NYSDOT contract D265655 bid tabulation

INTERSECTION IMPROVEMENTS - NY Rte 25 at Mt Sinai Coram Rd. Let by New York State DOT on January 22, 2026, Suffolk, Region 10. 9 bids received; low bid $3,529,256 by Rosemar Contracting Inc.

Owner
New York State DOT
Letting
22 JAN 2026
Pay items
152
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rosemar Contracting Inc$3,529,256Low
2Pratt Brothers Inc$4,056,789+15%
3H & L Contracting LLC$4,460,223+26%
4Suffolk Paving Corp$4,470,270+27%
5G & M Earth Moving Inc$4,972,000+41%
6Oliveira Contracting Inc$5,035,569+43%
7Peter Scalamandre & Sons Inc$5,468,713+55%
8United Paving Corp$5,942,444+68%
9Quintal Contracting Corp$6,897,149+95%
NYSDOT contract D265655: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rosemar Contracting Inc2. Pratt Brothers Inc3. H & L Contracting LLC4. Suffolk Paving Corp5. G & M Earth Moving Inc6. Oliveira Contracting Inc
1Clearing and Grubbing (201.06)LS1$10,000$50,000$35,790$10.00$35,323$30,000
2Unclassified Excavation and Disposal (203.02)CY2,157.84$65.00$88.00$134.27$75.00$135.00$75.00
3Embankment In Place (203.03)CY1,028$10.00$5.00$1.00$25.00$5.00$60.00
4Select Granular Fill (203.07)CY1,710$10.00$20.00$70.00$40.00$60.00$80.00
5Trench and Culvert Excavation (206.0201)CY3,063$25.00$5.00$45.00$25.00$1.00$10.00
6 (206.03100010)438$145.00$151.00$40.00$15.00$215.00$160.00
7Test Pit Excavation (206.05)EACH7$500.00$1,200.00$3,000.00$500.00$6,000.00$3,600.00
8Geotextile Separation (207.21)SY3,000$2.50$2.25$6.10$4.00$2.00$4.00
9Mulch – Temporary (209.100101)SY152$10.00$12.00$4.00$10.00$10.00$10.00
10Seed and Mulch – Temporary (209.1003)SY152$10.00$12.00$4.00$10.00$10.00$10.00
11 (209.11010024)12$350.00$275.00$590.81$38.00$250.00$600.00
12Sediment Filter Log, 12″ (209.2301)LF220$20.00$16.00$20.00$20.00$15.00$27.00
13 (304.10119917)702$110.00$125.00$115.00$150.00$115.00$120.00
14 (404.0189)TON84$105.00$130.00$170.00$500.00$187.00$140.00
15 (404.0971)TON1,767$105.00$156.00$165.00$185.00$187.00$140.00
16 (404.1989)TON595$165.00$295.00$225.00$350.00$176.00$250.00
17 (404.2589)TON1,168$165.00$295.00$250.00$300.00$193.00$250.00
18Diluted Tack Coat (407.0102)GAL1,628$1.00$3.00$5.00$8.00$15.00$7.00
19Asphalt Pavement Joint Adhesive (418.7603)LF10,941$0.75$1.50$0.70$1.10$1.00$3.00
20Production Cold Milling of Bituminous Concrete (490.10)SY11,968$3.50$5.00$9.00$10.00$10.00$5.00
21Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,217$3.50$5.00$15.00$10.00$10.00$5.00
22PCC Foundation for Pavement, PEM Concrete (503.1013)CY4$1,500.00$5,000.00$1,170.00$600.00$3,000.00$4,000.00
23 (520.09000010)4,851$4.50$3.00$1.00$3.00$8.00$10.00
24Shields and Shoring (552.17)SF17,558.46$0.10$1.00$1.00$2.00$2.00$1.00
25 (603.6002)LF83$170.00$156.00$325.00$70.00$510.00$275.00
26 (603.6003)LF1,705$145.00$103.00$230.00$80.00$220.00$175.00
27 (603.6005)LF212$150.00$145.00$275.00$105.00$205.00$400.00
28 (604.501002)LF57$1,450.00$1,600.00$1,500.00$1,200.00$2,800.00$1,250.00
29 (604.501005)LF69$1,300.00$1,600.00$1,300.00$1,200.00$2,400.00$1,500.00
30 (604.501011)LF21$1,450.00$1,300.00$1,300.00$1,200.00$1,900.00$2,400.00
31 (604.501012)LF30$1,500.00$1,200.00$1,350.00$1,200.00$2,400.00$1,500.00
32 (604.501022)LF10$1,500.00$1,600.00$1,400.00$1,200.00$1,900.00$1,500.00
33Concrete Sidewalks and Driveways (608.0101)CY67$900.00$950.00$1,400.00$850.00$890.00$1,450.00
34 (608.01050209)3$6,100.00$7,200.00$6,100.00$10,000$12,000$15,000
35 (608.01050409)2$6,700.00$7,900.00$6,700.00$10,000$12,000$22,000
36 (608.01050909)1$5,700.00$6,700.00$5,700.00$10,000$12,000$22,000
37 (608.02010015)196$120.00$181.00$5.00$50.00$145.00$180.50
38Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON12$550.00$450.00$1,000.00$500.00$150.00$300.00
39 (608.02020015)131$110.00$121.00$10.00$65.00$118.00$250.00
40 (608.21000003)17$675.00$675.00$675.00$65.00$215.00$371.00
41 (609.0401)LF3,045$36.00$36.00$35.50$65.00$45.00$70.00
42Mycorrhizal Fungi (610.0701)LB3$36.00$36.00$100.00$40.00$40.00$36.00
43Moisture Retention Additive (610.08)LB1$50.00$50.00$100.00$55.00$50.00$50.00
44Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY1$100.00$100.00$50.00$115.00$110.00$100.00
45Topsoil - Roadside (610.1402)CY18$170.00$170.00$90.00$1.00$185.00$170.00
46Turf Establishment - Roadside (610.1601)SY164$15.00$15.00$20.00$195.00$15.00$15.00
47Watering Vegetation (610.19)1,000 GALLONS2$200.00$200.00$300.00$220.00$200.00$200.00
48 (611.0171)EACH4$2,500.00$2,500.00$1,100.00$3,000.00$2,750.00$2,500.00
49Post-Planting Care (611.19)EACH4$250.00$250.00$300.00$300.00$275.00$250.00
50 (611.19010024)4$500.00$500.00$400.00$600.00$550.00$500.00
51Basic Work Zone Traffic Control (619.01)LS1$275,000$169,957$250,000$425,000$180,000$471,328
52Type III Construction Barricades (619.04)EACH8$130.00$150.00$185.00$100.00$350.00$430.00
53 (619.080102)LF4,940$1.75$1.75$3.00$1.85$2.00$2.00
54 (619.080202)EACH27$50.00$50.00$50.00$60.00$55.00$52.00
55 (619.100101)LF8,120$0.50$0.50$1.00$0.65$0.50$1.00
56 (619.10050020)720$35.00$125.00$4.30$50.00$40.00$12.00
57 (619.110511)EACH2$10,000$10,000$25,000$10,000$15,000$35,000
58Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH4$500.00$1,200.00$500.00$550.00$500.00$206.00
59Nighttime Operations (Entire Project) (619.24)LS1$50,000$65,000$25,000$145,000$65,000$80,000
60Pavement Patching (Force Acount) (619.2601)DOL17,550$1.00$1.00$1.00$1.00$1.00$1.00
61Cleaning Drainage Structures (621.04)EACH2$2,500.00$2,500.00$4,500.00$1,500.00$3,500.00$4,440.00
62Screened Gravel (In-Place Measure) (623.10)CY150$50.00$73.00$85.00$100.00$55.00$128.00
63Survey Operations (625.01)LS1$55,600$75,000$90,000$65,000$45,000$140,000
64Steel Pin and Cap Right of Way Markers (625.05)EACH12$100.00$300.00$800.00$10.00$150.00$250.00
65 (634.10010015)LS1$10,000$12,500$10,000$10,000$10,000$15,000
66Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF8,120$1.00$1.00$1.00$1.10$1.00$1.00
67Field Laboratory (637.01)EACH1$5,000.00$25,000$8,500.00$1,500.00$3,500.00$7,890.00
68Concrete Cylinder Curing Equipment (637.04)EACH1$2,400.00$1,500.00$4,350.00$500.00$500.00$7,890.00
69Engineer’s Field Office – Type 2 (637.12)MONTH12$4,500.00$5,000.00$6,500.00$5,000.00$6,500.00$8,300.00
70Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
71Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
72 (637.41000115)12$150.00$300.00$245.51$100.00$250.00$197.00
73Ground-Mounted Sign Panels without Z-bars (645.5101)SF10$75.00$75.00$75.00$100.00$80.00$125.00
74Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF23$95.00$95.00$95.00$100.00$100.00$120.00
75Type A Sign Posts (645.81)EACH13$425.00$425.00$425.00$360.00$460.00$350.00
76Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH2$350.00$350.00$350.00$525.00$385.00$200.00
77Reference Marker Panel (646.21)EACH1$125.00$125.00$125.00$265.00$135.00$200.00
78Steel Post, 2.0 lb/ft (646.32)EACH1$300.00$300.00$300.00$315.00$300.00$250.00
79Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH5$425.00$425.00$425.00$615.00$450.00$1,000.00
80Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH4$50.00$50.00$50.00$360.00$50.00$125.00
81Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH11$60.00$60.00$60.00$460.00$60.00$350.00
82 (655.07030010)3$1,225.00$1,995.00$2,500.00$2,500.00$2,800.00$4,000.00
83Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH12$1,550.00$2,375.00$2,750.00$3,000.00$2,500.00$4,500.00
84Manhole Frame & Cover (655.1202)EACH8$500.00$1,025.00$1,000.00$1,200.00$1,700.00$2,100.00
85 (662.60000108)1,000$1.00$1.00$1.00$1.00$1.00$1.00
86 (663.0112)LF538$220.00$212.00$211.00$310.00$450.00$211.00
87 (663.1006)EACH2$2,700.00$2,600.00$2,600.00$4,800.00$1,990.00$2,600.00
88 (663.1012)EACH4$3,200.00$3,000.00$3,000.00$7,000.00$5,200.00$3,000.00
89 (663.1301)EACH1$10,500$10,000$10,000$32,000$19,000$10,000
90 (663.1302)EACH1$10,500$10,000$10,000$32,000$19,000$10,000
91 (663.161212)EACH4$20,500$20,000$20,000$6,500.00$55,000$20,000
92Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB1,190$38.00$36.00$36.00$15.00$2.00$36.00
93 (663.2504)EACH2$3,750.00$3,700.00$3,700.00$7,000.00$16,000$3,700.00
94Relocate Existing Hydrant (663.31)EACH1$8,750.00$8,500.00$8,500.00$20,000$15,000$8,500.00
95Adjust Existing Valve Box Elevation (663.33)EACH5$150.00$75.00$78.28$250.00$250.00$3,180.00
96Disconnect and Cap Existing Water Main (663.40)EACH4$3,500.00$3,400.00$3,400.00$2,800.00$250.00$3,400.00
97Remove and Dispose of Existing Water Valve & Valve Box (663.42)EACH1$1,000.00$900.00$900.00$1,200.00$250.00$900.00
98Remove and Dispose of Existing Hydrant (663.43)EACH1$1,550.00$1,500.00$1,500.00$1,800.00$250.00$1,500.00
99 (680.05010007)1$28,600$30,000$28,600$31,000$31,000$35,000
100Pole Excavation and Concrete Foundation (680.5001)CY10$3,200.00$2,350.00$3,900.00$450.00$13,000$516.00
101Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH1$1,500.00$950.00$3,800.00$2,000.00$115.00$292.00
102 (680.51050010)5$1,900.00$3,900.00$1,900.00$800.00$2,000.00$2,060.00
103 (680.520103)LF12$16.00$53.00$16.00$20.00$17.00$26.00
104 (680.520106)LF158$29.00$41.00$29.00$35.00$32.00$36.00
105 (680.520108)LF270$67.00$52.00$67.00$76.00$74.00$61.00
106 (680.520110)LF100$92.00$76.00$92.00$110.00$100.00$77.00
107 (680.6708)EACH5$1,600.00$2,200.00$1,600.00$1,800.00$1,760.00$2,170.00
108Riser Assembly, 2-inch Diameter (680.700606)EACH1$1,900.00$1,485.00$1,900.00$2,100.00$2,000.00$1,550.00
109 (680.730214)LF50$3.00$15.00$3.00$3.50$3.00$5.00
110 (680.730514)LF3,000$4.50$4.00$4.50$5.10$5.00$6.00
111 (680.731014)LF382$12.00$5.25$12.00$14.00$13.00$7.00
112 (680.79400010)6$800.00$356.00$800.00$900.00$850.00$877.00
113 (680.79490010)4$250.00$1,000.00$250.00$300.00$250.00$361.00
114 (680.80324515)1$2,500.00$3,800.00$2,500.00$3,000.00$2,500.00$2,890.00
115Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH8$180.00$112.00$180.00$200.00$200.00$124.00
116Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102)EACH4$180.00$120.00$180.00$200.00$200.00$129.00
117Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH8$180.00$112.00$180.00$200.00$200.00$129.00
118Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104)EACH10$180.00$130.00$180.00$200.00$200.00$129.00
119Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH8$180.00$112.00$180.00$200.00$200.00$129.00
120Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106)EACH6$180.00$135.00$180.00$200.00$200.00$134.00
121Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH44$160.00$452.00$160.00$190.00$200.00$567.00
122Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH12$315.00$532.00$315.00$365.00$350.00$774.00
123Traffic Signal Bracket Assembly - 2 Way (680.8112)EACH2$515.00$880.00$515.00$565.00$560.00$1,130.00
124Pedestrian Signal Section, Aluminum, Type I, for 16 inches by 18 inches LED module (680.813108)EACH8$275.00$500.00$275.00$315.00$300.00$1,030.00
125Pedestrian Signal Bracket Mount Assembly (680.8141)EACH2$400.00$444.00$400.00$450.00$440.00$619.00
126Pedestrian Signal Post Top Mount Assembly (680.8142)EACH6$400.00$541.00$400.00$440.00$440.00$671.00
127Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002)EACH8$535.00$388.00$535.00$600.00$590.00$877.00
128 (680.8151)EACH7$1,200.00$1,425.00$1,200.00$1,300.00$1,300.00$1,600.00
129 (680.8152)EACH1$1,400.00$3,000.00$1,400.00$1,500.00$1,500.00$2,890.00
130Backplates for Traffic Signal Heads (680.8199)EACH12$220.00$545.00$220.00$265.00$240.00$361.00
131 (680.8207)EACH1$900.00$1,240.00$900.00$1,000.00$1,000.00$1,340.00
132 (680.82250108)1$800.00$178.00$800.00$900.00$900.00$619.00
133 (680.83200010)LS1$5,000.00$10,000$5,000.00$5,500.00$5,500.00$5,670.00
134 (680.85166010)1$40,750$66,000$40,750$42,500$45,000$48,000
135 (680.85166510)1$41,400$65,000$41,400$44,000$45,000$55,000
136Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH1$2,200.00$1,775.00$2,200.00$2,500.00$2,400.00$2,060.00
137 (680.950206)LF120$16.00$6.30$16.00$18.00$18.00$17.00
138Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$25.00$25.00$25.00$25.00$25.00$25.00
139 (680.99020010)2$2,500.00$1,900.00$2,500.00$2,800.00$2,750.00$1,750.00
140 (680.99050010)1$1,400.00$900.00$1,400.00$1,500.00$1,500.00$877.00
141 (680.99100010)1$1,200.00$1,425.00$1,200.00$1,300.00$1,300.00$1,500.00
142 (685.07200110)5,133$0.74$0.75$0.74$1.00$0.80$1.00
143 (685.07200210)12$150.00$150.00$150.00$175.00$160.00$155.00
144 (685.07200310)29$175.00$175.00$175.00$200.00$190.00$181.00
145 (685.07200510)2,162$2.65$2.65$2.65$3.00$3.00$3.00
146 (685.07200610)5,054$0.74$0.75$0.74$1.00$0.80$1.00
147 (685.07200710)1,994$2.65$2.65$2.65$3.00$3.00$3.00
148Field Change Payment (FCP) (697.03)DOL332,000$1.00$1.00$1.00$1.00$1.00$1.00
149Asphalt Price Adjustment (698.04)DOL7,943$1.00$1.00$1.00$1.00$1.00$1.00
150Fuel Price Adjustment (698.05)DOL5,624$1.00$1.00$1.00$1.00$1.00$1.00
151Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
152Mobilization (699.040001)LS1$130,000$150,000$170,000$169,730$185,000$192,000
NYSDOT contract D265655: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy