NYSDOT contract D265382 bid tabulation

I-495 Sound Barrier Requirements, Exits 49-57,. Let by New York State DOT on February 20, 2025, Suffolk, Region 10. 11 bids received; low bid $8,888,495 by Grace Industries LLC.

Owner
New York State DOT
Letting
20 FEB 2025
Pay items
62
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Grace Industries LLC$8,888,495Low
2Citnalta Construction Corp$9,970,956+12%
3Rosemar Contracting Inc$10,812,298+22%
4Bove Industries Inc$11,127,750+25%
5Posillico Civil Inc$11,249,533+27%
6Peter Scalamandre & Sons Inc$11,487,000+29%
7Suffolk Paving Corp$11,906,962+34%
8Constar Inc$13,364,839+50%
9H & L Contracting LLC$14,615,587+64%
10Oliveira Contracting Inc$16,287,772+83%
11Quintal Contracting Corp$19,785,060+123%
NYSDOT contract D265382: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Grace Industries LLC2. Citnalta Construction Corp3. Rosemar Contracting Inc4. Bove Industries Inc5. Posillico Civil Inc6. Peter Scalamandre & Sons Inc
1Clearing and Grubbing (201.07)ACRE2$29,200$75,000$15,000$60,000$200,000$343,350
2Removal of Substructures (202.19)CY45$1,150.00$1,000.00$1,750.00$2,000.00$5,400.00$2,600.00
3Unclassified Excavation and Disposal (203.02)CY1,270$175.00$180.00$100.00$140.00$550.00$750.00
4Embankment In Place (203.03)CY1,311$130.00$140.00$35.00$140.00$60.00$130.00
5Trench and Culvert Excavation (206.0201)CY208$210.00$550.00$175.00$400.00$350.00$100.00
6Footing Concrete, Performance (555.0011)CY174$1,100.00$1,750.00$2,200.00$2,200.00$1,300.00$900.00
7Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$6.00$6.00$6.00$6.00$6.00$6.00
8Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB12,685$14.00$3.10$4.00$5.00$3.00$3.00
9Resetting HPBO (Mod.) Corrugated Beam Guide Railing (606.58)LF2,950$153.00$62.45$60.00$61.50$105.00$60.00
10 (607.41010010)5,900$8.00$15.00$2.50$4.00$12.00$0.50
11 (607.98020010)185,000$11.50$15.00$33.00$23.00$23.50$23.00
12 (607.98030010)29,600$23.00$7.00$5.00$16.00$32.50$27.00
13Mycorrhizal Fungi (610.0701)LB930$15.00$11.50$10.00$23.75$10.00$25.00
14Moisture Retention Additive (610.08)LB930$12.00$9.20$8.00$23.75$8.00$25.00
15Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY1,092$105.00$82.80$72.00$42.75$72.00$45.00
16Weed Removal (610.13)SY3,300$12.00$9.20$8.00$6.65$8.00$7.00
17Topsoil - Roadside (610.1402)CY1,092$114.00$89.70$78.00$93.00$78.00$98.00
18Turf Establishment - Roadside (610.1601)SY3,300$4.00$3.34$2.90$5.70$2.90$6.00
19Watering Vegetation (610.19)1,000 GALLONS955$110.00$101.20$88.00$1.00$88.00$1.00
20 (611.0171)EACH267$1,250.00$1,138.50$990.00$1,100.00$990.00$1,500.00
21 (611.0201)EACH267$950.00$793.50$690.00$902.00$690.00$950.00
22 (611.0361)EACH267$700.00$575.00$500.00$617.00$500.00$650.00
23 (611.0441)EACH250$120.00$103.50$90.00$42.50$90.00$45.00
24 (611.0451)EACH250$175.00$149.50$130.00$61.50$130.00$65.00
25 (611.0461)EACH250$300.00$253.00$220.00$75.00$220.00$79.00
26 (611.0561)EACH250$225.00$195.50$170.00$80.50$170.00$85.00
27 (611.0651)EACH1,968$45.00$36.80$32.00$26.50$32.00$28.00
28Post-Planting Care (611.19)EACH3,769$9.00$6.60$6.00$1.00$6.00$1.00
29 (611.19010024)267$29.00$22.00$20.00$1.00$20.00$1.00
30 (611.19020024)267$17.00$12.93$11.75$1.00$12.00$1.00
31 (611.19030024)267$17.00$12.93$11.75$1.00$12.00$1.00
32 (611.19040024)750$9.50$7.15$6.50$1.00$6.50$1.00
33 (611.19050024)250$11.00$8.25$7.50$1.00$7.50$1.00
34 (611.19060024)1,968$2.00$1.65$1.50$1.00$1.50$1.00
35 (614.060102)EACH1,000$95.00$74.75$65.00$300.00$65.00$500.00
36 (614.060202)EACH175$204.00$161.00$140.00$760.00$140.00$900.00
37 (614.060302)EACH175$569.00$448.50$390.00$855.00$390.00$1,000.00
38 (614.060402)EACH75$1,738.00$1,368.50$1,190.00$941.00$1,190.00$1,100.00
39 (614.060502)EACH75$3,176.00$2,501.25$2,175.00$1,710.00$2,175.00$1,900.00
40 (617.01010024)7,375$5.00$4.03$3.50$1.00$3.50$0.65
41 (617.01020024)7,375$8.50$6.79$5.90$7.00$5.90$8.00
42 (617.01030024)500$127.00$100.05$87.00$200.00$87.00$75.00
43 (617.10000024)500$80.00$63.25$55.00$71.25$55.00$75.00
44 (617.11000024)LS1$2,920.00$2,300.00$2,000.00$4,750.00$2,000.00$5,000.00
45Basic Work Zone Traffic Control (Daily Operations) (619.0101)LS1$850,911$2,100,291$500,000$781,367$400,000$20,000
46Type III Construction Barricades (619.04)EACH20$397.00$400.00$75.00$500.00$130.00$100.00
47 (619.10050020)600$8.50$5.22$50.00$19.00$30.00$50.00
48 (619.111133)EACH2$23,800$45,000$25,000$50,000$30,000$50,000
49Survey Operations (625.01)LS1$50,000$90,000$10,000$125,000$300,000$49,947
50 (625.09010015)LS1$14,600$65,000$2,000.00$30,000$10,000$50,000
51Concrete Cylinder Curing Equipment (637.04)EACH1$3,650.00$1,500.00$2,500.00$9,000.00$5,000.00$2,000.00
52Engineer’s Field Office – Type 3 (637.13)MONTH27$11,000$9,000.00$4,500.00$8,500.00$7,000.00$10,000
53Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
54Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
55Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
56 (643.99660010)2,324$225.00$250.00$275.00$500.00$230.00$240.00
57 (645.03040015)2$9,905.00$7,801.60$6,800.00$4,500.00$6,784.00$10,000
58 (680.83200010)LS1$15,000$1,300.00$9,000.00$30,000$10,000$28,305
59 (691.04000020)122,000$1.00$1.00$1.00$1.00$1.00$1.00
60Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
61Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
62Mobilization (699.040001)LS1$340,000$373,000$410,000$425,000$432,674$441,800
NYSDOT contract D265382: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy