NYSDOT contract D265809 bid tabulation

PIN 0050.30 NY 135 Bridge Replace over I-495. Let by New York State DOT on September 17, 2026, Nassau, Region 10. 8 bids received; low bid $36,442,000 by H & L Contracting LLC.

Owner
New York State DOT
Letting
17 SEP 2026
Pay items
218
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1H & L Contracting LLC$36,442,000Low
2Defoe Corporation$38,831,196+7.0%
3Grace Industries LLC$40,181,997+10%
4Posillico Civil Inc$43,558,880+20%
5Tully Construction Company Inc$44,731,000+23%
6SPC Construction Co LLC$46,285,000+27%
7C.A.C. Industries Inc$48,600,000+33%
8Es II Enterprises LLC /DBA El Sol Enterprises$49,215,000+35%
NYSDOT contract D265809: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H & L Contracting LLC2. Defoe Corporation3. Grace Industries LLC4. Posillico Civil Inc5. Tully Construction Company Inc6. SPC Construction Co LLC
1Clearing and Grubbing (201.07)ACRE1$50,000$25,000$40,077$250,000$186,000$300,000
2 (202.120001)LS1$1,450,000$1,455,000$975,000$6,345,000$2,651,291$1,250,000
3 (202.120002)LS1$950,000$1,455,000$1,000,000$2,950,000$2,200,000$850,000
4Removal of Substructures (202.19)CY2,035$275.00$400.00$363.00$650.00$850.00$550.00
5Unclassified Excavation and Disposal (203.02)CY9,804$2.00$150.00$145.00$70.00$188.00$175.00
6Embankment In Place (203.03)CY5,313$165.00$60.00$75.00$38.00$100.00$45.00
7Select Granular Fill (203.07)CY115$65.00$77.00$39.00$70.00$42.00$150.00
8Select Granular Fill, Slope Protection - Type A (203.0801)CY130$500.00$129.00$189.00$200.00$375.00$134.00
9Select Structural Fill (203.21)CY995$60.00$90.00$148.00$95.00$121.00$120.00
10 (203.24010017)251$250.00$117.00$424.00$100.00$730.00$100.00
11Structure Excavation (206.01)CY12,335$60.00$98.00$80.00$45.00$93.00$95.00
12Trench and Culvert Excavation (206.0201)CY175$100.00$64.00$70.00$1.00$400.00$275.00
13Conduit Excavation and Backfill including Surface Restoration (206.03)LF1,960$35.00$41.00$25.00$24.00$40.00$70.00
14Geotextile Bedding (207.20)SY48$3.00$30.00$17.00$4.00$32.00$40.00
15Prefabricated Composite Structural Drain (207.26)SY182$65.00$43.00$13.00$70.00$11.00$60.00
16Prefabricated Composite Integral Abutment Drain (207.27)SY513$12.00$39.00$16.00$35.00$11.00$40.00
17Mulch – Temporary (209.100101)SY5,600$2.80$2.10$3.70$2.80$7.00$2.83
18Seed and Mulch – Temporary (209.1003)SY1,400$2.90$3.15$3.80$2.90$3.45$2.93
19Silt Fence - Temporary (209.13)LF200$10.00$45.00$21.00$50.00$320.00$18.02
20Drainage Structure Inlet Protection, Catch Basin Inserts for Trash, Sediment and Debris Removal – Temporary (209.1706)EACH28$460.00$550.00$450.00$700.00$600.00$900.00
21Rolled Erosion Control Product, Class I Type C, Short Term (209.1803)SY1,000$6.00$9.00$4.85$10.00$8.50$10.10
22Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY6,041$12.00$7.00$5.20$12.00$9.00$12.12
23Soil Stabilizers, Class IV Type C (209.2103)SY1,000$5.10$3.00$6.70$5.10$24.00$5.15
24 (209.23010009)1,431$30.00$27.98$17.00$14.00$170.00$10.00
25 (304.10119917)2,075$135.00$155.00$80.00$120.00$123.00$100.00
26Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT68$115.00$115.00$115.00$115.00$115.00$115.00
27Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT367.20$115.00$115.00$115.00$115.00$115.00$115.00
28 (404.0189)TON185$145.00$195.00$208.00$200.00$220.00$375.00
29 (404.0951)TON1,341$275.00$195.00$225.00$200.00$168.00$260.00
30 (404.0961)TON3,451$168.00$195.00$190.00$200.00$159.00$260.00
31 (404.1989)TON1,663$275.00$180.00$210.00$200.00$276.00$255.00
32 (404.2589)TON1,663$275.00$180.00$210.00$200.00$286.00$255.00
33 (404.4189)TON531$150.00$236.00$195.00$200.00$352.00$290.00
34Diluted Tack Coat (407.0102)GAL5,766$4.00$26.00$4.60$1.00$35.00$20.00
35Asphalt Pavement Joint Adhesive (418.7603)LF25,270$1.50$2.25$0.10$1.00$1.80$3.25
36Production Cold-Mill Surface Planing of Bituminous Concrete (490.15)SY823$16.56$9.00$7.00$3.66$30.00$4.00
37Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY36,589$6.00$9.00$6.00$8.00$10.00$22.00
38PCC Foundation for Pavement, PEM Concrete (503.1013)CY84$900.00$675.00$500.00$300.00$850.00$700.00
39 (551.03950017)5$2,000.00$31,000$38,000$40,000$7,300.00$29,500
40Cast-In-Place Concrete Piles (551.11)LF9,775$225.00$185.00$224.00$150.00$180.00$172.00
41Furnishing Equipment for Driving Piles (551.13)LS1$350,000$225,000$283,600$750,000$25,000$185,000
42Dynamic Pile Load Testing (551.14)EACH6$4,750.00$5,000.00$6,101.00$10,000$5,950.00$4,700.00
43Splices for CIP Piles (551.15)EACH69$4,500.00$3,200.00$3,932.00$1,000.00$4,160.00$3,014.00
44Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902)QUALITY UNIT1$31.57$31.57$31.57$31.57$31.57$31.57
45Temporary Steel Sheeting (552.13)SF4,176$78.00$51.00$50.00$50.00$30.00$100.00
46Shields and Shoring (552.17)SF2,022$1.00$30.00$20.00$1.00$31.00$10.00
47 (552.2001)LF438$750.00$960.00$905.00$220.00$630.00$900.00
48 (552.2201)LF773$600.00$385.00$510.00$225.00$752.00$330.00
49 (552.230201)SF2,456$50.00$63.00$3.75$20.00$65.00$60.00
50Footing Concrete, Performance (555.0011)CY253$920.00$725.00$670.00$900.00$712.00$1,250.00
51Concrete for Structures, Performance (555.0021)CY941$1,650.00$1,270.00$1,700.00$1,400.00$2,200.00$1,900.00
52 (555.01940007)2,233$10.00$11.00$13.00$29.00$30.00$10.00
53 (555.10000006)7$1,350.00$450.00$1,195.00$2,025.00$5,000.00$695.00
54 (555.72940001)10,618$7.00$39.00$6.40$5.00$65.00$29.00
55Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$6.10$6.10$6.10$6.10$6.10$6.10
56Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$11.33$11.33$11.33$11.33$11.33$11.33
57Stainless Steel Bar Reinforcement for Structures (556.0205)LB202,341$3.70$5.00$5.25$4.00$4.45$5.85
58Stud Shear Connectors for Bridges (556.03)EACH18,522$7.00$8.00$10.00$4.00$9.55$7.07
59 (557.1011)SY806$600.00$450.00$500.00$550.00$741.00$800.00
60 (557.1111)SY2,789$1,060.00$900.00$800.00$625.00$790.00$850.00
61Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY3,447$13.23$5.00$10.00$13.00$33.00$1.60
62Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$16.40$16.40$16.40$16.40$16.40$16.40
63Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY3,284$16.00$19.00$18.00$16.00$24.00$8.00
64Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF29,548$1.47$1.50$1.30$1.50$1.65$2.00
65Protective Sealing of New Structural Concrete (559.02)SF4,330$2.46$4.50$3.60$2.50$8.00$8.00
66 (559.91100010)10,618$4.98$6.00$6.55$5.00$7.10$11.50
67 (564.0501)LS1$3,650,000$3,400,000$3,326,976$2,460,000$3,230,000$3,795,097
68 (564.0502)LS1$2,600,000$2,700,000$2,568,280$1,900,000$2,425,000$2,910,000
69Type E.B. Expansion Bearing (Over 225 k) (565.2035)EACH14$7,500.00$6,665.00$6,947.00$5,900.00$6,375.00$7,450.00
70 (565.30130101)28$600.00$960.00$548.00$800.00$2,165.00$700.00
71Armorless Bridge Joint (567.60)LF230$450.00$380.00$425.00$450.00$727.00$500.00
72Transition Bridge Railing (568.70)LF160$342.00$360.00$450.00$410.00$392.00$510.10
73Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF990$837.50$460.00$585.00$350.00$835.00$820.00
74Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$13.23$13.23$13.23$13.23$13.23$13.23
75 (572.00020101)LS1$528,500$357,000$703,099$550,000$525,000$895,000
76 (572.00020201)LS1$450,300$283,500$599,064$463,000$500,000$760,000
77Scuppers (Type B) (576.02)EACH15$4,000.00$3,100.00$2,503.00$10,000$4,810.00$9,000.00
78Downspout System (Ductile Iron) (576.2001)LF346$670.00$780.00$1,166.00$550.00$1,065.00$885.00
79 (603.6002)LF22$90.00$410.00$566.00$50.00$285.00$835.00
80 (604.071001)EACH16$4,200.00$3,400.00$781.00$1,300.00$5,275.00$3,100.00
81 (604.13000011)1$4,200.00$4,200.00$1,582.00$4,200.00$15,000$4,500.00
82 (604.501013)LF45$1,600.00$1,900.00$1,950.00$2,600.00$2,250.00$1,800.00
83 (604.501014)LF5$2,000.00$1,900.00$1,923.00$2,700.00$4,010.00$1,900.00
84Underdrain Filter, Type I (605.0901)CY20$150.00$75.00$500.00$130.00$67.00$1,000.00
85 (605.1501)LF1,276$65.00$24.00$6.00$29.00$85.00$16.00
86Box Beam Guide Railing (606.10)LF751$105.50$110.00$140.00$125.00$93.00$108.00
87Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF296$145.00$152.00$190.00$140.00$110.00$115.15
88Box Beam End Piece (606.120101)EACH3$10,000$1,323.00$1,660.00$3,500.00$520.00$757.58
89Box Beam Guide Railing End Assembly Type I (606.120102)EACH1$6,500.00$6,825.00$8,560.00$13,000$6,745.00$13,351
90Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH1$3,805.00$3,995.00$5,100.00$11,000$10,425$8,792.93
91HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH1$7,675.00$8,060.00$10,100$6,500.00$520.00$11,093
92HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF1,520$75.00$61.00$80.00$57.00$73.00$76.01
93Single-Slope Concrete Median Barrier - Wide (Optional) (606.3051)LF80$347.67$565.00$372.00$530.00$680.00$469.27
94Single-Slope Concrete Median Barrier - Wide (Precast) (606.3052)LF1,397$190.00$290.00$350.00$360.00$255.00$350.00
95Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101)LF1,393$15.00$16.00$20.00$20.00$18.00$34.34
96Removing and Disposing Box Beam Guide Railing (606.73)LF386$20.00$21.00$27.00$30.00$20.00$31.31
97Removing and Disposing Concrete Barrier (606.75)LF1,426$65.00$92.00$20.00$133.50$60.00$100.00
98Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001)EACH1$15,000$10,000$4,423.00$3,700.00$7,115.00$22,300
99 (607.06400016)378$220.00$231.00$303.00$195.00$400.00$187.88
100 (607.41010010)2,761$10.00$5.00$10.00$5.00$8.15$11.00
101Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON26$750.00$330.00$676.00$460.00$2,500.00$810.00
102Stone Curb – Bridge (Type A) (609.0301)LF70$280.00$265.00$132.00$200.00$210.00$250.00
103Mycorrhizal Fungi (610.0701)LB33$30.00$36.00$40.00$30.00$35.00$30.30
104Moisture Retention Additive (610.08)LB11$30.00$44.00$40.00$30.00$35.00$30.30
105Compost (610.10)CY109$85.00$56.00$112.00$85.00$100.00$85.86
106Topsoil - Roadside (610.1402)CY696$90.00$94.00$119.00$90.00$105.00$90.91
107 (610.15120208)1,369$10.00$5.25$13.00$10.00$10.00$10.10
108Turf Establishment - Roadside (610.1601)SY5,578$3.20$1.60$4.20$3.00$3.75$3.23
109Watering Vegetation (610.19)1,000 GALLONS478$80.00$158.00$105.00$80.00$94.00$80.81
110 (611.0151)EACH4$1,500.00$630.00$1,976.00$1,500.00$1,770.00$1,515.15
111 (611.0201)EACH4$1,500.00$630.00$1,976.00$1,500.00$1,770.00$1,515.15
112 (611.0441)EACH77$200.00$100.00$263.00$200.00$235.00$202.02
113 (611.0561)EACH83$220.00$131.00$290.00$220.00$260.00$222.22
114Post-Planting Care (611.19)EACH135$10.00$26.00$13.00$10.00$11.00$10.10
115 (611.19010024)1$400.00$63.00$527.00$400.00$470.00$404.04
116 (611.19020024)1$350.00$63.00$461.00$350.00$410.00$353.54
117 (611.19040024)15$50.00$10.00$66.00$50.00$55.00$50.51
118 (611.19050024)16$60.00$13.00$79.00$60.00$70.00$60.61
119 (617.01010024)200$10.00$2.10$13.00$10.00$12.00$10.10
120 (617.10000024)20$60.00$52.00$79.00$60.00$70.00$60.61
121 (617.11000024)LS1$1,000.00$5,250.00$1,317.00$1,000.00$1,190.00$1,010.10
122Basic Work Zone Traffic Control (619.01)LS1$939,638$1,530,000$3,542,500$2,450,000$750,000$3,472,926
123 (619.080102)LF134,512$1.25$1.30$1.65$1.25$1.50$1.25
124Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF968$4.45$5.00$5.85$4.50$5.30$4.45
125 (619.100101)LF172,250$0.40$0.45$0.55$0.40$0.50$0.40
126 (619.100104)LF20,708$2.65$2.80$3.50$2.70$3.15$2.65
127 (619.10050020)2,296$12.14$12.00$7.45$30.00$42.50$22.00
128 (619.111133)EACH20$2,500.00$12,000$27,000$30,000$30,740$45,000
129Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713)LF9,705$28.00$51.00$15.00$10.00$25.00$80.00
130Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF4,632$70.00$105.00$20.00$20.00$33.00$118.00
131Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,510$40.00$92.00$12.00$40.00$65.00$168.00
132Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH18$9,000.00$7,800.00$10,000$2,500.00$10,500$26,000
133Nighttime Operations (Entire Project) (619.24)LS1$325,000$327,000$300,000$1,500,000$660,000$500,000
134Pavement Patching (Tonnage) (619.2602)TON25$2,500.00$1,300.00$777.00$750.00$3,845.00$1,150.00
135 (619.67020010)LS1$54,764$60,000$72,100$54,764$67,800$60,000
