NYSDOT contract D265655 bid tabulation
INTERSECTION IMPROVEMENTS - NY Rte 25 at Mt Sinai Coram Rd. Let by New York State DOT on January 22, 2026, Suffolk, Region 10. 9 bids received; low bid $3,529,256 by Rosemar Contracting Inc.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 152
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rosemar Contracting Inc | $3,529,256 | Low |
| 2 | Pratt Brothers Inc | $4,056,789 | +15% |
| 3 | H & L Contracting LLC | $4,460,223 | +26% |
| 4 | Suffolk Paving Corp | $4,470,270 | +27% |
| 5 | G & M Earth Moving Inc | $4,972,000 | +41% |
| 6 | Oliveira Contracting Inc | $5,035,569 | +43% |
| 7 | Peter Scalamandre & Sons Inc | $5,468,713 | +55% |
| 8 | United Paving Corp | $5,942,444 | +68% |
| 9 | Quintal Contracting Corp | $6,897,149 | +95% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rosemar Contracting Inc | 2. Pratt Brothers Inc | 3. H & L Contracting LLC | 4. Suffolk Paving Corp | 5. G & M Earth Moving Inc | 6. Oliveira Contracting Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $10,000 | $50,000 | $35,790 | $10.00 | $35,323 | $30,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,157.84 | $65.00 | $88.00 | $134.27 | $75.00 | $135.00 | $75.00 |
| 3 | Embankment In Place (203.03) | CY | 1,028 | $10.00 | $5.00 | $1.00 | $25.00 | $5.00 | $60.00 |
| 4 | Select Granular Fill (203.07) | CY | 1,710 | $10.00 | $20.00 | $70.00 | $40.00 | $60.00 | $80.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 3,063 | $25.00 | $5.00 | $45.00 | $25.00 | $1.00 | $10.00 |
| 6 | (206.03100010) | 438 | $145.00 | $151.00 | $40.00 | $15.00 | $215.00 | $160.00 | |
| 7 | Test Pit Excavation (206.05) | EACH | 7 | $500.00 | $1,200.00 | $3,000.00 | $500.00 | $6,000.00 | $3,600.00 |
| 8 | Geotextile Separation (207.21) | SY | 3,000 | $2.50 | $2.25 | $6.10 | $4.00 | $2.00 | $4.00 |
| 9 | Mulch – Temporary (209.100101) | SY | 152 | $10.00 | $12.00 | $4.00 | $10.00 | $10.00 | $10.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 152 | $10.00 | $12.00 | $4.00 | $10.00 | $10.00 | $10.00 |
| 11 | (209.11010024) | 12 | $350.00 | $275.00 | $590.81 | $38.00 | $250.00 | $600.00 | |
| 12 | Sediment Filter Log, 12″ (209.2301) | LF | 220 | $20.00 | $16.00 | $20.00 | $20.00 | $15.00 | $27.00 |
| 13 | (304.10119917) | 702 | $110.00 | $125.00 | $115.00 | $150.00 | $115.00 | $120.00 | |
| 14 | (404.0189) | TON | 84 | $105.00 | $130.00 | $170.00 | $500.00 | $187.00 | $140.00 |
| 15 | (404.0971) | TON | 1,767 | $105.00 | $156.00 | $165.00 | $185.00 | $187.00 | $140.00 |
| 16 | (404.1989) | TON | 595 | $165.00 | $295.00 | $225.00 | $350.00 | $176.00 | $250.00 |
| 17 | (404.2589) | TON | 1,168 | $165.00 | $295.00 | $250.00 | $300.00 | $193.00 | $250.00 |
| 18 | Diluted Tack Coat (407.0102) | GAL | 1,628 | $1.00 | $3.00 | $5.00 | $8.00 | $15.00 | $7.00 |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 10,941 | $0.75 | $1.50 | $0.70 | $1.10 | $1.00 | $3.00 |
| 20 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 11,968 | $3.50 | $5.00 | $9.00 | $10.00 | $10.00 | $5.00 |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,217 | $3.50 | $5.00 | $15.00 | $10.00 | $10.00 | $5.00 |
| 22 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 4 | $1,500.00 | $5,000.00 | $1,170.00 | $600.00 | $3,000.00 | $4,000.00 |
| 23 | (520.09000010) | 4,851 | $4.50 | $3.00 | $1.00 | $3.00 | $8.00 | $10.00 | |
| 24 | Shields and Shoring (552.17) | SF | 17,558.46 | $0.10 | $1.00 | $1.00 | $2.00 | $2.00 | $1.00 |
| 25 | (603.6002) | LF | 83 | $170.00 | $156.00 | $325.00 | $70.00 | $510.00 | $275.00 |
| 26 | (603.6003) | LF | 1,705 | $145.00 | $103.00 | $230.00 | $80.00 | $220.00 | $175.00 |
| 27 | (603.6005) | LF | 212 | $150.00 | $145.00 | $275.00 | $105.00 | $205.00 | $400.00 |
| 28 | (604.501002) | LF | 57 | $1,450.00 | $1,600.00 | $1,500.00 | $1,200.00 | $2,800.00 | $1,250.00 |
| 29 | (604.501005) | LF | 69 | $1,300.00 | $1,600.00 | $1,300.00 | $1,200.00 | $2,400.00 | $1,500.00 |
| 30 | (604.501011) | LF | 21 | $1,450.00 | $1,300.00 | $1,300.00 | $1,200.00 | $1,900.00 | $2,400.00 |
| 31 | (604.501012) | LF | 30 | $1,500.00 | $1,200.00 | $1,350.00 | $1,200.00 | $2,400.00 | $1,500.00 |
| 32 | (604.501022) | LF | 10 | $1,500.00 | $1,600.00 | $1,400.00 | $1,200.00 | $1,900.00 | $1,500.00 |
| 33 | Concrete Sidewalks and Driveways (608.0101) | CY | 67 | $900.00 | $950.00 | $1,400.00 | $850.00 | $890.00 | $1,450.00 |
| 34 | (608.01050209) | 3 | $6,100.00 | $7,200.00 | $6,100.00 | $10,000 | $12,000 | $15,000 | |
| 35 | (608.01050409) | 2 | $6,700.00 | $7,900.00 | $6,700.00 | $10,000 | $12,000 | $22,000 | |
| 36 | (608.01050909) | 1 | $5,700.00 | $6,700.00 | $5,700.00 | $10,000 | $12,000 | $22,000 | |
| 37 | (608.02010015) | 196 | $120.00 | $181.00 | $5.00 | $50.00 | $145.00 | $180.50 | |
| 38 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 12 | $550.00 | $450.00 | $1,000.00 | $500.00 | $150.00 | $300.00 |
| 39 | (608.02020015) | 131 | $110.00 | $121.00 | $10.00 | $65.00 | $118.00 | $250.00 | |
| 40 | (608.21000003) | 17 | $675.00 | $675.00 | $675.00 | $65.00 | $215.00 | $371.00 | |
| 41 | (609.0401) | LF | 3,045 | $36.00 | $36.00 | $35.50 | $65.00 | $45.00 | $70.00 |
| 42 | Mycorrhizal Fungi (610.0701) | LB | 3 | $36.00 | $36.00 | $100.00 | $40.00 | $40.00 | $36.00 |
| 43 | Moisture Retention Additive (610.08) | LB | 1 | $50.00 | $50.00 | $100.00 | $55.00 | $50.00 | $50.00 |
| 44 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 1 | $100.00 | $100.00 | $50.00 | $115.00 | $110.00 | $100.00 |
| 45 | Topsoil - Roadside (610.1402) | CY | 18 | $170.00 | $170.00 | $90.00 | $1.00 | $185.00 | $170.00 |
| 46 | Turf Establishment - Roadside (610.1601) | SY | 164 | $15.00 | $15.00 | $20.00 | $195.00 | $15.00 | $15.00 |
| 47 | Watering Vegetation (610.19) | 1,000 GALLONS | 2 | $200.00 | $200.00 | $300.00 | $220.00 | $200.00 | $200.00 |
| 48 | (611.0171) | EACH | 4 | $2,500.00 | $2,500.00 | $1,100.00 | $3,000.00 | $2,750.00 | $2,500.00 |
| 49 | Post-Planting Care (611.19) | EACH | 4 | $250.00 | $250.00 | $300.00 | $300.00 | $275.00 | $250.00 |
| 50 | (611.19010024) | 4 | $500.00 | $500.00 | $400.00 | $600.00 | $550.00 | $500.00 | |
| 51 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $275,000 | $169,957 | $250,000 | $425,000 | $180,000 | $471,328 |
| 52 | Type III Construction Barricades (619.04) | EACH | 8 | $130.00 | $150.00 | $185.00 | $100.00 | $350.00 | $430.00 |
| 53 | (619.080102) | LF | 4,940 | $1.75 | $1.75 | $3.00 | $1.85 | $2.00 | $2.00 |
| 54 | (619.080202) | EACH | 27 | $50.00 | $50.00 | $50.00 | $60.00 | $55.00 | $52.00 |
| 55 | (619.100101) | LF | 8,120 | $0.50 | $0.50 | $1.00 | $0.65 | $0.50 | $1.00 |
| 56 | (619.10050020) | 720 | $35.00 | $125.00 | $4.30 | $50.00 | $40.00 | $12.00 | |
| 57 | (619.110511) | EACH | 2 | $10,000 | $10,000 | $25,000 | $10,000 | $15,000 | $35,000 |
| 58 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 4 | $500.00 | $1,200.00 | $500.00 | $550.00 | $500.00 | $206.00 |
| 59 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $50,000 | $65,000 | $25,000 | $145,000 | $65,000 | $80,000 |
| 60 | Pavement Patching (Force Acount) (619.2601) | DOL | 17,550 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 61 | Cleaning Drainage Structures (621.04) | EACH | 2 | $2,500.00 | $2,500.00 | $4,500.00 | $1,500.00 | $3,500.00 | $4,440.00 |
| 62 | Screened Gravel (In-Place Measure) (623.10) | CY | 150 | $50.00 | $73.00 | $85.00 | $100.00 | $55.00 | $128.00 |
| 63 | Survey Operations (625.01) | LS | 1 | $55,600 | $75,000 | $90,000 | $65,000 | $45,000 | $140,000 |
| 64 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 12 | $100.00 | $300.00 | $800.00 | $10.00 | $150.00 | $250.00 |
| 65 | (634.10010015) | LS | 1 | $10,000 | $12,500 | $10,000 | $10,000 | $10,000 | $15,000 |
| 66 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 8,120 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.00 |
| 67 | Field Laboratory (637.01) | EACH | 1 | $5,000.00 | $25,000 | $8,500.00 | $1,500.00 | $3,500.00 | $7,890.00 |
| 68 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,400.00 | $1,500.00 | $4,350.00 | $500.00 | $500.00 | $7,890.00 |
| 69 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $4,500.00 | $5,000.00 | $6,500.00 | $5,000.00 | $6,500.00 | $8,300.00 |
| 70 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | (637.41000115) | 12 | $150.00 | $300.00 | $245.51 | $100.00 | $250.00 | $197.00 | |
| 73 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 10 | $75.00 | $75.00 | $75.00 | $100.00 | $80.00 | $125.00 |
| 74 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 23 | $95.00 | $95.00 | $95.00 | $100.00 | $100.00 | $120.00 |
| 75 | Type A Sign Posts (645.81) | EACH | 13 | $425.00 | $425.00 | $425.00 | $360.00 | $460.00 | $350.00 |
| 76 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $350.00 | $350.00 | $350.00 | $525.00 | $385.00 | $200.00 |
| 77 | Reference Marker Panel (646.21) | EACH | 1 | $125.00 | $125.00 | $125.00 | $265.00 | $135.00 | $200.00 |
| 78 | Steel Post, 2.0 lb/ft (646.32) | EACH | 1 | $300.00 | $300.00 | $300.00 | $315.00 | $300.00 | $250.00 |
| 79 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 5 | $425.00 | $425.00 | $425.00 | $615.00 | $450.00 | $1,000.00 |
| 80 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 4 | $50.00 | $50.00 | $50.00 | $360.00 | $50.00 | $125.00 |
| 81 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 11 | $60.00 | $60.00 | $60.00 | $460.00 | $60.00 | $350.00 |
| 82 | (655.07030010) | 3 | $1,225.00 | $1,995.00 | $2,500.00 | $2,500.00 | $2,800.00 | $4,000.00 | |
| 83 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 12 | $1,550.00 | $2,375.00 | $2,750.00 | $3,000.00 | $2,500.00 | $4,500.00 |
| 84 | Manhole Frame & Cover (655.1202) | EACH | 8 | $500.00 | $1,025.00 | $1,000.00 | $1,200.00 | $1,700.00 | $2,100.00 |
| 85 | (662.60000108) | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 86 | (663.0112) | LF | 538 | $220.00 | $212.00 | $211.00 | $310.00 | $450.00 | $211.00 |
| 87 | (663.1006) | EACH | 2 | $2,700.00 | $2,600.00 | $2,600.00 | $4,800.00 | $1,990.00 | $2,600.00 |
| 88 | (663.1012) | EACH | 4 | $3,200.00 | $3,000.00 | $3,000.00 | $7,000.00 | $5,200.00 | $3,000.00 |
| 89 | (663.1301) | EACH | 1 | $10,500 | $10,000 | $10,000 | $32,000 | $19,000 | $10,000 |
| 90 | (663.1302) | EACH | 1 | $10,500 | $10,000 | $10,000 | $32,000 | $19,000 | $10,000 |
| 91 | (663.161212) | EACH | 4 | $20,500 | $20,000 | $20,000 | $6,500.00 | $55,000 | $20,000 |
| 92 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 1,190 | $38.00 | $36.00 | $36.00 | $15.00 | $2.00 | $36.00 |
| 93 | (663.2504) | EACH | 2 | $3,750.00 | $3,700.00 | $3,700.00 | $7,000.00 | $16,000 | $3,700.00 |
| 94 | Relocate Existing Hydrant (663.31) | EACH | 1 | $8,750.00 | $8,500.00 | $8,500.00 | $20,000 | $15,000 | $8,500.00 |
| 95 | Adjust Existing Valve Box Elevation (663.33) | EACH | 5 | $150.00 | $75.00 | $78.28 | $250.00 | $250.00 | $3,180.00 |
| 96 | Disconnect and Cap Existing Water Main (663.40) | EACH | 4 | $3,500.00 | $3,400.00 | $3,400.00 | $2,800.00 | $250.00 | $3,400.00 |
| 97 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 1 | $1,000.00 | $900.00 | $900.00 | $1,200.00 | $250.00 | $900.00 |
| 98 | Remove and Dispose of Existing Hydrant (663.43) | EACH | 1 | $1,550.00 | $1,500.00 | $1,500.00 | $1,800.00 | $250.00 | $1,500.00 |
| 99 | (680.05010007) | 1 | $28,600 | $30,000 | $28,600 | $31,000 | $31,000 | $35,000 | |
| 100 | Pole Excavation and Concrete Foundation (680.5001) | CY | 10 | $3,200.00 | $2,350.00 | $3,900.00 | $450.00 | $13,000 | $516.00 |
| 101 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $1,500.00 | $950.00 | $3,800.00 | $2,000.00 | $115.00 | $292.00 |
| 102 | (680.51050010) | 5 | $1,900.00 | $3,900.00 | $1,900.00 | $800.00 | $2,000.00 | $2,060.00 | |
| 103 | (680.520103) | LF | 12 | $16.00 | $53.00 | $16.00 | $20.00 | $17.00 | $26.00 |
| 104 | (680.520106) | LF | 158 | $29.00 | $41.00 | $29.00 | $35.00 | $32.00 | $36.00 |
| 105 | (680.520108) | LF | 270 | $67.00 | $52.00 | $67.00 | $76.00 | $74.00 | $61.00 |
| 106 | (680.520110) | LF | 100 | $92.00 | $76.00 | $92.00 | $110.00 | $100.00 | $77.00 |
| 107 | (680.6708) | EACH | 5 | $1,600.00 | $2,200.00 | $1,600.00 | $1,800.00 | $1,760.00 | $2,170.00 |
| 108 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $1,900.00 | $1,485.00 | $1,900.00 | $2,100.00 | $2,000.00 | $1,550.00 |
| 109 | (680.730214) | LF | 50 | $3.00 | $15.00 | $3.00 | $3.50 | $3.00 | $5.00 |
| 110 | (680.730514) | LF | 3,000 | $4.50 | $4.00 | $4.50 | $5.10 | $5.00 | $6.00 |
| 111 | (680.731014) | LF | 382 | $12.00 | $5.25 | $12.00 | $14.00 | $13.00 | $7.00 |
| 112 | (680.79400010) | 6 | $800.00 | $356.00 | $800.00 | $900.00 | $850.00 | $877.00 | |
| 113 | (680.79490010) | 4 | $250.00 | $1,000.00 | $250.00 | $300.00 | $250.00 | $361.00 | |
| 114 | (680.80324515) | 1 | $2,500.00 | $3,800.00 | $2,500.00 | $3,000.00 | $2,500.00 | $2,890.00 | |
| 115 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 8 | $180.00 | $112.00 | $180.00 | $200.00 | $200.00 | $124.00 |
| 116 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 4 | $180.00 | $120.00 | $180.00 | $200.00 | $200.00 | $129.00 |
| 117 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 8 | $180.00 | $112.00 | $180.00 | $200.00 | $200.00 | $129.00 |
| 118 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 10 | $180.00 | $130.00 | $180.00 | $200.00 | $200.00 | $129.00 |
| 119 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 8 | $180.00 | $112.00 | $180.00 | $200.00 | $200.00 | $129.00 |
| 120 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 6 | $180.00 | $135.00 | $180.00 | $200.00 | $200.00 | $134.00 |
| 121 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 44 | $160.00 | $452.00 | $160.00 | $190.00 | $200.00 | $567.00 |
| 122 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 12 | $315.00 | $532.00 | $315.00 | $365.00 | $350.00 | $774.00 |
| 123 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $515.00 | $880.00 | $515.00 | $565.00 | $560.00 | $1,130.00 |
| 124 | Pedestrian Signal Section, Aluminum, Type I, for 16 inches by 18 inches LED module (680.813108) | EACH | 8 | $275.00 | $500.00 | $275.00 | $315.00 | $300.00 | $1,030.00 |
| 125 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $400.00 | $444.00 | $400.00 | $450.00 | $440.00 | $619.00 |
| 126 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 6 | $400.00 | $541.00 | $400.00 | $440.00 | $440.00 | $671.00 |
| 127 | Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002) | EACH | 8 | $535.00 | $388.00 | $535.00 | $600.00 | $590.00 | $877.00 |
| 128 | (680.8151) | EACH | 7 | $1,200.00 | $1,425.00 | $1,200.00 | $1,300.00 | $1,300.00 | $1,600.00 |
| 129 | (680.8152) | EACH | 1 | $1,400.00 | $3,000.00 | $1,400.00 | $1,500.00 | $1,500.00 | $2,890.00 |
| 130 | Backplates for Traffic Signal Heads (680.8199) | EACH | 12 | $220.00 | $545.00 | $220.00 | $265.00 | $240.00 | $361.00 |
| 131 | (680.8207) | EACH | 1 | $900.00 | $1,240.00 | $900.00 | $1,000.00 | $1,000.00 | $1,340.00 |
| 132 | (680.82250108) | 1 | $800.00 | $178.00 | $800.00 | $900.00 | $900.00 | $619.00 | |
| 133 | (680.83200010) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $5,500.00 | $5,500.00 | $5,670.00 |
| 134 | (680.85166010) | 1 | $40,750 | $66,000 | $40,750 | $42,500 | $45,000 | $48,000 | |
| 135 | (680.85166510) | 1 | $41,400 | $65,000 | $41,400 | $44,000 | $45,000 | $55,000 | |
| 136 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $2,200.00 | $1,775.00 | $2,200.00 | $2,500.00 | $2,400.00 | $2,060.00 |
| 137 | (680.950206) | LF | 120 | $16.00 | $6.30 | $16.00 | $18.00 | $18.00 | $17.00 |
| 138 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 139 | (680.99020010) | 2 | $2,500.00 | $1,900.00 | $2,500.00 | $2,800.00 | $2,750.00 | $1,750.00 | |
| 140 | (680.99050010) | 1 | $1,400.00 | $900.00 | $1,400.00 | $1,500.00 | $1,500.00 | $877.00 | |
| 141 | (680.99100010) | 1 | $1,200.00 | $1,425.00 | $1,200.00 | $1,300.00 | $1,300.00 | $1,500.00 | |
| 142 | (685.07200110) | 5,133 | $0.74 | $0.75 | $0.74 | $1.00 | $0.80 | $1.00 | |
| 143 | (685.07200210) | 12 | $150.00 | $150.00 | $150.00 | $175.00 | $160.00 | $155.00 | |
| 144 | (685.07200310) | 29 | $175.00 | $175.00 | $175.00 | $200.00 | $190.00 | $181.00 | |
| 145 | (685.07200510) | 2,162 | $2.65 | $2.65 | $2.65 | $3.00 | $3.00 | $3.00 | |
| 146 | (685.07200610) | 5,054 | $0.74 | $0.75 | $0.74 | $1.00 | $0.80 | $1.00 | |
| 147 | (685.07200710) | 1,994 | $2.65 | $2.65 | $2.65 | $3.00 | $3.00 | $3.00 | |
| 148 | Field Change Payment (FCP) (697.03) | DOL | 332,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 149 | Asphalt Price Adjustment (698.04) | DOL | 7,943 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 150 | Fuel Price Adjustment (698.05) | DOL | 5,624 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 151 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 152 | Mobilization (699.040001) | LS | 1 | $130,000 | $150,000 | $170,000 | $169,730 | $185,000 | $192,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.