NYSDOT contract D265840 bid tabulation
Crack Sealing and Joint Overlay Repairs Various Locations. Let by New York State DOT on October 1, 2026, Nassau, Suffolk, Region 10. 4 bids received; low bid $1,339,653 by Quintal Contracting Corp.
- Owner
- New York State DOT
- Letting
- 01 OCT 2026
- Pay items
- 37
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Quintal Contracting Corp | $1,339,653 | Low |
| 2 | Constar Inc | $1,499,725 | +12% |
| 3 | GGG Construction Corp | $1,564,049 | +17% |
| 4 | Rosemar Contracting Inc | $2,586,000 | +93% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Quintal Contracting Corp | 2. Constar Inc | 3. GGG Construction Corp | 4. Rosemar Contracting Inc |
|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 48 | $195.00 | $50.00 | $100.00 | $200.00 |
| 2 | (404.0981) | TON | 41 | $650.00 | $600.00 | $350.00 | $1,200.00 |
| 3 | (404.1989) | TON | 41 | $650.00 | $600.00 | $350.00 | $1,200.00 |
| 4 | Diluted Tack Coat (407.0102) | GAL | 63 | $50.00 | $12.00 | $5.00 | $30.00 |
| 5 | (412.76020010) | 1,100 | $16.00 | $10.00 | $15.00 | $7.00 | |
| 6 | (412.76030008) | 165 | $3,875.00 | $4,400.00 | $5,000.00 | $5,000.00 | |
| 7 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,858 | $1.00 | $5.00 | $2.00 | $8.50 |
| 8 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 283 | $45.00 | $50.00 | $30.00 | $75.00 |
| 9 | (520.09000010) | 1,858 | $4.50 | $5.00 | $5.00 | $6.50 | |
| 10 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $125,000 | $250,000 | $150,000 | $595,000 |
| 11 | Type III Construction Barricades (619.04) | EACH | 202 | $10.00 | $20.00 | $50.00 | $100.00 |
| 12 | (619.10050020) | 1,000 | $10.00 | $5.00 | $10.00 | $50.00 | |
| 13 | (619.110543) | EACH | 5 | $5,000.00 | $5,000.00 | $10,000 | $20,000 |
| 14 | (619.110943) | EACH | 2 | $5,000.00 | $5,000.00 | $10,000 | $16,000 |
| 15 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $75,000 | $100,000 | $150,000 | $350,000 |
| 16 | Traffic Control Supervisor (619.25) | MONTH | 24 | $500.00 | $100.00 | $500.00 | $1,200.00 |
| 17 | Pavement Patching (Force Acount) (619.2601) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Survey Operations (625.01) | LS | 1 | $3,000.00 | $100.00 | $100.00 | $20,000 |
| 19 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 889 | $4.00 | $5.00 | $5.00 | $18.50 |
| 20 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 57 | $68.00 | $100.00 | $25.00 | $50.00 |
| 21 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 24 | $5,000.00 | $4,000.00 | $2,500.00 | $6,000.00 |
| 22 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | (680.83200010) | LS | 1 | $5,000.00 | $100.00 | $100.00 | $10,000 |
| 25 | (685.07200110) | 612 | $10.70 | $2.50 | $5.00 | $3.00 | |
| 26 | (685.07200210) | 5 | $254.00 | $200.00 | $500.00 | $225.00 | |
| 27 | (685.07200310) | 5 | $283.00 | $200.00 | $500.00 | $225.00 | |
| 28 | (685.07200410) | 50 | $4.15 | $3.00 | $5.00 | $3.50 | |
| 29 | (685.07200510) | 594 | $20.20 | $4.50 | $5.00 | $5.00 | |
| 30 | (685.07200610) | 75 | $10.70 | $2.50 | $10.00 | $3.00 | |
| 31 | (685.07200710) | 50 | $4.15 | $3.00 | $10.00 | $3.50 | |
| 32 | (685.07200910) | 5 | $290.00 | $225.00 | $500.00 | $250.00 | |
| 33 | Field Change Payment (FCP) (697.03) | DOL | 113,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 34 | Asphalt Price Adjustment (698.04) | DOL | 638.13 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 37 | Mobilization (699.040001) | LS | 1 | $51,524 | $43,000 | $60,000 | $92,099 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 1, 2026. Compiled by Mirage Metrics.