NYSDOT contract D265362 bid tabulation

DRAINAGE - Clean/Repair/Replace, Various Locations. Let by New York State DOT on March 27, 2025, Nassau, Suffolk, Region 10. 4 bids received; low bid $2,822,967 by GGG Construction Corp.

Owner
New York State DOT
Letting
27 MAR 2025
Pay items
121
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1GGG Construction Corp$2,822,967Low
2Pratt Brothers Inc$3,861,658+37%
3Roadwork Ahead Inc$4,693,307+66%
4Quintal Contracting Corp$5,045,644+79%
NYSDOT contract D265362: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. GGG Construction Corp2. Pratt Brothers Inc3. Roadwork Ahead Inc4. Quintal Contracting Corp
1Clearing and Grubbing (201.06)LS1$7,500.00$15,000$50,000$25,000
2Unclassified Excavation and Disposal (203.02)CY172$75.00$295.00$150.00$110.00
3Embankment In Place (203.03)CY244$35.00$5.00$100.00$65.00
4Select Granular Fill (203.07)CY427$20.00$30.00$100.00$68.00
5Trench and Culvert Excavation (206.0201)CY1,037$15.00$10.00$72.00$105.00
6 (206.03100010)23$15.00$100.00$100.00$150.00
7Test Pit Excavation (206.05)EACH3$750.00$1,500.00$2,000.00$2,800.00
8 (209.11010024)14$150.00$175.00$700.00$300.00
9Silt Fence - Temporary (209.13)LF228$10.00$25.00$10.00$16.00
10Stabilized Construction Access (209.22)SY167$25.00$20.00$60.00$65.00
11 (304.10119917)185$105.00$125.00$150.00$89.00
12 (402.90710118)7$1,000.00$1,000.00$1,000.00$3,700.00
13 (404.0001)TON37$125.00$125.00$125.00$125.00
14 (404.0189)TON44$225.00$454.00$350.00$350.00
15 (404.0981)TON412$225.00$225.00$368.00$325.00
16 (404.1989)TON183$190.00$375.00$350.00$350.00
17 (404.2589)TON93$190.00$475.00$350.00$345.00
18Diluted Tack Coat (407.0102)GAL579$10.00$3.00$10.00$15.00
19Asphalt Pavement Joint Adhesive (418.7603)LF4,119$3.00$9.00$7.00$2.50
20Production Cold Milling of Bituminous Concrete (490.10)SY3,367$20.00$20.00$20.00$49.50
21 (490.17011018)120$100.00$20.00$20.00$295.00
22Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY169$100.00$20.00$20.00$225.00
23 (502.31010018)741$140.00$100.00$320.00$110.00
24 (502.32010010)742$50.00$115.00$100.00$95.00
25 (502.36130018)72$1,000.00$1,300.00$1,500.00$2,500.00
26 (502.36230018)130$1,000.00$2,300.00$1,700.00$2,500.00
27 (502.37010018)134$12.00$20.00$45.00$150.00
28 (520.05000010)150$6.00$5.50$15.00$20.00
29 (520.09000010)1,272$5.00$3.00$8.00$13.00
30 (552.18000017)7,891$0.50$10.00$12.00$25.00
31 (603.6002)LF416$65.00$360.00$265.00$178.00
32 (604.01404810)1$5,000.00$12,500$25,000$7,500.00
33 (604.01407210)7$6,500.00$13,000$15,000$9,500.00
34 (604.07200110)11$2,000.00$1,000.00$3,000.00$2,500.00
35 (604.07210110)13$2,000.00$1,000.00$3,000.00$1,800.00
36 (604.07240110)2$3,000.00$6,000.00$6,000.00$3,500.00
37 (604.07260011)13$500.00$3,000.00$1,500.00$1,800.00
38 (604.07290010)10$120.00$100.00$300.00$198.00
39 (604.07800010)7$500.00$1,600.00$1,700.00$475.00
40Prefabricated Adjustment Rings for Manholes (604.10)EACH1$2,000.00$425.00$500.00$3,500.00
41 (604.501011)LF70$1,850.00$1,673.94$1,600.00$1,700.00
42 (604.501012)LF10$2,000.00$1,800.00$2,000.00$1,600.00
43 (604.501013)LF12$2,000.00$3,100.00$1,700.00$1,900.00
44 (604.501014)LF5$2,100.00$3,700.00$2,000.00$2,000.00
45 (604.501016)LF15$2,250.00$3,800.00$2,000.00$2,100.00
46Resetting Box Beam Guide Railing (New Posts) (606.5348)LF86$290.00$175.00$80.00$295.00
47Resetting HPBO (Mod.) Corrugated Beam Guide Railing (New Posts) (606.5801)LF113$290.00$130.00$125.00$295.00
48 (607.41010010)200$10.00$20.00$10.00$12.00
49 (607.97000008)175$100.00$160.00$115.00$200.00
50Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT2$125.00$125.00$125.00$125.00
51 (608.01020005)8$2,500.00$2,500.00$2,400.00$3,800.00
52 (608.01050010)34$1,765.00$2,100.00$1,600.00$1,800.00
53 (608.01050109)1$7,965.00$9,500.00$9,000.00$10,000
54 (608.01050409)1$15,440$11,000$1,600.00$18,500
55 (608.01050709)1$21,065$12,000$12,000$23,750
56 (608.01050809)2$14,980$11,000$12,000$16,250
57 (608.02010015)7$150.00$345.00$200.00$125.00
58Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON35$400.00$1,000.00$375.00$450.00
59 (608.02020015)7$95.00$75.00$150.00$125.00
60 (609.04010510)372$75.00$105.00$75.00$155.00
61 (609.04070510)347$90.00$105.00$75.00$235.00
62Mycorrhizal Fungi (610.0701)LB2$25.00$25.00$100.00$120.00
63Moisture Retention Additive (610.08)LB1$14.00$15.00$200.00$120.00
64 (610.14000011)17$300.00$285.00$200.00$80.00
65Topsoil - Roadside (610.1402)CY15$125.00$135.00$200.00$80.00
66Turf Establishment - Roadside (610.1601)SY130$7.95$8.00$60.00$4.95
67Watering Vegetation (610.19)1,000 GALLONS1$150.00$125.00$500.00$695.00
68 (611.0201)EACH3$975.00$850.00$3,000.00$900.00
69Post-Planting Care (611.19)EACH3$105.00$90.00$1,000.00$800.00
70 (614.060203)EACH2$920.00$1,000.00$3,000.00$350.00
71 (614.060303)EACH2$1,375.00$1,500.00$3,000.00$950.00
72Basic Work Zone Traffic Control (619.01)LS1$240,000$435,000$500,000$425,000
73Type III Construction Barricades (619.04)EACH6$100.00$200.00$300.00$85.00
74 (619.0901)LF10,986$3.00$1.00$3.00$1.00
75 (619.10050020)690$5.00$75.00$100.00$15.00
76 (619.110943)EACH2$20,000$10,000$13,000$9,000.00
77 (619.111133)EACH5$15,000$10,000$7,000.00$9,000.00
78Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,620$10.00$40.00$80.00$158.00
79Warning Lights on Temporary Positive Barriers (619.1719)EACH45$10.00$100.00$100.00$100.00
80Vehicle Arresting Barrier (619.23)EACH1$9,000.00$9,500.00$10,000$8,000.00
81Nighttime Operations (Entire Project) (619.24)LS1$180,000$95,000$275,000$375,000
82Traffic Control Supervisor (619.25)MONTH12$200.00$1,000.00$7,000.00$2,000.00
83Pavement Patching (Force Acount) (619.2601)DOL10,000$1.00$1.00$1.00$1.00
84Cleaning Culverts with Span of More Than 50 in. (621.02)LF50$200.00$169.00$150.00$175.00
85Cleaning Closed Drainage Systems (621.03)LF12,787$1.00$4.00$6.92$13.00
86Cleaning Drainage Structures (621.04)EACH238$575.00$700.00$751.00$950.00
87 (621.51970008)50$200.00$175.00$100.00$120.00
88Survey Operations (625.01)LS1$10,000$35,000$50,000$18,000
89 (625.09010015)LS1$1,000.00$25,000$50,000$10,000
90Cleaning Existing Pavement and/or Shoulder (633.11)SY3,487$2.00$0.60$5.00$5.00
91 (634.10010015)LS1$3,500.00$20,000$27,000$5,000.00
92Concrete Cylinder Curing Equipment (637.04)EACH1$1,500.00$1,000.00$1,000.00$4,000.00
93Engineer’s Field Office – Type 2 (637.12)MONTH15$3,500.00$6,500.00$9,000.00$8,000.00
94Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00
95Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00
96Type A Sign Posts (645.81)EACH6$315.00$305.00$1,000.00$375.00
97Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH7$600.00$350.00$500.00$650.00
98Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH7$500.00$350.00$500.00$550.00
99 (655.05010010)1$2,500.00$2,400.00$3,000.00$2,500.00
100Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703)EACH21$1,975.00$2,600.00$2,400.00$2,500.00
101 (655.07030010)8$1,600.00$2,400.00$2,300.00$2,400.00
102Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH14$2,035.00$2,300.00$2,000.00$2,200.00
103Miscellaneous Metals (656.01)LB962$3.00$3.00$6.00$20.00
104 (660.75000010)1$1,500.00$600.00$2,500.00$2,000.00
105 (660.81000007)4$1,500.00$1,500.00$13,000$8,000.00
106 (662.62000010)2$1,500.00$2,700.00$2,000.00$2,000.00
107Adjust Existing Valve Box Elevation (663.33)EACH3$550.00$100.00$500.00$850.00
108 (680.51020009)1$550.00$1,000.00$1,000.00$600.00
109 (680.520203)LF23$40.00$15.00$100.00$80.00
110Inductance Loop Installation (680.54)LF372$37.00$34.00$45.00$50.00
111Inductance Loop Wire (680.72)LF767$2.65$1.60$8.00$4.00
112 (680.83200010)LS1$1,500.00$25,000$20,000$8,000.00
113 (685.07200110)2,948$2.60$2.75$8.00$3.00
114 (685.07200210)2$260.00$275.00$1,000.00$450.00
115 (685.07200510)960$3.80$4.00$8.00$6.00
116 (685.07200610)2,457$2.60$2.75$8.00$4.00
117Field Change Payment (FCP) (697.03)DOL300,000$1.00$1.00$1.00$1.00
118Asphalt Price Adjustment (698.04)DOL894$1.00$1.00$1.00$1.00
119Fuel Price Adjustment (698.05)DOL647$1.00$1.00$1.00$1.00
120Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
121Mobilization (699.040001)LS1$108,575$140,000$134,995$184,715
NYSDOT contract D265362: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way