RankBidderTotal bidAgainst the low bid
1Bove Industries Inc$6,775,000Low
2Pratt Brothers Inc$7,741,147+14%
3GGG Construction Corp$8,199,361+21%
4Oliveira Contracting Inc$8,695,000+28%
5H & L Contracting LLC$8,796,732+30%
6Aii Allen Industries Inc$9,418,933+39%
7Peter Scalamandre & Sons Inc$9,457,713+40%
8Triumph Construction Corp$9,688,184+43%
9Quintal Contracting Corp$10,706,833+58%
10Jrcruz Corp$11,240,400+66%
11Fos Development Corp$13,349,182+97%
NYSDOT contract D265460: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bove Industries Inc2. Pratt Brothers Inc3. GGG Construction Corp4. Oliveira Contracting Inc5. H & L Contracting LLC6. Aii Allen Industries Inc
1Clearing and Grubbing (201.07)ACRE2$40,000$20,000$25,000$50,000$31,000$20,000
2Unclassified Excavation and Disposal (203.02)CY8,753$35.00$45.00$69.00$72.00$90.00$90.00
3Embankment In Place (203.03)CY6,068$40.00$12.00$43.00$80.00$50.00$40.00
4Select Granular Fill (203.07)CY518$43.00$25.00$95.00$60.00$75.00$65.00
5Trench and Culvert Excavation (206.0201)CY2,053$50.00$24.00$40.00$4.00$36.00$6.00
6Conduit Excavation and Backfill including Surface Restoration (206.03)LF4,465$30.00$15.00$15.00$60.00$25.00$32.00
7 (304.10119917)2,959$50.00$132.00$75.00$115.00$95.00$110.00
8 (404.0001)TON34$125.00$125.00$125.00$125.00$125.00$125.00
9 (404.0189)TON289$155.00$190.00$285.00$180.00$440.00$260.00
10 (404.0951)TON378$155.00$190.00$285.00$180.00$440.00$260.00
11Diluted Tack Coat (407.0102)GAL552$6.00$3.00$23.00$8.00$5.00$6.00
12Asphalt Pavement Joint Adhesive (418.7603)LF1,717$5.00$10.00$5.00$3.00$12.00$7.00
13Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY154$50.00$85.00$50.00$25.00$180.00$30.00
14 (502.0021)2,021$350.00$775.00$690.00$475.00$500.00$840.00
15 (502.0221)23$850.00$925.00$805.00$1,600.00$755.26$1,250.00
16 (502.31010018)35$150.00$40.00$155.00$300.00$125.00$210.00
17 (502.32010010)121$90.00$70.00$50.00$60.00$95.00$140.00
18 (502.36130018)14$565.00$3,800.00$1,350.00$3,800.00$1,878.00$2,600.00
19 (502.47200004)27$550.00$642.00$375.00$750.00$309.93$535.00
20 (502.9100)6,037$12.00$10.00$8.65$15.00$12.83$21.00
21Longitudinal Joints (502.9110)LF3,924$12.00$8.00$5.25$50.00$52.00$19.00
22Sealing Transverse Joints- Highway Joint Sealant (502.9210)LF6,037$8.00$8.65$13.50$10.00$8.65$10.00
23Sealing Longitudinal Joints-Highway Joint Sealant (502.9310)LF3,924$8.00$8.15$9.35$10.00$8.15$10.00
24Performance Concrete Quality Adjustment - PCC Pavement (502.99)QUALITY UNIT1$3.52$3.52$3.52$3.52$3.52$3.52
25Production Grinding – New PCC Pavement with Slurry Removal (505.0202)SY5,112$10.00$13.00$15.00$23.00$11.00$13.00
26 (520.05000010)2,109$5.00$6.00$7.25$5.00$5.25$7.00
27Shields and Shoring (552.17)SF21,782$17.00$1.00$1.00$2.00$0.10$2.00
28 (603.6002)LF676$170.00$105.00$100.00$210.00$167.00$323.00
29 (603.6003)LF465$175.00$115.00$100.00$250.00$175.00$355.00
30 (604.07200110)2$800.00$750.00$3,000.00$1,400.00$1,550.00$700.00
31 (604.07240110)2$5,000.00$3,000.00$3,500.00$6,360.00$4,000.00$10,000
32 (604.07260011)9$850.00$3,200.00$1,500.00$2,420.00$1,860.00$600.00
33 (604.07290010)48$130.00$100.00$115.00$82.00$95.00$150.00
34 (604.501012)LF142$950.00$950.00$1,850.00$1,300.00$1,423.00$1,900.00
35HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF423$47.00$50.00$86.25$47.00$45.00$68.00
36Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH1$4,750.00$4,800.00$4,025.00$4,750.00$3,750.00$10,500
37Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101)LF463$10.00$11.00$28.75$10.00$10.00$30.00
38Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941)EACH1$1,000.00$1,200.00$460.00$1,000.00$1,000.00$2,200.00
39 (607.86000010)965$18.00$11.00$12.00$16.00$22.00$12.00
40Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT17$125.00$125.00$125.00$125.00$125.00$125.00
41 (608.01020005)81$550.00$1,600.00$1,265.00$1,500.00$1,168.00$900.00
42 (608.01050010)5$1,500.00$2,000.00$1,265.00$870.00$1,200.00$850.00
43 (608.01050109)3$9,500.00$8,000.00$4,715.00$4,140.00$4,500.00$6,200.00
44 (608.01050909)1$11,300$9,000.00$5,735.00$4,750.00$5,400.00$7,500.00
45 (608.02010015)9$350.00$500.00$250.00$280.00$10.00$250.00
46Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON332$300.00$415.00$400.00$200.00$255.00$300.00
47 (608.02020015)10$10.00$60.00$115.00$280.00$10.00$110.00
48 (609.04010510)183$45.00$50.00$46.00$68.00$42.50$58.00
49 (609.04020510)1,083$40.00$65.00$44.75$69.00$55.00$62.00
50 (609.04030510)320$40.00$50.00$43.00$68.00$40.00$56.00
51 (609.04070510)3,730$85.00$50.00$39.50$69.00$38.00$51.00
52Mycorrhizal Fungi (610.0701)LB256$15.00$10.00$11.50$15.00$35.00$17.00
53Moisture Retention Additive (610.08)LB138$15.00$7.50$9.00$15.00$42.00$17.00
54Compost (610.10)CY112$60.00$65.00$75.00$60.00$50.00$65.00
55Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY18$25.00$60.00$67.00$25.00$40.00$30.00
56Weed Removal (610.13)SY729$6.00$10.00$11.50$6.00$2.00$6.00
57Topsoil – Reuse On-Site Materials (610.1401)CY386$35.00$85.00$69.00$44.00$90.00$50.00
58Topsoil - Roadside (610.1402)CY1,158$85.00$100.00$103.50$85.00$90.00$65.00
59Turf Establishment - Roadside (610.1601)SY13,896$3.50$3.25$3.50$4.00$1.50$4.50
60Wildflower Seeding (610.17)SY4,025$4.00$3.25$3.50$5.00$3.00$5.00
61Watering Vegetation (610.19)1,000 GALLONS228$1.00$85.00$100.00$1.00$100.00$1.00
62 (611.0121)EACH160$500.00$550.00$633.00$500.00$575.00$550.00
63 (611.0332)EACH53$200.00$150.00$173.00$200.00$300.00$230.00
64 (611.0361)EACH5$650.00$500.00$575.00$650.00$600.00$720.00
65 (611.0451)EACH900$65.00$130.00$150.00$65.00$90.00$72.00
66 (611.0561)EACH96$85.00$150.00$173.00$85.00$95.00$95.00
67 (611.0751)EACH567$40.00$30.00$35.00$40.00$40.00$45.00
68Post-Planting Care (611.19)EACH1,092$0.50$20.00$23.00$1.00$19.00$0.50
69 (611.19020024)16$1.00$115.00$133.00$1.00$60.00$1.00
70 (611.19030024)6$1.00$45.00$52.00$1.00$30.00$1.00
71 (611.19040024)90$1.00$18.00$21.00$1.00$10.00$1.00
72 (611.19050024)10$1.00$15.00$17.00$1.00$10.00$1.00
73 (614.060102)EACH5$550.00$350.00$403.00$450.00$450.00$450.00
74 (614.060202)EACH5$600.00$800.00$920.00$550.00$600.00$550.00
75 (614.060302)EACH5$825.00$1,800.00$2,070.00$650.00$750.00$650.00
76 (614.060402)EACH5$1,350.00$2,500.00$2,875.00$750.00$900.00$1,250.00
77 (614.060502)EACH5$2,000.00$6,000.00$6,900.00$1,250.00$1,200.00$1,300.00
78 (614.060602)EACH1$2,500.00$8,000.00$9,200.00$5,000.00$1,800.00$5,000.00
