NYSDOT contract D265666 bid tabulation
MAINTENANCE CLEANING OF VARIOUS HIGHWAYS IN NYC. Let by New York State DOT on March 12, 2026, Bronx, Kings, New York, Queens,, Region 11. 3 bids received; low bid $3,949,011 by Quintal Contracting Corp.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 13
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Quintal Contracting Corp | $3,949,011 | Low |
| 2 | Metroexpress Services Inc | $4,297,435 | +9.0% |
| 3 | Liberty II Sweeping and Maintenance Inc | $4,319,359 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Quintal Contracting Corp | 2. Metroexpress Services Inc | 3. Liberty II Sweeping and Maintenance Inc |
|---|---|---|---|---|---|---|
| 1 | Basic Work Zone Traffic Control (Daily Operations) (619.0101) | LS | 1 | $200,000 | $400,000 | $600,000 |
| 2 | (619.01940111) | 12 | $1,000.00 | $1,000.00 | $10.00 | |
| 3 | (619.01940311) | 12 | $500.00 | $1,000.00 | $10.00 | |
| 4 | Type III Construction Barricades (619.04) | EACH | 50 | $5.00 | $50.00 | $10.00 |
| 5 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $7,000.00 | $9,000.00 | $500.00 |
| 6 | (633.04010011) | 7,294 | $416.50 | $453.00 | $435.00 | |
| 7 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 27 | $3,475.00 | $2,500.00 | $2,000.00 |
| 8 | (637.31020020) | 30 | $900.00 | $950.00 | $900.00 | |
| 9 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 10 | (639.10210011) | LS | 1 | $165,000 | $50,000 | $50,000 |
| 11 | Field Change Payment (FCP) (697.03) | DOL | 243,000 | $1.00 | $1.00 | $1.00 |
| 12 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 13 | Mobilization (699.040001) | LS | 1 | $151,885 | $163,653 | $166,129 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.