NYSDOT contract D265401 bid tabulation

Drainage Improvements Various Locations Suffolk County. Let by New York State DOT on March 27, 2025, Suffolk, Region 10. 7 bids received; low bid $12,050,000 by Bove Industries Inc.

Owner
New York State DOT
Letting
27 MAR 2025
Pay items
178
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bove Industries Inc$12,050,000Low
2Pratt Brothers Inc$13,896,903+15%
3Peter Scalamandre & Sons Inc$16,657,713+38%
4G & M Earth Moving Inc$18,549,000+54%
5H & L Contracting LLC$19,470,000+62%
6Grace Industries LLC$21,040,653+75%
7Citnalta Construction Corp$22,926,000+90%
NYSDOT contract D265401: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bove Industries Inc2. Pratt Brothers Inc3. Peter Scalamandre & Sons Inc4. G & M Earth Moving Inc5. H & L Contracting LLC6. Grace Industries LLC
1Clearing and Grubbing (201.07)ACRE3$10,000$30,000$100,000$26,000$15,000$44,300
2Unclassified Excavation and Disposal (203.02)CY26,000$80.00$36.00$15.00$35.00$65.00$76.00
3 (203.02020010)5,000$20.00$59.00$25.00$169.00$64.20$120.00
4Embankment In Place (203.03)CY8,200$1.00$8.00$2.50$5.00$4.00$32.00
5Select Granular Fill (203.07)CY10,300$1.00$15.00$3.00$35.00$1.00$46.00
6 (205.0201)LS1$3,500.00$35,000$5,000.00$5,500.00$25,000$68,300
7Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR4$175.00$600.00$1,550.00$155.00$237.50$1,000.00
8Petroleum Contamination Parameter Analysis (205.0401)EACH4$325.00$1,500.00$2,800.00$1,320.00$275.00$2,500.00
9Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH4$878.00$1,500.00$2,550.00$1,320.00$745.00$750.00
10Laboratory Analysis for Ignitability (205.0403)EACH4$41.00$1,500.00$1,850.00$1,320.00$35.00$650.00
11Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405)EACH4$112.00$1,500.00$1,900.00$1,320.00$95.00$900.00
12Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH4$112.00$1,500.00$1,900.00$1,320.00$95.00$500.00
13Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH4$112.00$1,500.00$1,900.00$1,320.00$95.00$500.00
14 (205.050101)TON75$300.00$350.00$600.00$398.00$200.00$425.00
15 (205.050201)TON75$75.00$95.00$250.00$195.00$100.00$350.00
16Trench and Culvert Excavation (206.0201)CY25,800$1.00$9.00$1.00$0.50$10.00$32.00
17Conduit Excavation and Backfill including Surface Restoration (206.03)LF100$25.00$150.00$30.00$130.00$100.00$195.00
18 (206.03100010)110$100.00$110.00$30.00$136.00$100.00$245.00
19Geotextile Bedding (207.20)SY858$2.00$8.00$5.00$4.00$6.00$5.00
20 (209.11010024)14$600.00$195.00$350.00$250.00$500.00$364.00
21Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY4,046$1.00$9.00$10.00$6.00$6.00$8.00
22 (209.20120010)2,251$6.00$25.00$10.00$50.00$48.00$31.00
23Stabilized Construction Access (209.22)SY177$50.00$20.00$35.00$182.00$34.03$92.00
24 (304.10119917)1,355$100.00$150.00$125.00$109.00$95.00$133.00
25 (404.0001)TON498$125.00$125.00$125.00$125.00$125.00$125.00
26 (404.0981)TON1,878$155.00$195.00$350.00$192.00$205.00$202.00
27 (404.1989)TON2,692$150.00$160.00$285.00$185.00$205.00$158.00
28 (404.2589)TON5,384$105.00$140.00$285.00$190.00$205.00$152.00
29Diluted Tack Coat (407.0102)GAL972$50.00$12.00$11.00$35.00$10.00$5.00
30Asphalt Pavement Joint Adhesive (418.7603)LF23,005$1.00$2.00$1.10$2.00$2.00$0.65
31Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY734$75.00$20.00$75.00$30.00$37.00$17.00
32 (520.05000010)464$5.00$5.50$5.50$6.00$5.50$7.50
33 (520.09000010)16,000$3.00$3.00$3.25$3.00$3.00$4.00
34Temporary Timber Sheeting (552.12)SF40,800$0.15$7.00$0.25$0.50$1.00$6.50
35Temporary Steel Sheeting (552.13)SF29,500$0.25$15.00$5.00$1.00$1.00$30.00
36Shields and Shoring (552.17)SF144,700$0.50$0.60$0.15$0.50$0.40$0.95
37Concrete for Structures, Performance (555.0021)CY2$3,500.00$4,000.00$4,500.00$4,200.00$3,500.00$2,743.00
38Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00$10.00
39 (603.6002)LF2,780$125.00$100.00$200.00$166.00$200.00$141.00
40 (603.6003)LF1,937$148.00$111.00$225.00$187.00$145.00$143.00
41 (603.6005)LF2,649$154.00$180.00$250.00$198.00$260.00$198.00
42 (603.6007)LF343$220.00$265.00$575.00$768.00$480.00$254.00
43 (603.6009)LF1,888$250.00$255.00$350.00$477.00$400.00$313.00
44 (603.6107)LF132$600.00$785.00$1,250.00$2,186.00$1,450.00$555.00
45 (603.6109)LF1,706$400.00$340.00$450.00$620.00$750.00$391.00
46 (603.6110)LF110$1,000.00$625.00$1,200.00$620.00$2,000.00$827.00
47 (603.6111)LF245$575.00$625.00$1,550.00$2,238.00$1,650.00$674.00
48 (603.6112)LF222$750.00$625.00$1,750.00$622.00$750.00$702.00
49 (603.7310)EACH1$8,500.00$20,000$15,000$12,000$15,000$9,068.00
50 (603.7312)EACH1$13,000$30,000$17,500$15,000$20,000$12,400
51 (604.07200110)2$700.00$1,200.00$1,200.00$2,200.00$3,500.00$2,686.00
52 (604.07210110)2$700.00$1,200.00$600.00$2,200.00$3,500.00$751.00
53 (604.07240110)2$5,000.00$5,000.00$4,000.00$4,300.00$5,000.00$2,012.00
54 (604.501011)LF71$1,200.00$1,500.00$1,000.00$2,200.00$1,850.00$1,557.00
55 (604.501012)LF155$1,200.00$1,300.00$800.00$1,700.00$1,950.00$1,528.00
56 (604.501013)LF189$1,100.00$1,500.00$1,000.00$1,975.00$2,600.00$1,437.00
57 (604.501014)LF13$1,250.00$1,800.00$1,100.00$3,000.00$2,200.00$2,160.00
58 (604.501015)LF25$1,100.00$2,500.00$1,250.00$2,600.00$2,400.00$2,293.00
59 (604.501016)LF55$1,400.00$2,750.00$1,500.00$3,700.00$3,400.00$2,297.00
60 (604.501023)LF12$1,100.00$2,200.00$2,000.00$2,800.00$1,800.00$4,000.00
61 (604.501024)LF15$1,100.00$1,625.00$1,250.00$2,352.00$1,100.00$2,340.00
62 (604.501025)LF38$1,200.00$2,300.00$1,500.00$2,828.00$3,000.00$2,631.00
63HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH1$10,000$7,500.00$10,500$8,250.00$7,000.00$11,700
64HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF13$100.00$130.00$105.00$143.00$130.00$100.00
65Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH1$5,000.00$6,000.00$6,500.00$6,600.00$5,500.00$11,000