79 (614.060702)EACH1$3,500.00$12,000$13,800$7,500.00$2,400.00$6,000.00
80 (615.33020011)10$1,050.00$1,050.00$1,050.00$860.00$690.00$900.00
81Basic Work Zone Traffic Control (619.01)LS1$202,719$195,919$360,000$543,000$899,501$225,000
82Type III Construction Barricades (619.04)EACH8$130.00$150.00$200.00$430.00$165.00$380.00
83 (619.080101)LF6,986$1.50$1.65$1.75$2.00$1.50$1.70
84 (619.080102)LF19,457$1.50$1.65$1.75$2.00$1.50$1.70
85 (619.080202)EACH11$95.00$105.00$110.00$100.00$95.00$115.00
86 (619.0901)LF6,986$0.50$0.65$0.60$1.00$0.52$0.60
87 (619.10050020)304$35.00$75.00$20.00$50.00$25.00$46.00
88 (619.110543)EACH1$20,000$25,000$18,500$10,000$55,000$30,000
89 (619.110943)EACH1$20,000$25,000$16,500$10,000$55,000$30,000
90Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF5,400$30.00$62.00$52.00$60.00$35.00$152.00
91Warning Lights on Temporary Positive Barriers (619.1719)EACH273$25.00$160.00$100.00$50.00$120.00$125.00
92Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH2$15,000$7,000.00$7,500.00$10,000$12,000$19,000
93Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH2$15,000$8,400.00$12,000$12,000$12,000$20,000
94Nighttime Operations (Entire Project) (619.24)LS1$35,000$60,000$100,000$60,000$75,000$150,000
95 (619.67020010)LS1$42,035$50,000$48,350$42,040$50,000$55,000
96Cleaning Closed Drainage Systems (621.03)LF139$19.55$5.00$10.00$68.00$8.00$9.00
97Cleaning Drainage Structures (621.04)EACH10$838.89$800.00$500.00$1,520.00$900.00$1,000.00
98Survey Operations (625.01)LS1$115,000$75,000$65,000$120,000$225,000$50,000
99 (625.09010015)LS1$4,000.00$40,000$5,000.00$20,366$7,500.00$20,000
100Concrete Cylinder Curing Equipment (637.04)EACH1$4,500.00$1,500.00$1,500.00$5,200.00$5,000.00$5,000.00
101Engineer’s Field Office – Type 3 (637.13)MONTH15$7,500.00$6,000.00$4,000.00$6,000.00$6,500.00$3,000.00
102Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
103Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
104 (637.41000115)15$125.00$200.00$175.00$160.00$150.00$130.00
105 (637.41000215)15$125.00$200.00$175.00$160.00$150.00$130.00
106 (637.41000315)15$125.00$200.00$175.00$160.00$150.00$130.00
107 (637.41000415)15$125.00$200.00$175.00$160.00$150.00$130.00
108 (642.05960024)39$50.00$425.00$325.00$800.00$45.00$220.00
109Anchor Bolts (644.11)LB792$9.75$11.00$17.25$10.00$12.00$15.00
110Drilled Shaft for Overhead Sign Structures (644.20)CY15$7,000.00$4,000.00$4,370.00$4,500.00$3,500.00$2,600.00
111 (644.420925)EACH1$95,500$115,000$132,250$95,500$145,000$135,000
112Performance Concrete Quality Adjustment (644.99)QUALITY UNIT1$12.50$12.50$12.50$12.50$12.50$12.50
113 (645.10010010)28$210.00$210.00$92.00$210.00$190.00$65.00
114 (645.17010008)7$383.00$385.00$3,220.00$380.00$383.00$1,500.00
115 (645.35010010)6$355.00$355.00$300.00$360.00$355.00$4,700.00
116Ground-Mounted Sign Panels without Z-bars (645.5101)SF15$30.00$30.00$74.75$30.00$30.00$80.00
117Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF259$37.00$37.00$74.75$37.00$37.00$86.00
118Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF60$38.00$38.00$74.75$38.00$38.00$140.00
119 (645.52020110)69$46.00$46.00$74.75$46.00$46.00$140.00
120 (645.52030110)48$55.00$55.00$80.50$55.00$55.00$140.00
121 (645.62000110)198$55.00$55.00$80.50$55.00$50.00$125.00
122Type A Sign Posts (645.81)EACH51$285.00$300.00$345.00$290.00$275.00$350.00
123 (645.830402)EACH2$2,950.00$3,000.00$4,025.00$2,950.00$2,950.00$7,800.00
124Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH2$225.00$225.00$402.50$230.00$225.00$900.00
125 (645.85020210)2$2,990.00$3,000.00$3,737.50$2,990.00$2,990.00$4,600.00
126Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH82$27.00$27.00$57.50$27.00$22.00$85.00
127Steel Post, 1.1 lb/ft (646.31)EACH73$195.00$195.00$230.00$200.00$160.00$165.00
128Flexible Delineator, Single Unit, Back to Back (646.41)EACH6$100.00$100.00$258.75$100.00$100.00$85.00
129Brackets for Barrier and Multidirectional Mounting (646.50)EACH7$75.00$75.00$86.25$75.00$75.00$95.00
130Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20)EACH1$15,000$14,000$31,625$16,220$11,000$34,000
131Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH2$27.50$27.50$287.50$28.00$27.50$170.00
132Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53)EACH1$82.50$82.50$460.00$83.00$82.50$5,100.00
133Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH25$27.50$27.50$345.00$28.00$27.50$170.00
134Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH1$40.00$40.00$862.50$40.00$40.00$2,000.00
135Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH1$350.00$350.00$1,725.00$350.00$350.00$2,600.00
136 (654.0101)EACH1$1,200.00$1,100.00$1,750.00$1,500.00$2,100.00$1,000.00
137 (654.0102)EACH1$1,300.00$1,100.00$1,750.00$2,500.00$2,100.00$1,000.00
138 (654.0103)EACH5$1,500.00$1,150.00$1,750.00$4,000.00$2,100.00$1,000.00
139 (654.0104)EACH2$1,600.00$1,300.00$1,750.00$6,000.00$2,200.00$1,000.00
140 (654.0105)EACH2$1,800.00$1,400.00$1,750.00$7,500.00$2,200.00$1,000.00
141 (655.07030010)16$1,410.00$2,300.00$2,500.00$3,840.00$3,000.00$3,000.00
142Manhole Frame & Cover (655.1202)EACH2$515.00$1,025.00$1,000.00$1,770.00$1,550.00$1,400.00
143 (657.10020010)1$24,100$25,000$23,750$24,100$23,100$34,000
144 (657.17020010)1$2,500.00$200.00$500.00$5,000.00$1,500.00$500.00
145 (670.0106)EACH12$3,500.00$4,200.00$3,665.00$5,400.00$6,000.00$4,500.00
146 (670.1130)EACH1$4,088.00$4,400.00$4,700.00$4,090.00$5,000.00$4,800.00
147 (670.14480010)1$550.00$725.00$500.00$750.00$800.00$700.00
148 (670.15134510)3$7,065.00$7,600.00$8,125.00$7,070.00$10,000$8,000.00
149Breakaway Transformer Base (Aluminum) (670.19)EACH1$1,362.00$1,400.00$1,565.00$1,360.00$1,500.00$1,600.00
150 (670.2005)LF55$73.00$73.00$84.00$73.00$73.00$85.00
151 (670.21311210)2,475$16.00$16.00$18.50$16.00$16.00$18.00
152Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001)EACH4$3,500.00$3,300.00$2,500.00$2,530.00$1,853.00$2,200.00
153 (670.50142510)3$1,168.00$1,200.00$1,350.00$1,170.00$1,168.00$1,300.00
154 (670.7104)LF3,600$6.00$6.00$6.90$6.00$6.00$7.00
155Ground Wire No. 6 AWG. (670.7501)LF1,800$4.20$4.20$4.85$4.00$4.20$5.00
156 (670.75040011)2,555$4.90$4.90$5.65$5.00$4.90$5.60
157Remove Lamppost Foundation (670.82)EACH8$1,500.00$700.00$850.00$1,460.00$1,400.00$1,000.00
158Relocate Lamppost Assembly (670.90)EACH8$3,094.00$4,200.00$3,560.00$3,090.00$3,100.00$3,600.00
159 (670.92050010)16$935.00$935.00$1,075.00$940.00$935.00$1,050.00
160Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$14.32$14.32$14.32$14.32$14.32$14.32
161 (680.06040110)2$701.00$700.00$810.00$700.00$701.00$800.00
162Pole Excavation and Concrete Foundation (680.5001)CY1$5,500.00$2,100.00$1,000.00$6,820.00$10,000$5,000.00
163 (680.51050010)6$3,500.00$3,300.00$2,800.00$2,830.00$1,935.00$3,000.00
164 (680.51400010)2$5,500.00$5,600.00$5,000.00$3,580.00$3,578.00$5,200.00
165 (680.520110)LF1,980$58.80$59.00$67.60$59.00$58.80$69.00
166 (680.520203)LF10$24.50$25.00$28.15$25.00$24.50$29.00
167Inductance Loop Installation (680.54)LF75$32.80$33.00$37.75$33.00$32.80$38.00
168 (680.6704)EACH1$1,643.00$1,950.00$1,890.00$1,640.00$1,643.00$1,800.00
169Shielded Lead-in Cable (680.71)LF110$2.20$2.20$2.55$2.00$2.20$2.50
170Inductance Loop Wire (680.72)LF290$1.50$1.50$1.75$2.00$1.50$1.80
171 (680.79000010)LS1$2,794.00$10,000$3,500.00$2,790.00$2,794.00$3,200.00
172 (680.80326010)1$4,644.00$5,000.00$5,350.00$4,640.00$4,644.00$5,200.00
173 (680.80328110)1$6,296.00$6,900.00$7,250.00$6,300.00$6,296.00$7,200.00
174Breakaway Transformer Base (680.8223)EACH1$1,408.00$1,500.00$1,620.00$1,410.00$1,408.00$1,600.00
175 (680.83200010)LS1$1,450.00$20,000$3,000.00$11,600$5,800.00$6,000.00
176Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$12.50$12.50$12.50$12.50$12.50$12.50
177 (680.99060010)3$349.00$350.00$1,000.00$2,140.00$349.00$400.00
178 (680.99090010)9$2,500.00$650.00$650.00$1,850.00$600.00$1,000.00
179 (683.07021210)350$8.10$8.10$9.35$8.00$8.10$9.00
180 (683.07051210)4$2,858.00$3,000.00$3,300.00$2,860.00$2,858.00$3,200.00
181 (683.07100010)11,440$2.00$2.00$2.30$2.00$2.00$2.30
182 (683.07101210)3$523.00$525.00$600.00$520.00$523.00$600.00
183 (683.07202410)6,415$3.00$3.00$3.45$3.00$3.00$3.40
184 (683.10320010)2$2,917.00$3,000.00$3,355.00$2,920.00$2,917.00$3,200.00
185 (683.10330010)2$2,917.00$3,000.00$3,355.00$2,920.00$2,917.00$3,200.00
186 (683.10340010)2$3,153.00$3,400.00$3,625.00$3,150.00$3,153.00$3,500.00
187 (683.91150010)1$18,442$17,500$18,900$16,440$16,442$18,000
188 (685.03130018)13$250.00$250.00$288.00$250.00$250.00$280.00
189 (685.07200110)18,826$0.82$0.85$0.95$1.00$0.82$1.00
190 (685.07200210)8$150.00$150.00$172.50$160.00$150.00$170.00
191 (685.07200310)21$175.00$175.00$200.00$190.00$175.00$200.00
192 (685.07200410)1,897$2.00$1.95$2.25$2.00$1.95$2.10
193 (685.07200510)1,480$2.50$2.50$2.90$3.00$2.50$3.00
194 (685.07200610)14,039$0.82$0.85$0.95$1.00$0.82$1.00
195 (685.07200710)3,967$1.95$1.95$2.25$2.00$1.95$2.10
196 (685.07200910)4$75.00$75.00$86.25$80.00$75.00$85.00
197 (691.04000020)63,000$1.00$1.00$1.00$1.00$1.00$1.00
198Field Change Payment (FCP) (697.03)DOL680,000$1.00$1.00$1.00$1.00$1.00$1.00
199Asphalt Price Adjustment (698.04)DOL844$1.00$1.00$1.00$1.00$1.00$1.00
200Fuel Price Adjustment (698.05)DOL1,148$1.00$1.00$1.00$1.00$1.00$1.00
201Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
202Mobilization (699.040001)LS1$255,000$275,000$315,360$310,000$335,000$200,000
NYSDOT contract D265460: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of April 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy