Oliveira Contracting Inc: NYSDOT bid record
Oliveira Contracting Inc submitted 27 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 26 MAR 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $43,013,878
- Latest bid
- 26 MAR 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 6 | 1 | 17% |
| 2023 | 8 | 2 | 25% |
| 2024 | 5 | 0 | 0% |
| 2025 | 4 | 0 | 0% |
| 2026 | 4 | 1 | 25% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 10 | 14 | 1 | 7% |
| Region 11 | 12 | 3 | 25% |
| Region 08 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 26 | 26 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 26 | 26 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 25 | 25 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| 691.04000020 | 21 | 21 (100%) | $1.00 | $1.00 | ||
| Construction Testing supplies – Consumables | 637.36 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Pavement Patching (Force Acount) | 619.2601 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Partnering Workshop | 637.35 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 8 | 8 (100%) | $125.00 | $85.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 6 | 6 (100%) | $125.00 | $90.00 |
| 404.0001 | TON | 6 | 6 (100%) | $132.50 | $95.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bove Industries Inc | 16 | 10 of 16 |
| H & L Contracting LLC | 15 | 9 of 15 |
| Jrcruz Corp | 14 | 4 of 14 |
| Defoe Corporation | 12 | 5 of 12 |
| Grace Industries LLC | 12 | 4 of 12 |
| Triumph Construction Corp | 11 | 5 of 11 |
| Quintal Contracting Corp | 11 | 5 of 11 |
| Gateway Industries Inc | 9 | 2 of 9 |
| Peter Scalamandre & Sons Inc | 9 | 3 of 9 |
| Pratt Brothers Inc | 8 | 4 of 8 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 MAR 2026 | D265681 | Region 11 | CONCRETE PAVEMENT PRESERVATION NASSAU CLEARVIEW & BELT PKWY | 2 of 13 | $15,406,399 | +8.0% |
| 12 MAR 2026 | D265680 | Region 11 | CONCRETE PAVEMENT PRESERVATION ON CBE & BQE IN NYC | 6 of 9 | $26,977,731 | +51% |
| 05 FEB 2026 | D265677 | Region 11 | HIGHWAY MAINTENANCE DRAINAGE/ CONCRETE - I-95 & I-495 | 1 of 7 | $17,698,409 | Low, 4.0% under the second |
| 22 JAN 2026 | D265655 | Region 10 | INTERSECTION IMPROVEMENTS - NY Rte 25 at Mt Sinai Coram Rd | 6 of 9 | $5,035,569 | +43% |
| 10 APR 2025 | D265460 | Region 10 | WANTAGH STATE PARKWAY SB RAMPS IMPROVEMENT AT OLD COUNTRY RD | 4 of 11 | $8,695,000 | +28% |
| 20 FEB 2025 | D265382 | Region 10 | I-495 Sound Barrier Requirements, Exits 49-57, | 10 of 11 | $16,287,772 | +83% |
| 23 JAN 2025 | D265388 | Region 11 | MOBILITY IMPROVEMENTS - CLEARVIEW EXPRESSWAY - Route I-295 | 6 of 7 | $4,525,869 | +54% |
| 09 JAN 2025 | D265352 | Region 11 | ADA Requirements Contract New York City | 3 of 4 | $1,998,446 | +64% |
| 19 DEC 2024 | D265350 | Region 10 | PM Bridge Repairs Town of Southampton, Suffolk County | 2 of 5 | $16,297,719 | +6.0% |
| 26 SEP 2024 | D265214 | Region 10 | Drainage Enhancement Various Locations Nassau County | 3 of 7 | $11,009,968 | +16% |
| 20 JUN 2024 | D265247 | Region 11 | GCP Safety and Mobility Improvements 907M | 5 of 8 | $17,403,311 | +17% |
| 14 MAR 2024 | D265169 | Region 11 | Pavement Preservation (Concrete) at Various Locations | 4 of 9 | $14,380,027 | +27% |
| 29 FEB 2024 | D265155 | Region 11 | Safety and Operational Improvements on Jackie Robinson Pkwy | 3 of 5 | $11,785,191 | +23% |
| 14 DEC 2023 | D265130 | Region 10 | NYS RT 27 Median Barrier Replacement, Suffolk County. | 4 of 10 | $9,428,713 | +7.0% |
| 30 NOV 2023 | D265117 | Region 10 | CONCRETE REPAIRS NY25 TO NY25B BRUSH HOLLOW RD | 12 of 14 | $10,816,290 | +48% |
| 09 NOV 2023 | D265106 | Region 10 | PM Bridge Repair Contract - BIN 1018249, BIN 1058780 | 1 of 8 | $8,595,320 | Low, 8.0% under the second |
| 24 AUG 2023 | D265059 | Region 10 | CONCRETE REPAIRS NY27 FROM NY112 TO CR101 & ON SMSP/SGSP | 7 of 11 | $13,966,015 | +17% |
| 13 JUL 2023 | D265043 | Region 10 | I-495 CONCRETE PAVEMENT REPAIRS | 3 of 13 | $14,404,712 | +16% |
| 01 JUN 2023 | D265031 | Region 10 | CONCRETE PAVEMENT RESTORATION VARIOUS LOCATIONS | 10 of 12 | $12,872,988 | +42% |
| 06 APR 2023 | D264965 | Region 11 | Where and When General Repairs, All Counties in NYC | 7 of 7 | $23,173,600 | +23% |
| 02 FEB 2023 | D264899 | Region 11 | PAVEMENT PRESERVATION (CONCRETE) | 1 of 8 | $13,432,406 | Low, 26% under the second |
| 15 DEC 2022 | D264916 | Region 11 | Reconstruction of two SB Henry Hudson Parkway Retaining wall | 4 of 11 | $8,343,250 | +23% |
| 06 OCT 2022 | D264851 | Region 10 | Bridge Rehabilitation Project WB NY 27 at Barnes Road | 2 of 5 | $7,362,031 | +4.0% |
| 01 SEP 2022 | D264810 | Region 08 | I287 over Metro North I287 over Midland Avenue | 4 of 9 | $29,747,737 | +8.0% |
| 16 JUN 2022 | D264802 | Region 10 | CONCRETE PAVEMENT REPAIRS LIE Exit 64 to 67 NYSDOT R-10 | 2 of 8 | $7,497,000 | +4.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.