIT1$3.00$3.00$3.00$3.00$3.00$3.00
28 (502.99110011)2$1,000.00$3,000.00$1,300.00$2,500.00$5,000.00$3,000.00
29 (520.05000010)860$5.00$5.00$4.50$6.00$8.00$2.00
30Shields and Shoring (552.17)SF15,324$1.00$1.50$1.00$2.00$1.00$1.00
31 (603.6002)LF121$100.00$230.00$350.00$375.00$315.00$571.00
32 (603.6003)LF146$150.00$230.00$500.00$385.00$400.00$704.00
33 (603.6005)LF290$200.00$450.00$700.00$400.00$540.00$813.00
34Concrete Collars (603.77)EACH2$500.00$1,500.00$1,050.00$2,500.00$4,880.00$4,000.00
35 (604.02020011)24$800.00$1,500.00$700.00$1,250.00$1,130.00$2,235.00
36 (604.04850011)26$800.00$1,000.00$900.00$400.00$860.00$3,500.00
37 (604.071101)EACH1$4,000.00$1,000.00$10,000$5,000.00$13,000$3,500.00
38 (604.07200110)1$4,000.00$1,500.00$2,500.00$2,500.00$1,990.00$2,500.00
39 (604.07210110)2$4,000.00$1,000.00$1,500.00$1,000.00$1,990.00$1,500.00
40 (604.07240110)1$4,000.00$5,000.00$8,500.00$5,000.00$13,000$3,750.00
41 (604.07260011)3$4,000.00$500.00$1,500.00$1,250.00$2,650.00$2,100.00
42 (604.07280010)5$25.00$150.00$400.00$200.00$340.00$200.00
43 (604.13000011)4$2,500.00$2,500.00$2,500.00$3,500.00$6,170.00$2,000.00
44HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH1$7,000.00$10,000$8,500.00$15,000$13,200$9,350.00
45HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF713$50.00$70.00$55.00$100.00$92.00$60.50
46Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH1$6,000.00$9,000.00$7,000.00$15,000$12,200$7,700.00
47 (607.36000011)160$200.00$110.00$150.00$130.00$170.00$165.00
48 (607.41010010)770$10.00$10.00$10.00$6.00$17.00$50.00
49Concrete Sidewalks and Driveways (608.0101)CY7$1,000.00$700.00$775.00$1,850.00$1,550.00$2,000.00
50 (608.02010015)7$500.00$400.00$75.00$65.00$370.00$500.00
51Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON42$250.00$300.00$300.00$500.00$640.00$600.00
52Embedded Detectable Warning Units (608.21)SY3$700.00$400.00$400.00$162.00$1,010.00$150.00
53 (609.04030510)762$70.00$100.00$135.00$85.00$115.00$200.00
54 (609.06000008)755$10.00$1.00$95.00$50.00$31.00$10.00
55 (609.26020111)45$150.00$300.00$500.00$250.00$130.00$500.00
56Topsoil - Lawns (610.1403)CY260$90.00$100.00$50.00$100.00$140.00$138.60
57Turf Establishment - Roadside (610.1601)SY1,560$2.00$2.00$15.00$2.50$3.00$5.50
58Watering Vegetation (610.19)1,000 GALLONS333$150.00$150.00$1.00$150.00$205.00$50.60
59Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411)EACH4$450.00$450.00$750.00$550.00$700.00$825.00
60Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421)EACH3$600.00$600.00$900.00$750.00$930.00$900.00
61Tree Root Zone Treatment (Vertical Mulching/Aeration) (614.08)SY200$45.00$45.00$34.00$55.00$70.00$27.22
62 (614.08120009)255$60.00$60.00$125.00$75.00$93.00$95.00
63Tree Root Pruning (614.09)LF205$75.00$25.00$110.00$5.00$220.00$150.00
64 (615.33010011)3$250.00$1,000.00$1,200.00$250.00$1,550.00$2,000.00
65 (615.43000011)1,517$40.00$15.00$20.00$5.00$35.00$50.00
66Basic Work Zone Traffic Control (619.01)LS1$400,000$180,000$486,000$350,000$165,633$500,000
67 (619.100101)LF200$5.00$9.50$4.90$5.50$7.00$5.00
68 (619.110511)EACH1$10,000$30,000$15,000$20,000$4,220.00$45,000
69Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF755$40.00$150.00$75.00$115.00$70.00$80.00
70Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH1$25,000$20,000$8,000.00$80,000$28,100$20,000
71Nighttime Operations (Entire Project) (619.24)LS1$40,000$50,000$124,158$100,000$46,600$75,000
72 (619.67020010)LS1$90,000$100,000$75,000$150,000$88,600$62,000
73Cleaning Closed Drainage Systems (621.03)LF175$25.00$15.00$10.00$25.00$31.00$33.00
74Cleaning Drainage Structures (621.04)EACH4$400.00$750.00$1,200.00$2,200.00$1,160.00$1,200.00
75Survey Operations (625.01)LS1$75,000$50,000$85,000$125,000$45,000$60,000
76 (625.09010015)LS1$5,000.00$15,000$9,000.00$10,000$9,970.00$25,000
77Cleaning, Sealing and/or Filling Joints (633.13)LF204$20.00$27.00$30.00$25.00$42.00$26.00
78Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15)SY155$30.00$200.00$100.00$185.00$910.00$110.00
79 (634.07050003)556$10.00$10.00$9.00$10.00$17.00$27.00
80Concrete Cylinder Curing Equipment (637.04)EACH1$2,000.00$500.00$5,550.00$3,000.00$5,040.00$5,000.00
81Engineer’s Field Office – Type 3 (637.13)MONTH14$5,000.00$15,000$13,000$7,500.00$11,500$12,000
82 (637.31020020)14$950.00$1,000.00$950.00$1,000.00$1,000.00$1,000.00
83Office Technology and Supplies (637.34)DOL8,500$1.00$1.00$1.00$1.00$1.00$1.00
84 (639.10210011)LS1$55,000$50,000$50,000$50,000$50,000$50,000
85 (642.31200024)4,680$1.00$3.50$10.00$1.00$16.00$2.00
86Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF139$65.00$85.00$84.00$100.00$130.00$77.00
87Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF75$85.00$90.00$87.00$100.00$140.00$85.70
88 (645.62000110)176$65.00$120.00$75.00$140.00$180.00$82.50
89Type A Sign Posts (645.81)EACH9$325.00$300.00$350.00$350.00$470.00$385.00
90Concrete Footing for Type A, or Breakaway Wooden Sign Posts with Steel Tube Inserts (645.8107)EACH9$300.00$1,200.00$300.00$1,500.00$1,810.00$330.00
91Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25)EACH1$500.00$12,500$750.00$17,500$19,400$14,130
92Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH24$65.00$175.00$65.00$200.00$260.00$71.50
93Remove and Store Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.42)EACH2$125.00$175.00$150.00$200.00$260.00$165.00
94 (655.00040011)2$600.00$1,000.00$500.00$600.00$1,390.00$2,000.00
95 (655.00050011)2$2,700.00$1,000.00$1,100.00$550.00$1,060.00$2,000.00
96 (655.00060011)2$2,000.00$500.00$300.00$425.00$810.00$2,000.00
97 (655.00120011)2$1,500.00$1,500.00$1,200.00$360.00$600.00$2,000.00
98Miscellaneous Metals (656.01)LB350$20.00$17.50$2.00$5.00$33.00$10.00
99 (660.09020011)5$5,200.00$15,000$8,500.00$10,500$13,700$8,440.00
100 (660.09040011)2$9,600.00$15,000$10,000$13,500$15,000$11,130
101 (660.75000010)8$700.00$390.00$1,200.00$475.00$1,290.00$390.00
102 (661.03020011)380$5.00$6.50$6.75$8.00$5.50$6.50
103 (661.03050011)100$7.00$9.00$9.05$10.00$7.50$8.70
104 (661.03060011)3,395$12.00$10.00$10.00$11.50$15.00$9.65
105 (661.03080011)733$16.00$14.00$14.00$17.00$21.00$14.00
106 (661.24020011)5$500.00$1,000.00$600.00$1,560.00$1,970.00$500.00
107 (661.24110011)5$1,200.00$1,500.00$815.00$950.00$2,820.00$780.00
108 (661.34070011)5$6,000.00$2,750.00$6,000.00$3,775.00$6,120.00$1,650.00
109 (670.01100039)5$850.00$950.00$1,000.00$1,150.00$890.00$945.00
110 (670.11200011)5$440.00$715.00$745.00$875.00$970.00$715.00
111 (670.11250611)5$7,000.00$5,100.00$5,300.00$6,220.00$14,900$5,090.00
112 (670.14480010)3$500.00$400.00$500.00$1,075.00$860.00$1,850.00
113 (670.14480011)3$3,000.00$5,850.00$900.00$7,100.00$13,200$5,815.00
114 (670.2003)LF505$75.00$65.00$65.00$75.00$97.00$62.20
115 (670.2004)LF50$126.00$115.00$116.00$135.00$140.00$112.00
116 (670.2005)LF50$202.00$125.00$127.00$150.00$200.00$122.00
117 (670.2007)LF10$71.00$60.00$63.00$75.00$81.00$60.40
118 (670.2602)LF20$64.00$30.00$31.00$35.00$40.00$30.00
119 (670.40010008)10$420.00$475.00$495.00$580.00$400.00$475.00
120 (670.75010005)1$750.00$830.00$865.00$1,015.00$2,170.00$830.00
121 (670.75020011)1,247$9.00$9.65$10.00$12.00$15.00$9.65
122 (670.75050011)40$5.00$9.00$9.00$10.00$7.50$8.70
123 (670.75080011)190$4.00$6.50$7.00$8.00$5.50$6.50
124 (670.94110010)LS1$7,000.00$15,000$30,000$20,000$46,700$14,740
125 (670.99010011)5$185.00$280.00$292.00$340.00$480.00$280.00
126 (680.51000010)1$3,000.00$2,000.00$1,050.00$1,600.00$860.00$3,500.00
127 (680.510501)EACH2$6,700.00$7,500.00$4,200.00$5,560.00$10,000$3,890.00
128 (680.51100010)3$835.00$625.00$250.00$760.00$1,010.00$625.00
129 (680.730310)LF45$15.00$14.00$15.00$17.00$24.00$14.00
130 (680.79300010)2$420.00$625.00$650.00$760.00$1,770.00$625.00
131 (680.81310039)2$2,000.00$1,205.00$1,250.00$1,475.00$4,430.00$1,205.00
132 (680.8151)EACH1$2,500.00$2,125.00$2,200.00$2,600.00$3,620.00$2,125.00
133 (680.8152)EACH1$8,000.00$5,950.00$9,500.00$7,250.00$7,650.00$5,950.00
134Breakaway Transformer Base (680.8223)EACH1$1,400.00$1,715.00$1,800.00$2,100.00$4,030.00$1,715.00
135 (680.99120011)200$17.00$105.00$110.00$125.00$64.00$105.00
136White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF690$2.00$1.80$2.00$3.00$3.00$5.00
137Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF200$2.00$1.80$2.00$3.00$3.00$5.00
138 (685.16010014)4,514$2.00$1.95$2.00$3.00$3.00$5.00
139 (685.17010014)788$2.00$1.95$2.00$3.00$3.00$5.00
140White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH16$150.00$150.00$175.00$200.00$230.00$500.00
141White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH8$200.00$200.00$225.00$250.00$310.00$500.00
142Field Change Payment (FCP) (697.03)DOL265,000$1.00$1.00$1.00$1.00$1.00$1.00
143Asphalt Price Adjustment (698.04)DOL757$1.00$1.00$1.00$1.00$1.00$1.00
144Fuel Price Adjustment (698.05)DOL379$1.00$1.00$1.00$1.00$1.00$1.00
145Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
146Mobilization (699.040001)LS1$110,000$115,000$140,000$153,069$162,000$172,918
NYSDOT contract D265388: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy