Quintal Contracting Corp: NYSDOT bid record
Quintal Contracting Corp submitted 35 bids on New York State DOT contracts in the data, from 01 SEP 2022 to 01 OCT 2026, and was the low bidder on 4 of them (11%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $18,284,091
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 0 | 0% |
| 2023 | 9 | 0 | 0% |
| 2024 | 8 | 2 | 25% |
| 2025 | 9 | 0 | 0% |
| 2026 | 8 | 2 | 25% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 10 | 29 | 3 | 10% |
| Region 11 | 5 | 1 | 20% |
| Region 08 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 29 | 29 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 29 | 29 (100%) | $1.00 | $1.00 |
| Pavement Patching (Force Acount) | 619.2601 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| 691.04000020 | 15 | 15 (100%) | $1.00 | $1.00 | ||
| Topsoil - Roadside | 610.1402 | CY | 20 | 14 (70%) | $69.00 | $105.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 11 | 11 (100%) | $125.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 10 | 10 (100%) | $125.00 | $85.00 |
| Type III Construction Barricades | 619.04 | EACH | 27 | 9 (33%) | $100.00 | $115.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Constar Inc | 18 | 14 of 18 |
| GGG Construction Corp | 15 | 11 of 15 |
| H & L Contracting LLC | 13 | 10 of 13 |
| Pratt Brothers Inc | 13 | 10 of 13 |
| Oliveira Contracting Inc | 11 | 6 of 11 |
| Posillico Civil Inc | 8 | 7 of 8 |
| Peter Scalamandre & Sons Inc | 8 | 4 of 8 |
| Bove Industries Inc | 8 | 5 of 8 |
| Rosemar Contracting Inc | 8 | 6 of 8 |
| J Anthony Enterprises Inc | 7 | 3 of 7 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265840 | Region 10 | Crack Sealing and Joint Overlay Repairs Various Locations. | 1 of 4 | $1,339,653 | Low, 12% under the second |
| 17 SEP 2026 | D265836 | Region 10 | PM Drainage Clean/ Repair/ Replace Various Locations. | 2 of 6 | $4,219,177 | +21% |
| 27 AUG 2026 | D265803 | Region 10 | PARK/RIDE & BIKEWAY MAINTENANCE, GRAFFITI, TREE TRIMMING. | 5 of 5 | $5,813,431 | +24% |
| 12 MAR 2026 | D265666 | Region 11 | MAINTENANCE CLEANING OF VARIOUS HIGHWAYS IN NYC | 1 of 3 | $3,949,011 | Low, 9.0% under the second |
| 26 FEB 2026 | D265652 | Region 10 | SAFETY ENHACEMENTS ESTIMATE SUMMARY | 2 of 2 | $7,520,114 | +9.0% |
| 05 FEB 2026 | D265684 | Region 10 | ADA COMPLIANCE CONTRACT - Routes NY 25, 25A & 111 | 7 of 7 | $3,992,095 | +91% |
| 05 FEB 2026 | D265685 | Region 10 | Crack Sealing & Joint Overlay Repairs- I-495 Exit 48 to 64 | 3 of 4 | $5,781,018 | +59% |
| 22 JAN 2026 | D265655 | Region 10 | INTERSECTION IMPROVEMENTS - NY Rte 25 at Mt Sinai Coram Rd | 9 of 9 | $6,897,149 | +95% |
| 18 DEC 2025 | D265605 | Region 11 | BRIDGE MAINTENANCE - Expansion Joint Repairs and Replacement | 3 of 6 | $12,887,401 | +39% |
| 20 NOV 2025 | D265585 | Region 10 | Bridge Cleaning and Sealing Contract Various Locations. | 3 of 5 | $5,535,808 | +37% |
| 21 AUG 2025 | D265548 | Region 10 | CRACK SEALING & JOINT OVERLAY REPAIR - VARIOUS LOCATIONS. | 2 of 3 | $2,306,764 | +8.0% |
| 24 JUL 2025 | D265502 | Region 10 | TREE TRIMMING / TREE REMOVAL | 3 of 5 | $8,573,289 | +20% |
| 10 JUL 2025 | D265522 | Region 08 | HIGHWAY CRACK SEALING - Various Locations | 3 of 3 | $2,162,596 | +22% |
| 10 APR 2025 | D265460 | Region 10 | WANTAGH STATE PARKWAY SB RAMPS IMPROVEMENT AT OLD COUNTRY RD | 9 of 11 | $10,706,833 | +58% |
| 27 MAR 2025 | D265362 | Region 10 | DRAINAGE - Clean/Repair/Replace, Various Locations. | 4 of 4 | $5,045,644 | +79% |
| 20 FEB 2025 | D265382 | Region 10 | I-495 Sound Barrier Requirements, Exits 49-57, | 11 of 11 | $19,785,060 | +123% |
| 23 JAN 2025 | D265388 | Region 11 | MOBILITY IMPROVEMENTS - CLEARVIEW EXPRESSWAY - Route I-295 | 7 of 7 | $6,323,599 | +115% |
| 19 DEC 2024 | D265350 | Region 10 | PM Bridge Repairs Town of Southampton, Suffolk County | 4 of 5 | $16,918,596 | +10% |
| 19 DEC 2024 | D265431 | Region 10 | PARK & RIDE, BIKEWAYS, REST AREAS, GRAFFITI MAINTENANCE | 1 of 1 | $6,343,745 | Low |
| 26 SEP 2024 | D265214 | Region 10 | Drainage Enhancement Various Locations Nassau County | 2 of 7 | $10,552,639 | +11% |
| 26 SEP 2024 | D265311 | Region 10 | Safety Enhancements Various Locations | 4 of 4 | $11,164,223 | +59% |
| 12 SEP 2024 | D265270 | Region 10 | GUIDE RAIL - RUSTIC RAIL REPLACEMENT - Various Locations | 3 of 3 | $15,145,829 | +20% |
| 11 JUL 2024 | D265275 | Region 11 | LANDSCAPE REQUIREMENTS CONTRACT AT VARIOUS LOCATIONS | 3 of 3 | $5,593,202 | +26% |
| 28 MAR 2024 | D265215 | Region 10 | Crack Sealing & Joint Overlay Repair Contract Various Towns | 1 of 4 | $6,651,682 | Low, 3.0% under the second |
| 08 FEB 2024 | D265150 | Region 11 | Crack and Joint Sealing at Bronx, Kings, New York & Queens | 3 of 4 | $1,562,755 | +7.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.