Drainage Improvements Various Locations Suffolk County. Let by New York State DOT on March 27, 2025, Suffolk, Region 10. 7 bids received; low bid $12,050,000 by Bove Industries Inc.
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 178
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bove Industries Inc | $12,050,000 | Low |
| 2 | Pratt Brothers Inc | $13,896,903 | +15% |
| 3 | Peter Scalamandre & Sons Inc | $16,657,713 | +38% |
| 4 | G & M Earth Moving Inc | $18,549,000 | +54% |
| 5 | H & L Contracting LLC | $19,470,000 | +62% |
| 6 | Grace Industries LLC | $21,040,653 | +75% |
| 7 | Citnalta Construction Corp | $22,926,000 | +90% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bove Industries Inc | 2. Pratt Brothers Inc | 3. Peter Scalamandre & Sons Inc | 4. G & M Earth Moving Inc | 5. H & L Contracting LLC | 6. Grace Industries LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 3 | $10,000 | $30,000 | $100,000 | $26,000 | $15,000 | $44,300 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 26,000 | $80.00 | $36.00 | $15.00 | $35.00 | $65.00 | $76.00 |
| 3 | (203.02020010) | 5,000 | $20.00 | $59.00 | $25.00 | $169.00 | $64.20 | $120.00 | |
| 4 | Embankment In Place (203.03) | CY | 8,200 | $1.00 | $8.00 | $2.50 | $5.00 | $4.00 | $32.00 |
| 5 | Select Granular Fill (203.07) | CY | 10,300 | $1.00 | $15.00 | $3.00 | $35.00 | $1.00 | $46.00 |
| 6 | (205.0201) | LS | 1 | $3,500.00 | $35,000 | $5,000.00 | $5,500.00 | $25,000 | $68,300 |
| 7 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 4 | $175.00 | $600.00 | $1,550.00 | $155.00 | $237.50 | $1,000.00 |
| 8 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 4 | $325.00 | $1,500.00 | $2,800.00 | $1,320.00 | $275.00 | $2,500.00 |
| 9 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 4 | $878.00 | $1,500.00 | $2,550.00 | $1,320.00 | $745.00 | $750.00 |
| 10 | Laboratory Analysis for Ignitability (205.0403) | EACH | 4 | $41.00 | $1,500.00 | $1,850.00 | $1,320.00 | $35.00 | $650.00 |
| 11 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 4 | $112.00 | $1,500.00 | $1,900.00 | $1,320.00 | $95.00 | $900.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 4 | $112.00 | $1,500.00 | $1,900.00 | $1,320.00 | $95.00 | $500.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 4 | $112.00 | $1,500.00 | $1,900.00 | $1,320.00 | $95.00 | $500.00 |
| 14 | (205.050101) | TON | 75 | $300.00 | $350.00 | $600.00 | $398.00 | $200.00 | $425.00 |
| 15 | (205.050201) | TON | 75 | $75.00 | $95.00 | $250.00 | $195.00 | $100.00 | $350.00 |
| 16 | Trench and Culvert Excavation (206.0201) | CY | 25,800 | $1.00 | $9.00 | $1.00 | $0.50 | $10.00 | $32.00 |
| 17 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 100 | $25.00 | $150.00 | $30.00 | $130.00 | $100.00 | $195.00 |
| 18 | (206.03100010) | 110 | $100.00 | $110.00 | $30.00 | $136.00 | $100.00 | $245.00 | |
| 19 | Geotextile Bedding (207.20) | SY | 858 | $2.00 | $8.00 | $5.00 | $4.00 | $6.00 | $5.00 |
| 20 | (209.11010024) | 14 | $600.00 | $195.00 | $350.00 | $250.00 | $500.00 | $364.00 | |
| 21 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 4,046 | $1.00 | $9.00 | $10.00 | $6.00 | $6.00 | $8.00 |
| 22 | (209.20120010) | 2,251 | $6.00 | $25.00 | $10.00 | $50.00 | $48.00 | $31.00 | |
| 23 | Stabilized Construction Access (209.22) | SY | 177 | $50.00 | $20.00 | $35.00 | $182.00 | $34.03 | $92.00 |
| 24 | (304.10119917) | 1,355 | $100.00 | $150.00 | $125.00 | $109.00 | $95.00 | $133.00 | |
| 25 | (404.0001) | TON | 498 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 26 | (404.0981) | TON | 1,878 | $155.00 | $195.00 | $350.00 | $192.00 | $205.00 | $202.00 |
| 27 | (404.1989) | TON | 2,692 | $150.00 | $160.00 | $285.00 | $185.00 | $205.00 | $158.00 |
| 28 | (404.2589) | TON | 5,384 | $105.00 | $140.00 | $285.00 | $190.00 | $205.00 | $152.00 |
| 29 | Diluted Tack Coat (407.0102) | GAL | 972 | $50.00 | $12.00 | $11.00 | $35.00 | $10.00 | $5.00 |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 23,005 | $1.00 | $2.00 | $1.10 | $2.00 | $2.00 | $0.65 |
| 31 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 734 | $75.00 | $20.00 | $75.00 | $30.00 | $37.00 | $17.00 |
| 32 | (520.05000010) | 464 | $5.00 | $5.50 | $5.50 | $6.00 | $5.50 | $7.50 | |
| 33 | (520.09000010) | 16,000 | $3.00 | $3.00 | $3.25 | $3.00 | $3.00 | $4.00 | |
| 34 | Temporary Timber Sheeting (552.12) | SF | 40,800 | $0.15 | $7.00 | $0.25 | $0.50 | $1.00 | $6.50 |
| 35 | Temporary Steel Sheeting (552.13) | SF | 29,500 | $0.25 | $15.00 | $5.00 | $1.00 | $1.00 | $30.00 |
| 36 | Shields and Shoring (552.17) | SF | 144,700 | $0.50 | $0.60 | $0.15 | $0.50 | $0.40 | $0.95 |
| 37 | Concrete for Structures, Performance (555.0021) | CY | 2 | $3,500.00 | $4,000.00 | $4,500.00 | $4,200.00 | $3,500.00 | $2,743.00 |
| 38 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 39 | (603.6002) | LF | 2,780 | $125.00 | $100.00 | $200.00 | $166.00 | $200.00 | $141.00 |
| 40 | (603.6003) | LF | 1,937 | $148.00 | $111.00 | $225.00 | $187.00 | $145.00 | $143.00 |
| 41 | (603.6005) | LF | 2,649 | $154.00 | $180.00 | $250.00 | $198.00 | $260.00 | $198.00 |
| 42 | (603.6007) | LF | 343 | $220.00 | $265.00 | $575.00 | $768.00 | $480.00 | $254.00 |
| 43 | (603.6009) | LF | 1,888 | $250.00 | $255.00 | $350.00 | $477.00 | $400.00 | $313.00 |
| 44 | (603.6107) | LF | 132 | $600.00 | $785.00 | $1,250.00 | $2,186.00 | $1,450.00 | $555.00 |
| 45 | (603.6109) | LF | 1,706 | $400.00 | $340.00 | $450.00 | $620.00 | $750.00 | $391.00 |
| 46 | (603.6110) | LF | 110 | $1,000.00 | $625.00 | $1,200.00 | $620.00 | $2,000.00 | $827.00 |
| 47 | (603.6111) | LF | 245 | $575.00 | $625.00 | $1,550.00 | $2,238.00 | $1,650.00 | $674.00 |
| 48 | (603.6112) | LF | 222 | $750.00 | $625.00 | $1,750.00 | $622.00 | $750.00 | $702.00 |
| 49 | (603.7310) | EACH | 1 | $8,500.00 | $20,000 | $15,000 | $12,000 | $15,000 | $9,068.00 |
| 50 | (603.7312) | EACH | 1 | $13,000 | $30,000 | $17,500 | $15,000 | $20,000 | $12,400 |
| 51 | (604.07200110) | 2 | $700.00 | $1,200.00 | $1,200.00 | $2,200.00 | $3,500.00 | $2,686.00 | |
| 52 | (604.07210110) | 2 | $700.00 | $1,200.00 | $600.00 | $2,200.00 | $3,500.00 | $751.00 | |
| 53 | (604.07240110) | 2 | $5,000.00 | $5,000.00 | $4,000.00 | $4,300.00 | $5,000.00 | $2,012.00 | |
| 54 | (604.501011) | LF | 71 | $1,200.00 | $1,500.00 | $1,000.00 | $2,200.00 | $1,850.00 | $1,557.00 |
| 55 | (604.501012) | LF | 155 | $1,200.00 | $1,300.00 | $800.00 | $1,700.00 | $1,950.00 | $1,528.00 |
| 56 | (604.501013) | LF | 189 | $1,100.00 | $1,500.00 | $1,000.00 | $1,975.00 | $2,600.00 | $1,437.00 |
| 57 | (604.501014) | LF | 13 | $1,250.00 | $1,800.00 | $1,100.00 | $3,000.00 | $2,200.00 | $2,160.00 |
| 58 | (604.501015) | LF | 25 | $1,100.00 | $2,500.00 | $1,250.00 | $2,600.00 | $2,400.00 | $2,293.00 |
| 59 | (604.501016) | LF | 55 | $1,400.00 | $2,750.00 | $1,500.00 | $3,700.00 | $3,400.00 | $2,297.00 |
| 60 | (604.501023) | LF | 12 | $1,100.00 | $2,200.00 | $2,000.00 | $2,800.00 | $1,800.00 | $4,000.00 |
| 61 | (604.501024) | LF | 15 | $1,100.00 | $1,625.00 | $1,250.00 | $2,352.00 | $1,100.00 | $2,340.00 |
| 62 | (604.501025) | LF | 38 | $1,200.00 | $2,300.00 | $1,500.00 | $2,828.00 | $3,000.00 | $2,631.00 |
| 63 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 1 | $10,000 | $7,500.00 | $10,500 | $8,250.00 | $7,000.00 | $11,700 |
| 64 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 13 | $100.00 | $130.00 | $105.00 | $143.00 | $130.00 | $100.00 |
| 65 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 1 | $5,000.00 | $6,000.00 | $6,500.00 | $6,600.00 | $5,500.00 | $11,000 |
| 66 | HPBO (Mod.) Corrugated Beam Median Barrier (606.2801) | LF | 63 | $100.00 | $100.00 | $105.00 | $110.00 | $100.00 | $166.00 |
| 67 | Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier (606.2802) | EACH | 2 | $5,000.00 | $7,250.00 | $6,500.00 | $8,000.00 | $6,250.00 | $14,000 |
| 68 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 50 | $30.00 | $100.00 | $40.00 | $110.00 | $100.00 | $59.00 |
| 69 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 130 | $18.00 | $50.00 | $50.00 | $55.00 | $50.00 | $43.00 |
| 70 | Removing and Disposing Corrugated Beam Median Barrier (606.72) | LF | 163 | $15.00 | $50.00 | $55.00 | $55.00 | $50.00 | $46.00 |
| 71 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $500.00 | $650.00 | $500.00 | $700.00 | $650.00 | $1,116.00 |
| 72 | Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941) | EACH | 2 | $550.00 | $650.00 | $500.00 | $700.00 | $650.00 | $1,151.00 |
| 73 | Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Weak Post Corrugated Beam Median Barrier (606.8905) | EACH | 2 | $20,000 | $9,000.00 | $22,000 | $10,000 | $8,500.00 | $8,286.00 |
| 74 | (607.0522) | LF | 1,899 | $70.00 | $75.00 | $105.00 | $80.00 | $65.00 | $111.00 |
| 75 | (607.1661) | EACH | 2 | $10,000 | $3,850.00 | $25,000 | $3,500.00 | $3,000.00 | $5,291.00 |
| 76 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 18 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 77 | Concrete Sidewalks and Driveways (608.0101) | CY | 20 | $950.00 | $1,350.00 | $1,000.00 | $1,200.00 | $800.00 | $1,744.00 |
| 78 | (608.01050010) | 10 | $950.00 | $1,325.00 | $975.00 | $1,000.00 | $800.00 | $1,296.00 | |
| 79 | (608.01050109) | 6 | $8,500.00 | $5,900.00 | $5,000.00 | $16,000 | $5,100.00 | $6,618.00 | |
| 80 | (608.01050309) | 1 | $9,200.00 | $9,000.00 | $8,000.00 | $16,000 | $9,300.00 | $10,200 | |
| 81 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 360 | $115.00 | $350.00 | $350.00 | $400.00 | $325.00 | $391.00 |
| 82 | (609.04010510) | 272 | $75.00 | $56.00 | $42.50 | $38.00 | $32.00 | $55.00 | |
