NYSDOT contract D265460 bid tabulation
WANTAGH STATE PARKWAY SB RAMPS IMPROVEMENT AT OLD COUNTRY RD. Let by New York State DOT on April 10, 2025, Nassau, Region 10. 11 bids received; low bid $6,775,000 by Bove Industries Inc.
- Owner
- New York State DOT
- Letting
- 10 APR 2025
- Pay items
- 202
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bove Industries Inc | $6,775,000 | Low |
| 2 | Pratt Brothers Inc | $7,741,147 | +14% |
| 3 | GGG Construction Corp | $8,199,361 | +21% |
| 4 | Oliveira Contracting Inc | $8,695,000 | +28% |
| 5 | H & L Contracting LLC | $8,796,732 | +30% |
| 6 | Aii Allen Industries Inc | $9,418,933 | +39% |
| 7 | Peter Scalamandre & Sons Inc | $9,457,713 | +40% |
| 8 | Triumph Construction Corp | $9,688,184 | +43% |
| 9 | Quintal Contracting Corp | $10,706,833 | +58% |
| 10 | Jrcruz Corp | $11,240,400 | +66% |
| 11 | Fos Development Corp | $13,349,182 | +97% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bove Industries Inc | 2. Pratt Brothers Inc | 3. GGG Construction Corp | 4. Oliveira Contracting Inc | 5. H & L Contracting LLC | 6. Aii Allen Industries Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 2 | $40,000 | $20,000 | $25,000 | $50,000 | $31,000 | $20,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 8,753 | $35.00 | $45.00 | $69.00 | $72.00 | $90.00 | $90.00 |
| 3 | Embankment In Place (203.03) | CY | 6,068 | $40.00 | $12.00 | $43.00 | $80.00 | $50.00 | $40.00 |
| 4 | Select Granular Fill (203.07) | CY | 518 | $43.00 | $25.00 | $95.00 | $60.00 | $75.00 | $65.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 2,053 | $50.00 | $24.00 | $40.00 | $4.00 | $36.00 | $6.00 |
| 6 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 4,465 | $30.00 | $15.00 | $15.00 | $60.00 | $25.00 | $32.00 |
| 7 | (304.10119917) | 2,959 | $50.00 | $132.00 | $75.00 | $115.00 | $95.00 | $110.00 | |
| 8 | (404.0001) | TON | 34 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 9 | (404.0189) | TON | 289 | $155.00 | $190.00 | $285.00 | $180.00 | $440.00 | $260.00 |
| 10 | (404.0951) | TON | 378 | $155.00 | $190.00 | $285.00 | $180.00 | $440.00 | $260.00 |
| 11 | Diluted Tack Coat (407.0102) | GAL | 552 | $6.00 | $3.00 | $23.00 | $8.00 | $5.00 | $6.00 |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,717 | $5.00 | $10.00 | $5.00 | $3.00 | $12.00 | $7.00 |
| 13 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 154 | $50.00 | $85.00 | $50.00 | $25.00 | $180.00 | $30.00 |
| 14 | (502.0021) | 2,021 | $350.00 | $775.00 | $690.00 | $475.00 | $500.00 | $840.00 | |
| 15 | (502.0221) | 23 | $850.00 | $925.00 | $805.00 | $1,600.00 | $755.26 | $1,250.00 | |
| 16 | (502.31010018) | 35 | $150.00 | $40.00 | $155.00 | $300.00 | $125.00 | $210.00 | |
| 17 | (502.32010010) | 121 | $90.00 | $70.00 | $50.00 | $60.00 | $95.00 | $140.00 | |
| 18 | (502.36130018) | 14 | $565.00 | $3,800.00 | $1,350.00 | $3,800.00 | $1,878.00 | $2,600.00 | |
| 19 | (502.47200004) | 27 | $550.00 | $642.00 | $375.00 | $750.00 | $309.93 | $535.00 | |
| 20 | (502.9100) | 6,037 | $12.00 | $10.00 | $8.65 | $15.00 | $12.83 | $21.00 | |
| 21 | Longitudinal Joints (502.9110) | LF | 3,924 | $12.00 | $8.00 | $5.25 | $50.00 | $52.00 | $19.00 |
| 22 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 6,037 | $8.00 | $8.65 | $13.50 | $10.00 | $8.65 | $10.00 |
| 23 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 3,924 | $8.00 | $8.15 | $9.35 | $10.00 | $8.15 | $10.00 |
| 24 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $3.52 | $3.52 | $3.52 | $3.52 | $3.52 | $3.52 |
| 25 | Production Grinding – New PCC Pavement with Slurry Removal (505.0202) | SY | 5,112 | $10.00 | $13.00 | $15.00 | $23.00 | $11.00 | $13.00 |
| 26 | (520.05000010) | 2,109 | $5.00 | $6.00 | $7.25 | $5.00 | $5.25 | $7.00 | |
| 27 | Shields and Shoring (552.17) | SF | 21,782 | $17.00 | $1.00 | $1.00 | $2.00 | $0.10 | $2.00 |
| 28 | (603.6002) | LF | 676 | $170.00 | $105.00 | $100.00 | $210.00 | $167.00 | $323.00 |
| 29 | (603.6003) | LF | 465 | $175.00 | $115.00 | $100.00 | $250.00 | $175.00 | $355.00 |
| 30 | (604.07200110) | 2 | $800.00 | $750.00 | $3,000.00 | $1,400.00 | $1,550.00 | $700.00 | |
| 31 | (604.07240110) | 2 | $5,000.00 | $3,000.00 | $3,500.00 | $6,360.00 | $4,000.00 | $10,000 | |
| 32 | (604.07260011) | 9 | $850.00 | $3,200.00 | $1,500.00 | $2,420.00 | $1,860.00 | $600.00 | |
| 33 | (604.07290010) | 48 | $130.00 | $100.00 | $115.00 | $82.00 | $95.00 | $150.00 | |
| 34 | (604.501012) | LF | 142 | $950.00 | $950.00 | $1,850.00 | $1,300.00 | $1,423.00 | $1,900.00 |
| 35 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 423 | $47.00 | $50.00 | $86.25 | $47.00 | $45.00 | $68.00 |
| 36 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 1 | $4,750.00 | $4,800.00 | $4,025.00 | $4,750.00 | $3,750.00 | $10,500 |
| 37 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 463 | $10.00 | $11.00 | $28.75 | $10.00 | $10.00 | $30.00 |
| 38 | Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941) | EACH | 1 | $1,000.00 | $1,200.00 | $460.00 | $1,000.00 | $1,000.00 | $2,200.00 |
| 39 | (607.86000010) | 965 | $18.00 | $11.00 | $12.00 | $16.00 | $22.00 | $12.00 | |
| 40 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 17 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 41 | (608.01020005) | 81 | $550.00 | $1,600.00 | $1,265.00 | $1,500.00 | $1,168.00 | $900.00 | |
| 42 | (608.01050010) | 5 | $1,500.00 | $2,000.00 | $1,265.00 | $870.00 | $1,200.00 | $850.00 | |
| 43 | (608.01050109) | 3 | $9,500.00 | $8,000.00 | $4,715.00 | $4,140.00 | $4,500.00 | $6,200.00 | |
| 44 | (608.01050909) | 1 | $11,300 | $9,000.00 | $5,735.00 | $4,750.00 | $5,400.00 | $7,500.00 | |
| 45 | (608.02010015) | 9 | $350.00 | $500.00 | $250.00 | $280.00 | $10.00 | $250.00 | |
| 46 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 332 | $300.00 | $415.00 | $400.00 | $200.00 | $255.00 | $300.00 |
| 47 | (608.02020015) | 10 | $10.00 | $60.00 | $115.00 | $280.00 | $10.00 | $110.00 | |
| 48 | (609.04010510) | 183 | $45.00 | $50.00 | $46.00 | $68.00 | $42.50 | $58.00 | |
| 49 | (609.04020510) | 1,083 | $40.00 | $65.00 | $44.75 | $69.00 | $55.00 | $62.00 | |
| 50 | (609.04030510) | 320 | $40.00 | $50.00 | $43.00 | $68.00 | $40.00 | $56.00 | |
| 51 | (609.04070510) | 3,730 | $85.00 | $50.00 | $39.50 | $69.00 | $38.00 | $51.00 | |
| 52 | Mycorrhizal Fungi (610.0701) | LB | 256 | $15.00 | $10.00 | $11.50 | $15.00 | $35.00 | $17.00 |
| 53 | Moisture Retention Additive (610.08) | LB | 138 | $15.00 | $7.50 | $9.00 | $15.00 | $42.00 | $17.00 |
| 54 | Compost (610.10) | CY | 112 | $60.00 | $65.00 | $75.00 | $60.00 | $50.00 | $65.00 |
| 55 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 18 | $25.00 | $60.00 | $67.00 | $25.00 | $40.00 | $30.00 |
| 56 | Weed Removal (610.13) | SY | 729 | $6.00 | $10.00 | $11.50 | $6.00 | $2.00 | $6.00 |
| 57 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 386 | $35.00 | $85.00 | $69.00 | $44.00 | $90.00 | $50.00 |
| 58 | Topsoil - Roadside (610.1402) | CY | 1,158 | $85.00 | $100.00 | $103.50 | $85.00 | $90.00 | $65.00 |
| 59 | Turf Establishment - Roadside (610.1601) | SY | 13,896 | $3.50 | $3.25 | $3.50 | $4.00 | $1.50 | $4.50 |
| 60 | Wildflower Seeding (610.17) | SY | 4,025 | $4.00 | $3.25 | $3.50 | $5.00 | $3.00 | $5.00 |
| 61 | Watering Vegetation (610.19) | 1,000 GALLONS | 228 | $1.00 | $85.00 | $100.00 | $1.00 | $100.00 | $1.00 |
| 62 | (611.0121) | EACH | 160 | $500.00 | $550.00 | $633.00 | $500.00 | $575.00 | $550.00 |
| 63 | (611.0332) | EACH | 53 | $200.00 | $150.00 | $173.00 | $200.00 | $300.00 | $230.00 |
| 64 | (611.0361) | EACH | 5 | $650.00 | $500.00 | $575.00 | $650.00 | $600.00 | $720.00 |
| 65 | (611.0451) | EACH | 900 | $65.00 | $130.00 | $150.00 | $65.00 | $90.00 | $72.00 |
| 66 | (611.0561) | EACH | 96 | $85.00 | $150.00 | $173.00 | $85.00 | $95.00 | $95.00 |
| 67 | (611.0751) | EACH | 567 | $40.00 | $30.00 | $35.00 | $40.00 | $40.00 | $45.00 |
| 68 | Post-Planting Care (611.19) | EACH | 1,092 | $0.50 | $20.00 | $23.00 | $1.00 | $19.00 | $0.50 |
| 69 | (611.19020024) | 16 | $1.00 | $115.00 | $133.00 | $1.00 | $60.00 | $1.00 | |
| 70 | (611.19030024) | 6 | $1.00 | $45.00 | $52.00 | $1.00 | $30.00 | $1.00 | |
| 71 | (611.19040024) | 90 | $1.00 | $18.00 | $21.00 | $1.00 | $10.00 | $1.00 | |
| 72 | (611.19050024) | 10 | $1.00 | $15.00 | $17.00 | $1.00 | $10.00 | $1.00 | |
| 73 | (614.060102) | EACH | 5 | $550.00 | $350.00 | $403.00 | $450.00 | $450.00 | $450.00 |
| 74 | (614.060202) | EACH | 5 | $600.00 | $800.00 | $920.00 | $550.00 | $600.00 | $550.00 |
| 75 | (614.060302) | EACH | 5 | $825.00 | $1,800.00 | $2,070.00 | $650.00 | $750.00 | $650.00 |
| 76 | (614.060402) | EACH | 5 | $1,350.00 | $2,500.00 | $2,875.00 | $750.00 | $900.00 | $1,250.00 |
| 77 | (614.060502) | EACH | 5 | $2,000.00 | $6,000.00 | $6,900.00 | $1,250.00 | $1,200.00 | $1,300.00 |
| 78 | (614.060602) | EACH | 1 | $2,500.00 | $8,000.00 | $9,200.00 | $5,000.00 | $1,800.00 | $5,000.00 |
| 79 | (614.060702) | EACH | 1 | $3,500.00 | $12,000 | $13,800 | $7,500.00 | $2,400.00 | $6,000.00 |
| 80 | (615.33020011) | 10 | $1,050.00 | $1,050.00 | $1,050.00 | $860.00 | $690.00 | $900.00 | |
| 81 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $202,719 | $195,919 | $360,000 | $543,000 | $899,501 | $225,000 |
| 82 | Type III Construction Barricades (619.04) | EACH | 8 | $130.00 | $150.00 | $200.00 | $430.00 | $165.00 | $380.00 |
| 83 | (619.080101) | LF | 6,986 | $1.50 | $1.65 | $1.75 | $2.00 | $1.50 | $1.70 |
| 84 | (619.080102) | LF | 19,457 | $1.50 | $1.65 | $1.75 | $2.00 | $1.50 | $1.70 |
| 85 | (619.080202) | EACH | 11 | $95.00 | $105.00 | $110.00 | $100.00 | $95.00 | $115.00 |
| 86 | (619.0901) | LF | 6,986 | $0.50 | $0.65 | $0.60 | $1.00 | $0.52 | $0.60 |
| 87 | (619.10050020) | 304 | $35.00 | $75.00 | $20.00 | $50.00 | $25.00 | $46.00 | |
| 88 | (619.110543) | EACH | 1 | $20,000 | $25,000 | $18,500 | $10,000 | $55,000 | $30,000 |
| 89 | (619.110943) | EACH | 1 | $20,000 | $25,000 | $16,500 | $10,000 | $55,000 | $30,000 |
| 90 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 5,400 | $30.00 | $62.00 | $52.00 | $60.00 | $35.00 | $152.00 |
| 91 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 273 | $25.00 | $160.00 | $100.00 | $50.00 | $120.00 | $125.00 |
| 92 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 2 | $15,000 | $7,000.00 | $7,500.00 | $10,000 | $12,000 | $19,000 |
| 93 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 2 | $15,000 | $8,400.00 | $12,000 | $12,000 | $12,000 | $20,000 |
| 94 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $35,000 | $60,000 | $100,000 | $60,000 | $75,000 | $150,000 |
| 95 | (619.67020010) | LS | 1 | $42,035 | $50,000 | $48,350 | $42,040 | $50,000 | $55,000 |
| 96 | Cleaning Closed Drainage Systems (621.03) | LF | 139 | $19.55 | $5.00 | $10.00 | $68.00 | $8.00 | $9.00 |
| 97 | Cleaning Drainage Structures (621.04) | EACH | 10 | $838.89 | $800.00 | $500.00 | $1,520.00 | $900.00 | $1,000.00 |
| 98 | Survey Operations (625.01) | LS | 1 | $115,000 | $75,000 | $65,000 | $120,000 | $225,000 | $50,000 |
| 99 | (625.09010015) | LS | 1 | $4,000.00 | $40,000 | $5,000.00 | $20,366 | $7,500.00 | $20,000 |
| 100 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,500.00 | $1,500.00 | $1,500.00 | $5,200.00 | $5,000.00 | $5,000.00 |
| 101 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 15 | $7,500.00 | $6,000.00 | $4,000.00 | $6,000.00 | $6,500.00 | $3,000.00 |
| 102 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | (637.41000115) | 15 | $125.00 | $200.00 | $175.00 | $160.00 | $150.00 | $130.00 | |
| 105 | (637.41000215) | 15 | $125.00 | $200.00 | $175.00 | $160.00 | $150.00 | $130.00 | |
| 106 | (637.41000315) | 15 | $125.00 | $200.00 | $175.00 | $160.00 | $150.00 | $130.00 | |
| 107 | (637.41000415) | 15 | $125.00 | $200.00 | $175.00 | $160.00 | $150.00 | $130.00 | |
| 108 | (642.05960024) | 39 | $50.00 | $425.00 | $325.00 | $800.00 | $45.00 | $220.00 | |
| 109 | Anchor Bolts (644.11) | LB | 792 | $9.75 | $11.00 | $17.25 | $10.00 | $12.00 | $15.00 |
| 110 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 15 | $7,000.00 | $4,000.00 | $4,370.00 | $4,500.00 | $3,500.00 | $2,600.00 |
| 111 | (644.420925) | EACH | 1 | $95,500 | $115,000 | $132,250 | $95,500 | $145,000 | $135,000 |
| 112 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 113 | (645.10010010) | 28 | $210.00 | $210.00 | $92.00 | $210.00 | $190.00 | $65.00 | |
| 114 | (645.17010008) | 7 | $383.00 | $385.00 | $3,220.00 | $380.00 | $383.00 | $1,500.00 | |
| 115 | (645.35010010) | 6 | $355.00 | $355.00 | $300.00 | $360.00 | $355.00 | $4,700.00 | |
| 116 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 15 | $30.00 | $30.00 | $74.75 | $30.00 | $30.00 | $80.00 |
| 117 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 259 | $37.00 | $37.00 | $74.75 | $37.00 | $37.00 | $86.00 |
| 118 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 60 | $38.00 | $38.00 | $74.75 | $38.00 | $38.00 | $140.00 |
| 119 | (645.52020110) | 69 | $46.00 | $46.00 | $74.75 | $46.00 | $46.00 | $140.00 | |
| 120 | (645.52030110) | 48 | $55.00 | $55.00 | $80.50 | $55.00 | $55.00 | $140.00 | |
| 121 | (645.62000110) | 198 | $55.00 | $55.00 | $80.50 | $55.00 | $50.00 | $125.00 | |
| 122 | Type A Sign Posts (645.81) | EACH | 51 | $285.00 | $300.00 | $345.00 | $290.00 | $275.00 | $350.00 |
| 123 | (645.830402) | EACH | 2 | $2,950.00 | $3,000.00 | $4,025.00 | $2,950.00 | $2,950.00 | $7,800.00 |
| 124 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 2 | $225.00 | $225.00 | $402.50 | $230.00 | $225.00 | $900.00 |
| 125 | (645.85020210) | 2 | $2,990.00 | $3,000.00 | $3,737.50 | $2,990.00 | $2,990.00 | $4,600.00 | |
| 126 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 82 | $27.00 | $27.00 | $57.50 | $27.00 | $22.00 | $85.00 |
| 127 | Steel Post, 1.1 lb/ft (646.31) | EACH | 73 | $195.00 | $195.00 | $230.00 | $200.00 | $160.00 | $165.00 |
| 128 | Flexible Delineator, Single Unit, Back to Back (646.41) | EACH | 6 | $100.00 | $100.00 | $258.75 | $100.00 | $100.00 | $85.00 |
| 129 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 7 | $75.00 | $75.00 | $86.25 | $75.00 | $75.00 | $95.00 |
| 130 | Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20) | EACH | 1 | $15,000 | $14,000 | $31,625 | $16,220 | $11,000 | $34,000 |
| 131 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $27.50 | $27.50 | $287.50 | $28.00 | $27.50 | $170.00 |
| 132 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 1 | $82.50 | $82.50 | $460.00 | $83.00 | $82.50 | $5,100.00 |
| 133 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 25 | $27.50 | $27.50 | $345.00 | $28.00 | $27.50 | $170.00 |
| 134 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 1 | $40.00 | $40.00 | $862.50 | $40.00 | $40.00 | $2,000.00 |
| 135 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 1 | $350.00 | $350.00 | $1,725.00 | $350.00 | $350.00 | $2,600.00 |
| 136 | (654.0101) | EACH | 1 | $1,200.00 | $1,100.00 | $1,750.00 | $1,500.00 | $2,100.00 | $1,000.00 |
| 137 | (654.0102) | EACH | 1 | $1,300.00 | $1,100.00 | $1,750.00 | $2,500.00 | $2,100.00 | $1,000.00 |
| 138 | (654.0103) | EACH | 5 | $1,500.00 | $1,150.00 | $1,750.00 | $4,000.00 | $2,100.00 | $1,000.00 |
| 139 | (654.0104) | EACH | 2 | $1,600.00 | $1,300.00 | $1,750.00 | $6,000.00 | $2,200.00 | $1,000.00 |
| 140 | (654.0105) | EACH | 2 | $1,800.00 | $1,400.00 | $1,750.00 | $7,500.00 | $2,200.00 | $1,000.00 |
| 141 | (655.07030010) | 16 | $1,410.00 | $2,300.00 | $2,500.00 | $3,840.00 | $3,000.00 | $3,000.00 | |
| 142 | Manhole Frame & Cover (655.1202) | EACH | 2 | $515.00 | $1,025.00 | $1,000.00 | $1,770.00 | $1,550.00 | $1,400.00 |
| 143 | (657.10020010) | 1 | $24,100 | $25,000 | $23,750 | $24,100 | $23,100 | $34,000 | |
| 144 | (657.17020010) | 1 | $2,500.00 | $200.00 | $500.00 | $5,000.00 | $1,500.00 | $500.00 | |
| 145 | (670.0106) | EACH | 12 | $3,500.00 | $4,200.00 | $3,665.00 | $5,400.00 | $6,000.00 | $4,500.00 |
| 146 | (670.1130) | EACH | 1 | $4,088.00 | $4,400.00 | $4,700.00 | $4,090.00 | $5,000.00 | $4,800.00 |
| 147 | (670.14480010) | 1 | $550.00 | $725.00 | $500.00 | $750.00 | $800.00 | $700.00 | |
| 148 | (670.15134510) | 3 | $7,065.00 | $7,600.00 | $8,125.00 | $7,070.00 | $10,000 | $8,000.00 | |
| 149 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 1 | $1,362.00 | $1,400.00 | $1,565.00 | $1,360.00 | $1,500.00 | $1,600.00 |
| 150 | (670.2005) | LF | 55 | $73.00 | $73.00 | $84.00 | $73.00 | $73.00 | $85.00 |
| 151 | (670.21311210) | 2,475 | $16.00 | $16.00 | $18.50 | $16.00 | $16.00 | $18.00 | |
| 152 | Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001) | EACH | 4 | $3,500.00 | $3,300.00 | $2,500.00 | $2,530.00 | $1,853.00 | $2,200.00 |
| 153 | (670.50142510) | 3 | $1,168.00 | $1,200.00 | $1,350.00 | $1,170.00 | $1,168.00 | $1,300.00 | |
| 154 | (670.7104) | LF | 3,600 | $6.00 | $6.00 | $6.90 | $6.00 | $6.00 | $7.00 |
| 155 | Ground Wire No. 6 AWG. (670.7501) | LF | 1,800 | $4.20 | $4.20 | $4.85 | $4.00 | $4.20 | $5.00 |
| 156 | (670.75040011) | 2,555 | $4.90 | $4.90 | $5.65 | $5.00 | $4.90 | $5.60 | |
| 157 | Remove Lamppost Foundation (670.82) | EACH | 8 | $1,500.00 | $700.00 | $850.00 | $1,460.00 | $1,400.00 | $1,000.00 |
| 158 | Relocate Lamppost Assembly (670.90) | EACH | 8 | $3,094.00 | $4,200.00 | $3,560.00 | $3,090.00 | $3,100.00 | $3,600.00 |
| 159 | (670.92050010) | 16 | $935.00 | $935.00 | $1,075.00 | $940.00 | $935.00 | $1,050.00 | |
| 160 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $14.32 | $14.32 | $14.32 | $14.32 | $14.32 | $14.32 |
| 161 | (680.06040110) | 2 | $701.00 | $700.00 | $810.00 | $700.00 | $701.00 | $800.00 | |
| 162 | Pole Excavation and Concrete Foundation (680.5001) | CY | 1 | $5,500.00 | $2,100.00 | $1,000.00 | $6,820.00 | $10,000 | $5,000.00 |
| 163 | (680.51050010) | 6 | $3,500.00 | $3,300.00 | $2,800.00 | $2,830.00 | $1,935.00 | $3,000.00 | |
| 164 | (680.51400010) | 2 | $5,500.00 | $5,600.00 | $5,000.00 | $3,580.00 | $3,578.00 | $5,200.00 | |
| 165 | (680.520110) | LF | 1,980 | $58.80 | $59.00 | $67.60 | $59.00 | $58.80 | $69.00 |
| 166 | (680.520203) | LF | 10 | $24.50 | $25.00 | $28.15 | $25.00 | $24.50 | $29.00 |
| 167 | Inductance Loop Installation (680.54) | LF | 75 | $32.80 | $33.00 | $37.75 | $33.00 | $32.80 | $38.00 |
| 168 | (680.6704) | EACH | 1 | $1,643.00 | $1,950.00 | $1,890.00 | $1,640.00 | $1,643.00 | $1,800.00 |
| 169 | Shielded Lead-in Cable (680.71) | LF | 110 | $2.20 | $2.20 | $2.55 | $2.00 | $2.20 | $2.50 |
| 170 | Inductance Loop Wire (680.72) | LF | 290 | $1.50 | $1.50 | $1.75 | $2.00 | $1.50 | $1.80 |
| 171 | (680.79000010) | LS | 1 | $2,794.00 | $10,000 | $3,500.00 | $2,790.00 | $2,794.00 | $3,200.00 |
| 172 | (680.80326010) | 1 | $4,644.00 | $5,000.00 | $5,350.00 | $4,640.00 | $4,644.00 | $5,200.00 | |
| 173 | (680.80328110) | 1 | $6,296.00 | $6,900.00 | $7,250.00 | $6,300.00 | $6,296.00 | $7,200.00 | |
| 174 | Breakaway Transformer Base (680.8223) | EACH | 1 | $1,408.00 | $1,500.00 | $1,620.00 | $1,410.00 | $1,408.00 | $1,600.00 |
| 175 | (680.83200010) | LS | 1 | $1,450.00 | $20,000 | $3,000.00 | $11,600 | $5,800.00 | $6,000.00 |
| 176 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 177 | (680.99060010) | 3 | $349.00 | $350.00 | $1,000.00 | $2,140.00 | $349.00 | $400.00 | |
| 178 | (680.99090010) | 9 | $2,500.00 | $650.00 | $650.00 | $1,850.00 | $600.00 | $1,000.00 | |
| 179 | (683.07021210) | 350 | $8.10 | $8.10 | $9.35 | $8.00 | $8.10 | $9.00 | |
| 180 | (683.07051210) | 4 | $2,858.00 | $3,000.00 | $3,300.00 | $2,860.00 | $2,858.00 | $3,200.00 | |
| 181 | (683.07100010) | 11,440 | $2.00 | $2.00 | $2.30 | $2.00 | $2.00 | $2.30 | |
| 182 | (683.07101210) | 3 | $523.00 | $525.00 | $600.00 | $520.00 | $523.00 | $600.00 | |
| 183 | (683.07202410) | 6,415 | $3.00 | $3.00 | $3.45 | $3.00 | $3.00 | $3.40 | |
| 184 | (683.10320010) | 2 | $2,917.00 | $3,000.00 | $3,355.00 | $2,920.00 | $2,917.00 | $3,200.00 | |
| 185 | (683.10330010) | 2 | $2,917.00 | $3,000.00 | $3,355.00 | $2,920.00 | $2,917.00 | $3,200.00 | |
| 186 | (683.10340010) | 2 | $3,153.00 | $3,400.00 | $3,625.00 | $3,150.00 | $3,153.00 | $3,500.00 | |
| 187 | (683.91150010) | 1 | $18,442 | $17,500 | $18,900 | $16,440 | $16,442 | $18,000 | |
| 188 | (685.03130018) | 13 | $250.00 | $250.00 | $288.00 | $250.00 | $250.00 | $280.00 | |
| 189 | (685.07200110) | 18,826 | $0.82 | $0.85 | $0.95 | $1.00 | $0.82 | $1.00 | |
| 190 | (685.07200210) | 8 | $150.00 | $150.00 | $172.50 | $160.00 | $150.00 | $170.00 | |
| 191 | (685.07200310) | 21 | $175.00 | $175.00 | $200.00 | $190.00 | $175.00 | $200.00 | |
| 192 | (685.07200410) | 1,897 | $2.00 | $1.95 | $2.25 | $2.00 | $1.95 | $2.10 | |
| 193 | (685.07200510) | 1,480 | $2.50 | $2.50 | $2.90 | $3.00 | $2.50 | $3.00 | |
| 194 | (685.07200610) | 14,039 | $0.82 | $0.85 | $0.95 | $1.00 | $0.82 | $1.00 | |
| 195 | (685.07200710) | 3,967 | $1.95 | $1.95 | $2.25 | $2.00 | $1.95 | $2.10 | |
| 196 | (685.07200910) | 4 | $75.00 | $75.00 | $86.25 | $80.00 | $75.00 | $85.00 | |
| 197 | (691.04000020) | 63,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 198 | Field Change Payment (FCP) (697.03) | DOL | 680,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 199 | Asphalt Price Adjustment (698.04) | DOL | 844 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 200 | Fuel Price Adjustment (698.05) | DOL | 1,148 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 201 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 202 | Mobilization (699.040001) | LS | 1 | $255,000 | $275,000 | $315,360 | $310,000 | $335,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of April 10, 2025. Compiled by Mirage Metrics.