NYSDOT contract D265809 bid tabulation
PIN 0050.30 NY 135 Bridge Replace over I-495. Let by New York State DOT on September 17, 2026, Nassau, Region 10. 8 bids received; low bid $36,442,000 by H & L Contracting LLC.
- Owner
- New York State DOT
- Letting
- 17 SEP 2026
- Pay items
- 218
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H & L Contracting LLC | $36,442,000 | Low |
| 2 | Defoe Corporation | $38,831,196 | +7.0% |
| 3 | Grace Industries LLC | $40,181,997 | +10% |
| 4 | Posillico Civil Inc | $43,558,880 | +20% |
| 5 | Tully Construction Company Inc | $44,731,000 | +23% |
| 6 | SPC Construction Co LLC | $46,285,000 | +27% |
| 7 | C.A.C. Industries Inc | $48,600,000 | +33% |
| 8 | Es II Enterprises LLC /DBA El Sol Enterprises | $49,215,000 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H & L Contracting LLC | 2. Defoe Corporation | 3. Grace Industries LLC | 4. Posillico Civil Inc | 5. Tully Construction Company Inc | 6. SPC Construction Co LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 1 | $50,000 | $25,000 | $40,077 | $250,000 | $186,000 | $300,000 |
| 2 | (202.120001) | LS | 1 | $1,450,000 | $1,455,000 | $975,000 | $6,345,000 | $2,651,291 | $1,250,000 |
| 3 | (202.120002) | LS | 1 | $950,000 | $1,455,000 | $1,000,000 | $2,950,000 | $2,200,000 | $850,000 |
| 4 | Removal of Substructures (202.19) | CY | 2,035 | $275.00 | $400.00 | $363.00 | $650.00 | $850.00 | $550.00 |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 9,804 | $2.00 | $150.00 | $145.00 | $70.00 | $188.00 | $175.00 |
| 6 | Embankment In Place (203.03) | CY | 5,313 | $165.00 | $60.00 | $75.00 | $38.00 | $100.00 | $45.00 |
| 7 | Select Granular Fill (203.07) | CY | 115 | $65.00 | $77.00 | $39.00 | $70.00 | $42.00 | $150.00 |
| 8 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 130 | $500.00 | $129.00 | $189.00 | $200.00 | $375.00 | $134.00 |
| 9 | Select Structural Fill (203.21) | CY | 995 | $60.00 | $90.00 | $148.00 | $95.00 | $121.00 | $120.00 |
| 10 | (203.24010017) | 251 | $250.00 | $117.00 | $424.00 | $100.00 | $730.00 | $100.00 | |
| 11 | Structure Excavation (206.01) | CY | 12,335 | $60.00 | $98.00 | $80.00 | $45.00 | $93.00 | $95.00 |
| 12 | Trench and Culvert Excavation (206.0201) | CY | 175 | $100.00 | $64.00 | $70.00 | $1.00 | $400.00 | $275.00 |
| 13 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 1,960 | $35.00 | $41.00 | $25.00 | $24.00 | $40.00 | $70.00 |
| 14 | Geotextile Bedding (207.20) | SY | 48 | $3.00 | $30.00 | $17.00 | $4.00 | $32.00 | $40.00 |
| 15 | Prefabricated Composite Structural Drain (207.26) | SY | 182 | $65.00 | $43.00 | $13.00 | $70.00 | $11.00 | $60.00 |
| 16 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 513 | $12.00 | $39.00 | $16.00 | $35.00 | $11.00 | $40.00 |
| 17 | Mulch – Temporary (209.100101) | SY | 5,600 | $2.80 | $2.10 | $3.70 | $2.80 | $7.00 | $2.83 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 1,400 | $2.90 | $3.15 | $3.80 | $2.90 | $3.45 | $2.93 |
| 19 | Silt Fence - Temporary (209.13) | LF | 200 | $10.00 | $45.00 | $21.00 | $50.00 | $320.00 | $18.02 |
| 20 | Drainage Structure Inlet Protection, Catch Basin Inserts for Trash, Sediment and Debris Removal – Temporary (209.1706) | EACH | 28 | $460.00 | $550.00 | $450.00 | $700.00 | $600.00 | $900.00 |
| 21 | Rolled Erosion Control Product, Class I Type C, Short Term (209.1803) | SY | 1,000 | $6.00 | $9.00 | $4.85 | $10.00 | $8.50 | $10.10 |
| 22 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 6,041 | $12.00 | $7.00 | $5.20 | $12.00 | $9.00 | $12.12 |
| 23 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 1,000 | $5.10 | $3.00 | $6.70 | $5.10 | $24.00 | $5.15 |
| 24 | (209.23010009) | 1,431 | $30.00 | $27.98 | $17.00 | $14.00 | $170.00 | $10.00 | |
| 25 | (304.10119917) | 2,075 | $135.00 | $155.00 | $80.00 | $120.00 | $123.00 | $100.00 | |
| 26 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 68 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 27 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 367.20 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 28 | (404.0189) | TON | 185 | $145.00 | $195.00 | $208.00 | $200.00 | $220.00 | $375.00 |
| 29 | (404.0951) | TON | 1,341 | $275.00 | $195.00 | $225.00 | $200.00 | $168.00 | $260.00 |
| 30 | (404.0961) | TON | 3,451 | $168.00 | $195.00 | $190.00 | $200.00 | $159.00 | $260.00 |
| 31 | (404.1989) | TON | 1,663 | $275.00 | $180.00 | $210.00 | $200.00 | $276.00 | $255.00 |
| 32 | (404.2589) | TON | 1,663 | $275.00 | $180.00 | $210.00 | $200.00 | $286.00 | $255.00 |
| 33 | (404.4189) | TON | 531 | $150.00 | $236.00 | $195.00 | $200.00 | $352.00 | $290.00 |
| 34 | Diluted Tack Coat (407.0102) | GAL | 5,766 | $4.00 | $26.00 | $4.60 | $1.00 | $35.00 | $20.00 |
| 35 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 25,270 | $1.50 | $2.25 | $0.10 | $1.00 | $1.80 | $3.25 |
| 36 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 823 | $16.56 | $9.00 | $7.00 | $3.66 | $30.00 | $4.00 |
| 37 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 36,589 | $6.00 | $9.00 | $6.00 | $8.00 | $10.00 | $22.00 |
| 38 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 84 | $900.00 | $675.00 | $500.00 | $300.00 | $850.00 | $700.00 |
| 39 | (551.03950017) | 5 | $2,000.00 | $31,000 | $38,000 | $40,000 | $7,300.00 | $29,500 | |
| 40 | Cast-In-Place Concrete Piles (551.11) | LF | 9,775 | $225.00 | $185.00 | $224.00 | $150.00 | $180.00 | $172.00 |
| 41 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $350,000 | $225,000 | $283,600 | $750,000 | $25,000 | $185,000 |
| 42 | Dynamic Pile Load Testing (551.14) | EACH | 6 | $4,750.00 | $5,000.00 | $6,101.00 | $10,000 | $5,950.00 | $4,700.00 |
| 43 | Splices for CIP Piles (551.15) | EACH | 69 | $4,500.00 | $3,200.00 | $3,932.00 | $1,000.00 | $4,160.00 | $3,014.00 |
| 44 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $31.57 | $31.57 | $31.57 | $31.57 | $31.57 | $31.57 |
| 45 | Temporary Steel Sheeting (552.13) | SF | 4,176 | $78.00 | $51.00 | $50.00 | $50.00 | $30.00 | $100.00 |