| 83 | (609.04070510) | 10,975 | $25.00 | $56.00 | $45.00 | $30.00 | $35.60 | $55.00 | |
| 84 | Mycorrhizal Fungi (610.0701) | LB | 145 | $25.00 | $25.00 | $25.00 | $20.00 | $18.00 | $24.00 |
| 85 | Moisture Retention Additive (610.08) | LB | 48 | $25.00 | $25.00 | $25.00 | $12.00 | $11.00 | $15.00 |
| 86 | Topsoil - Roadside (610.1402) | CY | 1,177 | $80.00 | $79.00 | $80.00 | $96.00 | $88.00 | $117.00 |
| 87 | Turf Establishment - Roadside (610.1601) | SY | 7,624 | $3.00 | $4.00 | $4.00 | $4.00 | $3.80 | $5.00 |
| 88 | Wildflower Seeding (610.17) | SY | 4,046 | $4.00 | $5.00 | $5.00 | $4.00 | $3.80 | $5.00 |
| 89 | Watering Vegetation (610.19) | 1,000 GALLONS | 119 | $0.01 | $200.00 | $225.00 | $100.00 | $92.00 | $122.00 |
| 90 | (611.0201) | EACH | 4 | $750.00 | $750.00 | $750.00 | $935.00 | $850.00 | $1,131.00 |
| 91 | (611.0361) | EACH | 26 | $650.00 | $650.00 | $650.00 | $643.00 | $585.00 | $779.00 |
| 92 | (611.0441) | EACH | 112 | $65.00 | $65.00 | $65.00 | $88.00 | $80.00 | $106.00 |
| 93 | (611.0451) | EACH | 161 | $75.00 | $75.00 | $75.00 | $107.00 | $98.00 | $130.00 |
| 94 | (611.0561) | EACH | 444 | $85.00 | $85.00 | $85.00 | $121.00 | $110.00 | $146.00 |
| 95 | Post-Planting Care (611.19) | EACH | 672 | $1.00 | $10.00 | $1.00 | $30.00 | $28.00 | $37.00 |
| 96 | (611.19020024) | 1 | $1.00 | $10.00 | $1.00 | $52.00 | $48.00 | $64.00 | |
| 97 | (611.19030024) | 5 | $1.00 | $10.00 | $1.00 | $23.00 | $21.00 | $28.00 | |
| 98 | (611.19040024) | 55 | $1.00 | $10.00 | $1.00 | $9.00 | $8.00 | $11.00 | |
| 99 | (611.19050024) | 89 | $1.00 | $10.00 | $1.00 | $9.00 | $8.00 | $11.00 | |
| 100 | (614.060202) | EACH | 14 | $265.00 | $550.00 | $650.00 | $500.00 | $450.00 | $599.00 |
| 101 | (617.01010024) | 78 | $5.00 | $5.00 | $5.50 | $45.00 | $40.00 | $53.00 | |
| 102 | (617.11000024) | LS | 1 | $1,000.00 | $1,200.00 | $1,500.00 | $900.00 | $780.00 | $1,038.00 |
| 103 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $273,868 | $475,000 | $634,360 | $997,678 | $2,399,642 | $1,447,021 |
| 104 | Type III Construction Barricades (619.04) | EACH | 1,904 | $4.00 | $20.00 | $60.00 | $35.00 | $1.00 | $361.00 |
| 105 | (619.080101) | LF | 26,363 | $1.00 | $1.80 | $1.50 | $2.00 | $1.50 | $2.00 |
| 106 | (619.100102) | LF | 51,232 | $0.75 | $0.80 | $0.68 | $1.00 | $0.68 | $0.90 |
| 107 | (619.111133) | EACH | 2 | $30,000 | $30,000 | $30,000 | $20,000 | $38,000 | $33,100 |
| 108 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 7 | $179.00 | $195.00 | $179.00 | $200.00 | $179.00 | $238.00 |
| 109 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 10,250 | $60.00 | $33.00 | $25.00 | $145.00 | $90.00 | $75.00 |
| 110 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 518 | $25.00 | $135.00 | $15.00 | $25.00 | $126.89 | $73.00 |
| 111 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 21 | $6,000.00 | $7,000.00 | $7,500.00 | $11,000 | $11,000 | $9,539.00 |
| 112 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $40,000 | $95,000 | $100,000 | $404,728 | $95,000 | $88,900 |
| 113 | Traffic Control Supervisor (619.25) | MONTH | 20 | $10.00 | $1,000.00 | $25,000 | $4,500.00 | $150.00 | $23,800 |
| 114 | Stone Filling (Light) (620.03) | CY | 138 | $300.00 | $225.00 | $175.00 | $175.00 | $280.00 | $353.00 |
| 115 | Cleaning Closed Drainage Systems (621.03) | LF | 200 | $20.00 | $8.00 | $16.00 | $30.00 | $15.00 | $67.00 |
| 116 | Cleaning Drainage Structures (621.04) | EACH | 5 | $800.00 | $1,500.00 | $750.00 | $1,600.00 | $1,500.00 | $998.00 |
| 117 | Asphalt Gutter (624.020101) | TON | 360 | $105.00 | $385.00 | $300.00 | $385.00 | $340.00 | $562.00 |
| 118 | Survey Operations (625.01) | LS | 1 | $169,220 | $125,000 | $1,000,000 | $90,000 | $475,000 | $433,000 |
| 119 | (625.09010015) | LS | 1 | $4,000.00 | $40,000 | $18,000 | $5,500.00 | $15,000 | $37,100 |
| 120 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,500.00 | $1,000.00 | $5,000.00 | $500.00 | $3,500.00 | $3,361.00 |
| 121 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 23 | $8,000.00 | $6,000.00 | $10,000 | $4,800.00 | $6,000.00 | $11,300 |
| 122 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | (645.03030015) | 2 | $4,000.00 | $3,950.00 | $4,500.00 | $4,000.00 | $3,950.00 | $4,725.00 | |
| 126 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 8 | $80.00 | $82.50 | $85.00 | $90.00 | $82.50 | $100.00 |
| 127 | Type A Sign Posts (645.81) | EACH | 13 | $300.00 | $325.00 | $300.00 | $350.00 | $325.00 | $499.00 |
| 128 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 13 | $400.00 | $225.00 | $425.00 | $250.00 | $225.00 | $632.00 |
| 129 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $500.00 | $75.00 | $550.00 | $80.00 | $75.00 | $200.00 |
| 130 | Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64) | EACH | 14 | $500.00 | $50.00 | $525.00 | $55.00 | $50.00 | $399.00 |
| 131 | (655.07030010) | 71 | $1,250.00 | $2,300.00 | $2,250.00 | $1,500.00 | $2,400.00 | $1,754.00 | |
| 132 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 1 | $1,550.00 | $2,500.00 | $2,500.00 | $1,700.00 | $2,800.00 | $1,967.00 |
| 133 | Manhole Frame & Cover (655.1202) | EACH | 7 | $515.00 | $1,050.00 | $1,000.00 | $600.00 | $770.00 | $590.00 |
| 134 | (663.0104) | LF | 40 | $360.00 | $560.00 | $510.00 | $840.00 | $510.00 | $433.00 |
| 135 | (663.0106) | LF | 50 | $280.00 | $340.00 | $520.00 | $1,200.00 | $310.00 | $473.00 |
| 136 | (663.0108) | LF | 120 | $315.00 | $555.00 | $600.00 | $1,600.00 | $510.00 | $492.00 |
| 137 | (663.0110) | LF | 80 | $330.00 | $495.00 | $625.00 | $900.00 | $450.00 | $512.00 |
| 138 | (663.0112) | LF | 200 | $350.00 | $500.00 | $650.00 | $1,900.00 | $460.00 | $592.00 |
| 139 | (663.0606) | LF | 135 | $200.00 | $300.00 | $200.00 | $340.00 | $300.00 | $113.00 |
| 140 | (663.0607) | LF | 160 | $175.00 | $310.00 | $210.00 | $310.00 | $309.00 | $126.00 |
| 141 | (663.1006) | EACH | 1 | $2,000.00 | $4,300.00 | $4,250.00 | $1,600.00 | $4,200.00 | $6,655.00 |
| 142 | (663.1301) | EACH | 1 | $8,000.00 | $14,000 | $12,500 | $15,000 | $14,000 | $20,000 |
| 143 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 941 | $8.00 | $32.00 | $12.50 | $7.00 | $30.00 | $21.00 |
| 144 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 2,990 | $6.00 | $33.00 | $14.00 | $7.00 | $32.00 | $22.00 |
| 145 | (663.2104) | EACH | 10 | $60.00 | $90.00 | $80.00 | $65.00 | $90.00 | $306.00 |
| 146 | (663.2106) | EACH | 10 | $75.00 | $110.00 | $110.00 | $82.00 | $110.00 | $333.00 |
| 147 | (663.2108) | EACH | 30 | $102.00 | $150.00 | $140.00 | $110.00 | $150.00 | $366.00 |
| 148 | (663.2110) | EACH | 20 | $145.00 | $215.00 | $200.00 | $160.00 | $215.00 | $399.00 |
| 149 | (663.2112) | EACH | 50 | $195.00 | $285.00 | $250.00 | $215.00 | $285.00 | $532.00 |
| 150 | (663.2506) | EACH | 2 | $1,500.00 | $2,300.00 | $3,300.00 | $130.00 | $2,300.00 | $12,000 |
| 151 | (663.2507) | EACH | 2 | $1,500.00 | $2,500.00 | $4,500.00 | $130.00 | $2,500.00 | $13,300 |
| 152 | (663.2606) | EACH | 2 | $1,400.00 | $1,600.00 | $2,500.00 | $700.00 | $1,600.00 | $666.00 |
| 153 | (663.2607) | EACH | 2 | $1,400.00 | $1,800.00 | $5,000.00 | $1,000.00 | $1,800.00 | $1,198.00 |
| 154 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 1 | $300.00 | $950.00 | $275.00 | $550.00 | $700.00 | $666.00 |
| 155 | Remove and Dispose of Existing Hydrant (663.43) | EACH | 1 | $650.00 | $1,200.00 | $1,050.00 | $11,000 | $700.00 | $3,328.00 |
| 156 | (670.7002) | LF | 300 | $9.30 | $9.30 | $9.30 | $10.00 | $9.30 | $12.00 |
| 157 | (670.75020011) | 100 | $6.70 | $8.00 | $6.70 | $8.00 | $6.70 | $9.00 | |
| 158 | (680.51100010) | 6 | $175.00 | $350.00 | $100.00 | $800.00 | $550.00 | $666.00 | |
| 159 | (680.51111010) | 2 | $5,500.00 | $940.00 | $1,000.00 | $1,000.00 | $940.00 | $1,251.00 | |
| 160 | (680.520108) | LF | 110 | $110.20 | $110.00 | $110.00 | $120.00 | $110.20 | $147.00 |
| 161 | (680.520203) | LF | 58 | $9.00 | $58.00 | $9.50 | $10.00 | $9.10 | $12.00 |
| 162 | (680.53010010) | 574 | $3.50 | $3.40 | $3.50 | $25.00 | $3.40 | $4.50 | |
| 163 | Inductance Loop Installation (680.54) | LF | 1,038 | $27.00 | $26.90 | $28.00 | $30.00 | $26.90 | $36.00 |
| 164 | Shielded Lead-in Cable (680.71) | LF | 693 | $3.00 | $3.00 | $3.15 | $3.00 | $3.00 | $4.00 |
| 165 | Inductance Loop Wire (680.72) | LF | 4,350 | $1.30 | $1.30 | $1.35 | $2.00 | $1.30 | $1.50 |
| 166 | (680.78010005) | 4 | $350.00 | $750.00 | $300.00 | $2,750.00 | $250.00 | $333.00 | |
| 167 | (680.83200010) | LS | 1 | $5,800.00 | $25,000 | $7,250.00 | $30,000 | $15,000 | $79,900 |
| 168 | (685.07200110) | 31,886 | $1.00 | $0.70 | $0.68 | $1.00 | $0.68 | $0.90 | |
| 169 | (685.07200310) | 55 | $185.00 | $185.00 | $185.00 | $200.00 | $185.00 | $246.00 | |
| 170 | (685.07200410) | 805 | $2.00 | $1.95 | $1.95 | $2.00 | $1.95 | $2.50 | |
| 171 | (685.07200510) | 2,820 | $2.25 | $2.30 | $2.30 | $2.00 | $2.29 | $3.00 | |
| 172 | (685.07200610) | 14,310 | $0.50 | $0.70 | $0.68 | $1.00 | $0.68 | $0.90 | |
| 173 | (691.04000020) | 84,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 174 | Field Change Payment (FCP) (697.03) | DOL | 850,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 175 | Asphalt Price Adjustment (698.04) | DOL | 24,496 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 176 | Fuel Price Adjustment (698.05) | DOL | 6,834 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 177 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 178 | Mobilization (699.040001) | LS | 1 | $460,000 | $520,000 | $640,680 | $500,000 | $730,000 | $800,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.