66HPBO (Mod.) Corrugated Beam Median Barrier (606.2801)LF63$100.00$100.00$105.00$110.00$100.00$166.00
67Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier (606.2802)EACH2$5,000.00$7,250.00$6,500.00$8,000.00$6,250.00$14,000
68Removing and Disposing Corrugated Beam Guide Railing (606.71)LF50$30.00$100.00$40.00$110.00$100.00$59.00
69Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101)LF130$18.00$50.00$50.00$55.00$50.00$43.00
70Removing and Disposing Corrugated Beam Median Barrier (606.72)LF163$15.00$50.00$55.00$55.00$50.00$46.00
71Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH4$500.00$650.00$500.00$700.00$650.00$1,116.00
72Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941)EACH2$550.00$650.00$500.00$700.00$650.00$1,151.00
73Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Weak Post Corrugated Beam Median Barrier (606.8905)EACH2$20,000$9,000.00$22,000$10,000$8,500.00$8,286.00
74 (607.0522)LF1,899$70.00$75.00$105.00$80.00$65.00$111.00
75 (607.1661)EACH2$10,000$3,850.00$25,000$3,500.00$3,000.00$5,291.00
76Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT18$125.00$125.00$125.00$125.00$125.00$125.00
77Concrete Sidewalks and Driveways (608.0101)CY20$950.00$1,350.00$1,000.00$1,200.00$800.00$1,744.00
78 (608.01050010)10$950.00$1,325.00$975.00$1,000.00$800.00$1,296.00
79 (608.01050109)6$8,500.00$5,900.00$5,000.00$16,000$5,100.00$6,618.00
80 (608.01050309)1$9,200.00$9,000.00$8,000.00$16,000$9,300.00$10,200
81Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON360$115.00$350.00$350.00$400.00$325.00$391.00
82 (609.04010510)272$75.00$56.00$42.50$38.00$32.00$55.00
83 (609.04070510)10,975$25.00$56.00$45.00$30.00$35.60$55.00
84Mycorrhizal Fungi (610.0701)LB145$25.00$25.00$25.00$20.00$18.00$24.00
85Moisture Retention Additive (610.08)LB48$25.00$25.00$25.00$12.00$11.00$15.00
86Topsoil - Roadside (610.1402)CY1,177$80.00$79.00$80.00$96.00$88.00$117.00
87Turf Establishment - Roadside (610.1601)SY7,624$3.00$4.00$4.00$4.00$3.80$5.00
88Wildflower Seeding (610.17)SY4,046$4.00$5.00$5.00$4.00$3.80$5.00
89Watering Vegetation (610.19)1,000 GALLONS119$0.01$200.00$225.00$100.00$92.00$122.00
90 (611.0201)EACH4$750.00$750.00$750.00$935.00$850.00$1,131.00
91 (611.0361)EACH26$650.00$650.00$650.00$643.00$585.00$779.00
92 (611.0441)EACH112$65.00$65.00$65.00$88.00$80.00$106.00
93 (611.0451)EACH161$75.00$75.00$75.00$107.00$98.00$130.00
94 (611.0561)EACH444$85.00$85.00$85.00$121.00$110.00$146.00
95Post-Planting Care (611.19)EACH672$1.00$10.00$1.00$30.00$28.00$37.00
96 (611.19020024)1$1.00$10.00$1.00$52.00$48.00$64.00
97 (611.19030024)5$1.00$10.00$1.00$23.00$21.00$28.00
98 (611.19040024)55$1.00$10.00$1.00$9.00$8.00$11.00
99 (611.19050024)89$1.00$10.00$1.00$9.00$8.00$11.00
100 (614.060202)EACH14$265.00$550.00$650.00$500.00$450.00$599.00
101 (617.01010024)78$5.00$5.00$5.50$45.00$40.00$53.00
102 (617.11000024)LS1$1,000.00$1,200.00$1,500.00$900.00$780.00$1,038.00
103Basic Work Zone Traffic Control (619.01)LS1$273,868$475,000$634,360$997,678$2,399,642$1,447,021
104Type III Construction Barricades (619.04)EACH1,904$4.00$20.00$60.00$35.00$1.00$361.00
105 (619.080101)LF26,363$1.00$1.80$1.50$2.00$1.50$2.00
106 (619.100102)LF51,232$0.75$0.80$0.68$1.00$0.68$0.90
107 (619.111133)EACH2$30,000$30,000$30,000$20,000$38,000$33,100
108Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH7$179.00$195.00$179.00$200.00$179.00$238.00
109Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF10,250$60.00$33.00$25.00$145.00$90.00$75.00
110Warning Lights on Temporary Positive Barriers (619.1719)EACH518$25.00$135.00$15.00$25.00$126.89$73.00
111Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH21$6,000.00$7,000.00$7,500.00$11,000$11,000$9,539.00
112Nighttime Operations (Entire Project) (619.24)LS1$40,000$95,000$100,000$404,728$95,000$88,900
113Traffic Control Supervisor (619.25)MONTH20$10.00$1,000.00$25,000$4,500.00$150.00$23,800
114Stone Filling (Light) (620.03)CY138$300.00$225.00$175.00$175.00$280.00$353.00
115Cleaning Closed Drainage Systems (621.03)LF200$20.00$8.00$16.00$30.00$15.00$67.00
116Cleaning Drainage Structures (621.04)EACH5$800.00$1,500.00$750.00$1,600.00$1,500.00$998.00
117Asphalt Gutter (624.020101)TON360$105.00$385.00$300.00$385.00$340.00$562.00
118Survey Operations (625.01)LS1$169,220$125,000$1,000,000$90,000$475,000$433,000
119 (625.09010015)LS1$4,000.00$40,000$18,000$5,500.00$15,000$37,100
120Concrete Cylinder Curing Equipment (637.04)EACH1$4,500.00$1,000.00$5,000.00$500.00$3,500.00$3,361.00
121Engineer’s Field Office – Type 3 (637.13)MONTH23$8,000.00$6,000.00$10,000$4,800.00$6,000.00$11,300
122Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
123Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
124Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
125 (645.03030015)2$4,000.00$3,950.00$4,500.00$4,000.00$3,950.00$4,725.00
126Ground-Mounted Sign Panels without Z-bars (645.5101)SF8$80.00$82.50$85.00$90.00$82.50$100.00
127Type A Sign Posts (645.81)EACH13$300.00$325.00$300.00$350.00$325.00$499.00
128Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH13$400.00$225.00$425.00$250.00$225.00$632.00
129Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH1$500.00$75.00$550.00$80.00$75.00$200.00
130Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64)EACH14$500.00$50.00$525.00$55.00$50.00$399.00
131 (655.07030010)71$1,250.00$2,300.00$2,250.00$1,500.00$2,400.00$1,754.00
132Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH1$1,550.00$2,500.00$2,500.00$1,700.00$2,800.00$1,967.00
133Manhole Frame & Cover (655.1202)EACH7$515.00$1,050.00$1,000.00$600.00$770.00$590.00
134 (663.0104)LF40$360.00$560.00$510.00$840.00$510.00$433.00
135 (663.0106)LF50$280.00$340.00$520.00$1,200.00$310.00$473.00
136 (663.0108)LF120$315.00$555.00$600.00$1,600.00$510.00$492.00
137 (663.0110)LF80$330.00$495.00$625.00$900.00$450.00$512.00
138 (663.0112)LF200$350.00$500.00$650.00$1,900.00$460.00$592.00
139 (663.0606)LF135$200.00$300.00$200.00$340.00$300.00$113.00
140 (663.0607)LF160$175.00$310.00$210.00$310.00$309.00$126.00
141 (663.1006)EACH1$2,000.00$4,300.00$4,250.00$1,600.00$4,200.00$6,655.00
142 (663.1301)EACH1$8,000.00$14,000$12,500$15,000$14,000$20,000
143Iron Water Main Fittings (3 - 8 inch diameter) (663.2001)LB941$8.00$32.00$12.50$7.00$30.00$21.00
144Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB2,990$6.00$33.00$14.00$7.00$32.00$22.00
145 (663.2104)EACH10$60.00$90.00$80.00$65.00$90.00$306.00
146 (663.2106)EACH10$75.00$110.00$110.00$82.00$110.00$333.00
147 (663.2108)EACH30$102.00$150.00$140.00$110.00$150.00$366.00
148 (663.2110)EACH20$145.00$215.00$200.00$160.00$215.00$399.00
149 (663.2112)EACH50$195.00$285.00$250.00$215.00$285.00$532.00
150 (663.2506)EACH2$1,500.00$2,300.00$3,300.00$130.00$2,300.00$12,000
151 (663.2507)EACH2$1,500.00$2,500.00$4,500.00$130.00$2,500.00$13,300
152 (663.2606)EACH2$1,400.00$1,600.00$2,500.00$700.00$1,600.00$666.00
153 (663.2607)EACH2$1,400.00$1,800.00$5,000.00$1,000.00$1,800.00$1,198.00
154Remove and Dispose of Existing Water Valve & Valve Box (663.42)EACH1$300.00$950.00$275.00$550.00$700.00$666.00
155Remove and Dispose of Existing Hydrant (663.43)EACH1$650.00$1,200.00$1,050.00$11,000$700.00$3,328.00
156 (670.7002)LF300$9.30$9.30$9.30$10.00$9.30$12.00
157 (670.75020011)100$6.70$8.00$6.70$8.00$6.70$9.00
158 (680.51100010)6$175.00$350.00$100.00$800.00$550.00$666.00
159 (680.51111010)2$5,500.00$940.00$1,000.00$1,000.00$940.00$1,251.00
160 (680.520108)LF110$110.20$110.00$110.00$120.00$110.20$147.00
161 (680.520203)LF58$9.00$58.00$9.50$10.00$9.10$12.00
162 (680.53010010)574$3.50$3.40$3.50$25.00$3.40$4.50
163Inductance Loop Installation (680.54)LF1,038$27.00$26.90$28.00$30.00$26.90$36.00
164Shielded Lead-in Cable (680.71)LF693$3.00$3.00$3.15$3.00$3.00$4.00
165Inductance Loop Wire (680.72)LF4,350$1.30$1.30$1.35$2.00$1.30$1.50
166 (680.78010005)4$350.00$750.00$300.00$2,750.00$250.00$333.00
167 (680.83200010)LS1$5,800.00$25,000$7,250.00$30,000$15,000$79,900
168 (685.07200110)31,886$1.00$0.70$0.68$1.00$0.68$0.90
169 (685.07200310)55$185.00$185.00$185.00$200.00$185.00$246.00
170 (685.07200410)805$2.00$1.95$1.95$2.00$1.95$2.50
171 (685.07200510)2,820$2.25$2.30$2.30$2.00$2.29$3.00
172 (685.07200610)14,310$0.50$0.70$0.68$1.00$0.68$0.90
173 (691.04000020)84,000$1.00$1.00$1.00$1.00$1.00$1.00
174Field Change Payment (FCP) (697.03)DOL850,000$1.00$1.00$1.00$1.00$1.00$1.00
175Asphalt Price Adjustment (698.04)DOL24,496$1.00$1.00$1.00$1.00$1.00$1.00
176Fuel Price Adjustment (698.05)DOL6,834$1.00$1.00$1.00$1.00$1.00$1.00
177Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
178Mobilization (699.040001)LS1$460,000$520,000$640,680$500,000$730,000$800,000
NYSDOT contract D265401: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way