| 46 | Shields and Shoring (552.17) | SF | 2,022 | $1.00 | $30.00 | $20.00 | $1.00 | $31.00 | $10.00 |
| 47 | (552.2001) | LF | 438 | $750.00 | $960.00 | $905.00 | $220.00 | $630.00 | $900.00 |
| 48 | (552.2201) | LF | 773 | $600.00 | $385.00 | $510.00 | $225.00 | $752.00 | $330.00 |
| 49 | (552.230201) | SF | 2,456 | $50.00 | $63.00 | $3.75 | $20.00 | $65.00 | $60.00 |
| 50 | Footing Concrete, Performance (555.0011) | CY | 253 | $920.00 | $725.00 | $670.00 | $900.00 | $712.00 | $1,250.00 |
| 51 | Concrete for Structures, Performance (555.0021) | CY | 941 | $1,650.00 | $1,270.00 | $1,700.00 | $1,400.00 | $2,200.00 | $1,900.00 |
| 52 | (555.01940007) | 2,233 | $10.00 | $11.00 | $13.00 | $29.00 | $30.00 | $10.00 | |
| 53 | (555.10000006) | 7 | $1,350.00 | $450.00 | $1,195.00 | $2,025.00 | $5,000.00 | $695.00 | |
| 54 | (555.72940001) | 10,618 | $7.00 | $39.00 | $6.40 | $5.00 | $65.00 | $29.00 | |
| 55 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.10 | $6.10 | $6.10 | $6.10 | $6.10 | $6.10 |
| 56 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $11.33 | $11.33 | $11.33 | $11.33 | $11.33 | $11.33 |
| 57 | Stainless Steel Bar Reinforcement for Structures (556.0205) | LB | 202,341 | $3.70 | $5.00 | $5.25 | $4.00 | $4.45 | $5.85 |
| 58 | Stud Shear Connectors for Bridges (556.03) | EACH | 18,522 | $7.00 | $8.00 | $10.00 | $4.00 | $9.55 | $7.07 |
| 59 | (557.1011) | SY | 806 | $600.00 | $450.00 | $500.00 | $550.00 | $741.00 | $800.00 |
| 60 | (557.1111) | SY | 2,789 | $1,060.00 | $900.00 | $800.00 | $625.00 | $790.00 | $850.00 |
| 61 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 3,447 | $13.23 | $5.00 | $10.00 | $13.00 | $33.00 | $1.60 |
| 62 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $16.40 | $16.40 | $16.40 | $16.40 | $16.40 | $16.40 |
| 63 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 3,284 | $16.00 | $19.00 | $18.00 | $16.00 | $24.00 | $8.00 |
| 64 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 29,548 | $1.47 | $1.50 | $1.30 | $1.50 | $1.65 | $2.00 |
| 65 | Protective Sealing of New Structural Concrete (559.02) | SF | 4,330 | $2.46 | $4.50 | $3.60 | $2.50 | $8.00 | $8.00 |
| 66 | (559.91100010) | 10,618 | $4.98 | $6.00 | $6.55 | $5.00 | $7.10 | $11.50 | |
| 67 | (564.0501) | LS | 1 | $3,650,000 | $3,400,000 | $3,326,976 | $2,460,000 | $3,230,000 | $3,795,097 |
| 68 | (564.0502) | LS | 1 | $2,600,000 | $2,700,000 | $2,568,280 | $1,900,000 | $2,425,000 | $2,910,000 |
| 69 | Type E.B. Expansion Bearing (Over 225 k) (565.2035) | EACH | 14 | $7,500.00 | $6,665.00 | $6,947.00 | $5,900.00 | $6,375.00 | $7,450.00 |
| 70 | (565.30130101) | 28 | $600.00 | $960.00 | $548.00 | $800.00 | $2,165.00 | $700.00 | |
| 71 | Armorless Bridge Joint (567.60) | LF | 230 | $450.00 | $380.00 | $425.00 | $450.00 | $727.00 | $500.00 |
| 72 | Transition Bridge Railing (568.70) | LF | 160 | $342.00 | $360.00 | $450.00 | $410.00 | $392.00 | $510.10 |
| 73 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 990 | $837.50 | $460.00 | $585.00 | $350.00 | $835.00 | $820.00 |
| 74 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $13.23 | $13.23 | $13.23 | $13.23 | $13.23 | $13.23 |
| 75 | (572.00020101) | LS | 1 | $528,500 | $357,000 | $703,099 | $550,000 | $525,000 | $895,000 |
| 76 | (572.00020201) | LS | 1 | $450,300 | $283,500 | $599,064 | $463,000 | $500,000 | $760,000 |
| 77 | Scuppers (Type B) (576.02) | EACH | 15 | $4,000.00 | $3,100.00 | $2,503.00 | $10,000 | $4,810.00 | $9,000.00 |
| 78 | Downspout System (Ductile Iron) (576.2001) | LF | 346 | $670.00 | $780.00 | $1,166.00 | $550.00 | $1,065.00 | $885.00 |
| 79 | (603.6002) | LF | 22 | $90.00 | $410.00 | $566.00 | $50.00 | $285.00 | $835.00 |
| 80 | (604.071001) | EACH | 16 | $4,200.00 | $3,400.00 | $781.00 | $1,300.00 | $5,275.00 | $3,100.00 |
| 81 | (604.13000011) | 1 | $4,200.00 | $4,200.00 | $1,582.00 | $4,200.00 | $15,000 | $4,500.00 | |
| 82 | (604.501013) | LF | 45 | $1,600.00 | $1,900.00 | $1,950.00 | $2,600.00 | $2,250.00 | $1,800.00 |
| 83 | (604.501014) | LF | 5 | $2,000.00 | $1,900.00 | $1,923.00 | $2,700.00 | $4,010.00 | $1,900.00 |
| 84 | Underdrain Filter, Type I (605.0901) | CY | 20 | $150.00 | $75.00 | $500.00 | $130.00 | $67.00 | $1,000.00 |
| 85 | (605.1501) | LF | 1,276 | $65.00 | $24.00 | $6.00 | $29.00 | $85.00 | $16.00 |
| 86 | Box Beam Guide Railing (606.10) | LF | 751 | $105.50 | $110.00 | $140.00 | $125.00 | $93.00 | $108.00 |
| 87 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 296 | $145.00 | $152.00 | $190.00 | $140.00 | $110.00 | $115.15 |
| 88 | Box Beam End Piece (606.120101) | EACH | 3 | $10,000 | $1,323.00 | $1,660.00 | $3,500.00 | $520.00 | $757.58 |
| 89 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $6,500.00 | $6,825.00 | $8,560.00 | $13,000 | $6,745.00 | $13,351 |
| 90 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $3,805.00 | $3,995.00 | $5,100.00 | $11,000 | $10,425 | $8,792.93 |
| 91 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 1 | $7,675.00 | $8,060.00 | $10,100 | $6,500.00 | $520.00 | $11,093 |
| 92 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 1,520 | $75.00 | $61.00 | $80.00 | $57.00 | $73.00 | $76.01 |
| 93 | Single-Slope Concrete Median Barrier - Wide (Optional) (606.3051) | LF | 80 | $347.67 | $565.00 | $372.00 | $530.00 | $680.00 | $469.27 |
| 94 | Single-Slope Concrete Median Barrier - Wide (Precast) (606.3052) | LF | 1,397 | $190.00 | $290.00 | $350.00 | $360.00 | $255.00 | $350.00 |
| 95 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 1,393 | $15.00 | $16.00 | $20.00 | $20.00 | $18.00 | $34.34 |
| 96 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 386 | $20.00 | $21.00 | $27.00 | $30.00 | $20.00 | $31.31 |
| 97 | Removing and Disposing Concrete Barrier (606.75) | LF | 1,426 | $65.00 | $92.00 | $20.00 | $133.50 | $60.00 | $100.00 |
| 98 | Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001) | EACH | 1 | $15,000 | $10,000 | $4,423.00 | $3,700.00 | $7,115.00 | $22,300 |
| 99 | (607.06400016) | 378 | $220.00 | $231.00 | $303.00 | $195.00 | $400.00 | $187.88 | |
| 100 | (607.41010010) | 2,761 | $10.00 | $5.00 | $10.00 | $5.00 | $8.15 | $11.00 | |
| 101 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 26 | $750.00 | $330.00 | $676.00 | $460.00 | $2,500.00 | $810.00 |
| 102 | Stone Curb – Bridge (Type A) (609.0301) | LF | 70 | $280.00 | $265.00 | $132.00 | $200.00 | $210.00 | $250.00 |
| 103 | Mycorrhizal Fungi (610.0701) | LB | 33 | $30.00 | $36.00 | $40.00 | $30.00 | $35.00 | $30.30 |
| 104 | Moisture Retention Additive (610.08) | LB | 11 | $30.00 | $44.00 | $40.00 | $30.00 | $35.00 | $30.30 |
| 105 | Compost (610.10) | CY | 109 | $85.00 | $56.00 | $112.00 | $85.00 | $100.00 | $85.86 |
| 106 | Topsoil - Roadside (610.1402) | CY | 696 | $90.00 | $94.00 | $119.00 | $90.00 | $105.00 | $90.91 |
| 107 | (610.15120208) | 1,369 | $10.00 | $5.25 | $13.00 | $10.00 | $10.00 | $10.10 | |
| 108 | Turf Establishment - Roadside (610.1601) | SY | 5,578 | $3.20 | $1.60 | $4.20 | $3.00 | $3.75 | $3.23 |
| 109 | Watering Vegetation (610.19) | 1,000 GALLONS | 478 | $80.00 | $158.00 | $105.00 | $80.00 | $94.00 | $80.81 |
| 110 | (611.0151) | EACH | 4 | $1,500.00 | $630.00 | $1,976.00 | $1,500.00 | $1,770.00 | $1,515.15 |
| 111 | (611.0201) | EACH | 4 | $1,500.00 | $630.00 | $1,976.00 | $1,500.00 | $1,770.00 | $1,515.15 |
| 112 | (611.0441) | EACH | 77 | $200.00 | $100.00 | $263.00 | $200.00 | $235.00 | $202.02 |
| 113 | (611.0561) | EACH | 83 | $220.00 | $131.00 | $290.00 | $220.00 | $260.00 | $222.22 |
| 114 | Post-Planting Care (611.19) | EACH | 135 | $10.00 | $26.00 | $13.00 | $10.00 | $11.00 | $10.10 |
| 115 | (611.19010024) | 1 | $400.00 | $63.00 | $527.00 | $400.00 | $470.00 | $404.04 | |
| 116 | (611.19020024) | 1 | $350.00 | $63.00 | $461.00 | $350.00 | $410.00 | $353.54 | |
| 117 | (611.19040024) | 15 | $50.00 | $10.00 | $66.00 | $50.00 | $55.00 | $50.51 | |
| 118 | (611.19050024) | 16 | $60.00 | $13.00 | $79.00 | $60.00 | $70.00 | $60.61 | |
| 119 | (617.01010024) | 200 | $10.00 | $2.10 | $13.00 | $10.00 | $12.00 | $10.10 | |
| 120 | (617.10000024) | 20 | $60.00 | $52.00 | $79.00 | $60.00 | $70.00 | $60.61 | |
| 121 | (617.11000024) | LS | 1 | $1,000.00 | $5,250.00 | $1,317.00 | $1,000.00 | $1,190.00 | $1,010.10 |
| 122 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $939,638 | $1,530,000 | $3,542,500 | $2,450,000 | $750,000 | $3,472,926 |
| 123 | (619.080102) | LF | 134,512 | $1.25 | $1.30 | $1.65 | $1.25 | $1.50 | $1.25 |
| 124 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 968 | $4.45 | $5.00 | $5.85 | $4.50 | $5.30 | $4.45 |
| 125 | (619.100101) | LF | 172,250 | $0.40 | $0.45 | $0.55 | $0.40 | $0.50 | $0.40 |
| 126 | (619.100104) | LF | 20,708 | $2.65 | $2.80 | $3.50 | $2.70 | $3.15 | $2.65 |
| 127 | (619.10050020) | 2,296 | $12.14 | $12.00 | $7.45 | $30.00 | $42.50 | $22.00 | |
| 128 | (619.111133) | EACH | 20 | $2,500.00 | $12,000 | $27,000 | $30,000 | $30,740 | $45,000 |
| 129 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 9,705 | $28.00 | $51.00 | $15.00 | $10.00 | $25.00 | $80.00 |
| 130 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 4,632 | $70.00 | $105.00 | $20.00 | $20.00 | $33.00 | $118.00 |
| 131 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,510 | $40.00 | $92.00 | $12.00 | $40.00 | $65.00 | $168.00 |
| 132 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 18 | $9,000.00 | $7,800.00 | $10,000 | $2,500.00 | $10,500 | $26,000 |
| 133 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $325,000 | $327,000 | $300,000 | $1,500,000 | $660,000 | $500,000 |
| 134 | Pavement Patching (Tonnage) (619.2602) | TON | 25 | $2,500.00 | $1,300.00 | $777.00 | $750.00 | $3,845.00 | $1,150.00 |
| 135 | (619.67020010) | LS | 1 | $54,764 | $60,000 | $72,100 | $54,764 | $67,800 | $60,000 |
| 136 | Stone Filling (Light) (620.03) | CY | 19 | $500.00 | $264.00 | $350.00 | $1,000.00 | $800.00 | $255.00 |
| 137 | Bedding Material, Type 1 (620.0801) | CY | 9 | $700.00 | $430.00 | $395.00 | $1,500.00 | $214.00 | $245.00 |
| 138 | Cleaning Closed Drainage Systems (621.03) | LF | 2,478 | $3.00 | $7.00 | $20.00 | $6.00 | $24.00 | $8.00 |
| 139 | Cleaning Drainage Structures (621.04) | EACH | 21 | $950.00 | $725.00 | $922.00 | $1,040.00 | $1,500.00 | $870.00 |
| 140 | (621.05020004) | 471 | $12.00 | $23.00 | $22.00 | $15.00 | $31.00 | $5.00 | |
| 141 | Survey Operations (625.01) | LS | 1 | $280,000 | $950,000 | $500,000 | $1,500,000 | $395,600 | $500,000 |
| 142 | (627.50140008) | 8,106 | $4.15 | $5.00 | $4.35 | $4.00 | $4.00 | $4.50 | |
| 143 | Cleaning, Sealing and/or Filling Cracks (633.12) | LS | 1 | $25,000 | $58,000 | $68,900 | $30,000 | $3,900.00 | $35,000 |
| 144 | (634.10010015) | LS | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 145 | Field Laboratory (637.01) | EACH | 1 | $12,000 | $29,610 | $27,000 | $50,000 | $35,000 | $65,000 |
| 146 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,500.00 | $2,375.00 | $3,326.00 | $4,500.00 | $5,100.00 | $5,500.00 |
| 147 | Engineer’s Field Office – Type 4 (637.14) | MONTH | 26 | $15,000 | $11,000 | $7,500.00 | $15,000 | $23,000 | $16,500 |
| 148 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 149 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 150 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 151 | (637.41000115) | 26 | $150.00 | $140.00 | $102.00 | $300.00 | $217.00 | $325.00 | |
| 152 | (637.41000215) | 26 | $150.00 | $140.00 | $102.00 | $300.00 | $217.00 | $325.00 | |
| 153 | (637.41000315) | 26 | $150.00 | $140.00 | $102.00 | $300.00 | $217.00 | $325.00 | |
| 154 | (639.21010011) | LS | 1 | $100,000 | $100,000 | $100,000 | $100,000 | $114,000 | $100,000 |
| 155 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 238 | $72.00 | $76.00 | $94.00 | $65.00 | $90.00 | $71.72 |
| 156 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 336 | $140.00 | $147.00 | $185.00 | $65.00 | $90.00 | $83.84 |
| 157 | Type A Sign Posts (645.81) | EACH | 23 | $360.00 | $378.00 | $475.00 | $200.00 | $521.00 | $340.40 |
| 158 | (645.830202) | EACH | 4 | $5,150.00 | $5,400.00 | $6,800.00 | $3,000.00 | $6,740.00 | $3,803.03 |
| 159 | (645.830502) | EACH | 2 | $6,975.00 | $7,300.00 | $9,200.00 | $6,000.00 | $7,970.00 | $7,510.10 |
| 160 | (645.830802) | EACH | 2 | $13,650 | $14,000 | $18,000 | $10,000 | $10,400 | $13,580 |
| 161 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 294 | $50.00 | $53.00 | $85.00 | $50.00 | $79.00 | $75.76 |
| 162 | Steel Post, 2.0 lb/ft (646.32) | EACH | 238 | $100.00 | $105.00 | $165.00 | $200.00 | $214.00 | $151.52 |
| 163 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 4 | $500.00 | $525.00 | $660.00 | $500.00 | $980.00 | $378.79 |
| 164 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 25 | $50.00 | $52.50 | $65.00 | $100.00 | $500.00 | $75.76 |
| 165 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $300.00 | $315.00 | $395.00 | $100.00 | $850.00 | $353.54 |
| 166 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size III (Over 100 Square Feet) (647.63) | EACH | 1 | $1,000.00 | $1,050.00 | $1,976.00 | $500.00 | $900.00 | $1,515.15 |
| 167 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 6 | $500.00 | $525.00 | $988.00 | $800.00 | $3,100.00 | $757.58 |
| 168 | (655.07030010) | 15 | $2,660.86 | $3,200.00 | $2,228.00 | $2,000.00 | $1,500.00 | $4,110.00 | |
| 169 | Manhole Frame & Cover (655.1202) | EACH | 1 | $891.56 | $4,600.00 | $725.00 | $800.00 | $1,000.00 | $3,770.00 |
| 170 | (670.21311210) | 750 | $21.00 | $22.00 | $28.00 | $21.00 | $25.00 | $22.00 | |
| 171 | (670.2303) | LF | 1,260 | $61.00 | $64.00 | $80.00 | $61.00 | $75.00 | $62.00 |
| 172 | (670.2501) | LF | 72 | $11.00 | $12.00 | $14.00 | $11.00 | $13.00 | $12.00 |
| 173 | (670.30019202) | 12 | $2,958.00 | $3,105.00 | $3,896.00 | $2,958.00 | $3,600.00 | $3,000.00 | |
| 174 | (670.41090911) | 2 | $5,111.00 | $5,366.00 | $6,732.00 | $5,111.00 | $6,300.00 | $5,200.00 | |
| 175 | (670.41091511) | 18 | $3,054.00 | $3,210.00 | $4,023.00 | $3,054.00 | $3,700.00 | $3,085.00 | |
| 176 | (670.7004) | LF | 6,470 | $4.60 | $5.00 | $6.05 | $4.60 | $5.00 | $5.00 |
| 177 | Ground Wire No. 6 AWG. (670.7501) | LF | 1,302 | $7.00 | $7.00 | $9.20 | $7.00 | $8.00 | $7.50 |
| 178 | (670.81200010) | 16 | $545.30 | $575.00 | $718.00 | $550.00 | $670.00 | $550.81 | |
| 179 | (670.92020010) | 24 | $2,936.40 | $3,100.00 | $3,867.00 | $2,950.00 | $3,600.00 | $3,000.00 | |
| 180 | (670.94110010) | LS | 1 | $8,682.90 | $9,100.00 | $11,400 | $8,700.00 | $10,700 | $8,800.00 |
| 181 | Pole Excavation and Concrete Foundation (680.5001) | CY | 4 | $5,502.18 | $12,200 | $5,046.00 | $12,000 | $1,300.00 | $3,800.00 |
| 182 | (680.51050010) | 10 | $2,567.00 | $2,700.00 | $3,381.00 | $3,973.00 | $3,100.00 | $2,600.00 | |
| 183 | (680.51100010) | 7 | $32.00 | $34.00 | $42.00 | $32.00 | $39.00 | $33.00 | |
| 184 | (680.51400010) | 3 | $4,138.00 | $4,300.00 | $5,451.00 | $1,650.00 | $5,100.00 | $4,200.00 | |
| 185 | (680.520103) | LF | 60 | $26.60 | $28.00 | $35.00 | $27.00 | $32.00 | $27.00 |
| 186 | (680.520108) | LF | 960 | $39.50 | $41.00 | $52.00 | $40.00 | $48.00 | $40.00 |
| 187 | (680.520110) | LF | 490 | $94.80 | $100.00 | $125.00 | $95.00 | $117.00 | $96.00 |
| 188 | Trenchless Installation Method for Conduit (680.5301) | LF | 385 | $177.00 | $185.00 | $1,200.00 | $177.00 | $500.00 | $179.00 |
| 189 | (680.53010010) | 555 | $17.10 | $18.00 | $23.00 | $17.00 | $21.00 | $17.50 | |
| 190 | (680.78010005) | 7 | $1,117.80 | $3,165.00 | $1,471.00 | $1,120.00 | $1,380.00 | $1,130.00 | |
| 191 | (680.78020005) | 4 | $1,580.00 | $1,700.00 | $2,081.00 | $1,580.00 | $1,950.00 | $1,600.00 | |
| 192 | (680.80328110) | 1 | $7,496.00 | $7,800.00 | $9,874.00 | $7,496.00 | $9,280.00 | $7,580.00 | |
| 193 | (680.83200010) | LS | 1 | $9,974.00 | $10,000 | $13,100 | $9,974.00 | $12,300 | $10,075 |
| 194 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 | $22.50 |
| 195 | (680.99910011) | LS | 1 | $15,797 | $17,000 | $20,800 | $29,000 | $20,000 | $16,000 |
| 196 | (683.03090010) | 1 | $9,231.00 | $9,700.00 | $12,200 | $9,200.00 | $11,400 | $9,350.00 | |
| 197 | (683.04205010) | 1 | $64,447 | $46,000 | $58,200 | $44,200 | $54,000 | $44,650 | |
| 198 | (683.07021210) | 1,640 | $11.60 | $12.00 | $15.00 | $11.60 | $14.00 | $12.00 | |
| 199 | (683.07100010) | 3,975 | $4.70 | $5.00 | $6.20 | $5.00 | $5.00 | $5.00 | |
| 200 | (683.07101210) | 1 | $1,301.00 | $1,365.00 | $1,714.00 | $1,301.00 | $1,600.00 | $1,315.00 | |
| 201 | (683.07202410) | 1,600 | $5.00 | $5.25 | $6.60 | $5.00 | $6.00 | $5.05 | |
| 202 | (683.07206010) | 2,350 | $7.00 | $7.35 | $9.20 | $7.00 | $9.00 | $7.50 | |
| 203 | (683.10340010) | 1 | $1,922.00 | $2,020.00 | $2,532.00 | $1,922.00 | $2,400.00 | $1,950.00 | |
| 204 | (683.94000404) | 510 | $34.00 | $36.00 | $45.00 | $34.00 | $42.00 | $35.00 | |
| 205 | (683.96050308) | 2 | $5,024.00 | $5,275.00 | $6,618.00 | $5,024.00 | $6,220.00 | $5,075.00 | |
| 206 | (683.96100705) | 480 | $55.00 | $58.00 | $72.00 | $55.00 | $68.00 | $56.00 | |
| 207 | (685.07200110) | 12,236 | $0.78 | $0.85 | $1.05 | $1.00 | $1.00 | $0.78 | |
| 208 | (685.07200310) | 4 | $165.00 | $175.00 | $217.00 | $165.00 | $195.00 | $165.00 | |
| 209 | (685.07200410) | 10,752 | $1.80 | $1.90 | $2.35 | $2.00 | $2.15 | $1.80 | |
| 210 | (685.07200610) | 4,121 | $0.78 | $0.85 | $1.05 | $1.00 | $1.00 | $0.78 | |
| 211 | (685.16010014) | 34,292 | $1.59 | $1.75 | $2.10 | $2.00 | $1.80 | $1.59 | |
| 212 | (685.17010014) | 9,947 | $1.59 | $1.75 | $2.10 | $2.00 | $1.80 | $1.59 | |
| 213 | (691.04000020) | 145,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 214 | Field Change Payment (FCP) (697.03) | DOL | 2,054,287 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 215 | Asphalt Price Adjustment (698.04) | DOL | 2,391 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 216 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 217 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 218 | Mobilization (699.040001) | LS | 1 | $1,350,000 | $1,450,000 | $1,500,000 | $1,675,149 | $1,700,000 | $1,500,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.