136Stone Filling (Light) (620.03)CY19$500.00$264.00$350.00$1,000.00$800.00$255.00
137Bedding Material, Type 1 (620.0801)CY9$700.00$430.00$395.00$1,500.00$214.00$245.00
138Cleaning Closed Drainage Systems (621.03)LF2,478$3.00$7.00$20.00$6.00$24.00$8.00
139Cleaning Drainage Structures (621.04)EACH21$950.00$725.00$922.00$1,040.00$1,500.00$870.00
140 (621.05020004)471$12.00$23.00$22.00$15.00$31.00$5.00
141Survey Operations (625.01)LS1$280,000$950,000$500,000$1,500,000$395,600$500,000
142 (627.50140008)8,106$4.15$5.00$4.35$4.00$4.00$4.50
143Cleaning, Sealing and/or Filling Cracks (633.12)LS1$25,000$58,000$68,900$30,000$3,900.00$35,000
144 (634.10010015)LS1$25,000$25,000$25,000$25,000$25,000$25,000
145Field Laboratory (637.01)EACH1$12,000$29,610$27,000$50,000$35,000$65,000
146Concrete Cylinder Curing Equipment (637.04)EACH1$6,500.00$2,375.00$3,326.00$4,500.00$5,100.00$5,500.00
147Engineer’s Field Office – Type 4 (637.14)MONTH26$15,000$11,000$7,500.00$15,000$23,000$16,500
148Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
149Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
150Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
151 (637.41000115)26$150.00$140.00$102.00$300.00$217.00$325.00
152 (637.41000215)26$150.00$140.00$102.00$300.00$217.00$325.00
153 (637.41000315)26$150.00$140.00$102.00$300.00$217.00$325.00
154 (639.21010011)LS1$100,000$100,000$100,000$100,000$114,000$100,000
155Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF238$72.00$76.00$94.00$65.00$90.00$71.72
156Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF336$140.00$147.00$185.00$65.00$90.00$83.84
157Type A Sign Posts (645.81)EACH23$360.00$378.00$475.00$200.00$521.00$340.40
158 (645.830202)EACH4$5,150.00$5,400.00$6,800.00$3,000.00$6,740.00$3,803.03
159 (645.830502)EACH2$6,975.00$7,300.00$9,200.00$6,000.00$7,970.00$7,510.10
160 (645.830802)EACH2$13,650$14,000$18,000$10,000$10,400$13,580
161Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH294$50.00$53.00$85.00$50.00$79.00$75.76
162Steel Post, 2.0 lb/ft (646.32)EACH238$100.00$105.00$165.00$200.00$214.00$151.52
163Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH4$500.00$525.00$660.00$500.00$980.00$378.79
164Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH25$50.00$52.50$65.00$100.00$500.00$75.76
165Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH2$300.00$315.00$395.00$100.00$850.00$353.54
166Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size III (Over 100 Square Feet) (647.63)EACH1$1,000.00$1,050.00$1,976.00$500.00$900.00$1,515.15
167Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH6$500.00$525.00$988.00$800.00$3,100.00$757.58
168 (655.07030010)15$2,660.86$3,200.00$2,228.00$2,000.00$1,500.00$4,110.00
169Manhole Frame & Cover (655.1202)EACH1$891.56$4,600.00$725.00$800.00$1,000.00$3,770.00
170 (670.21311210)750$21.00$22.00$28.00$21.00$25.00$22.00
171 (670.2303)LF1,260$61.00$64.00$80.00$61.00$75.00$62.00
172 (670.2501)LF72$11.00$12.00$14.00$11.00$13.00$12.00
173 (670.30019202)12$2,958.00$3,105.00$3,896.00$2,958.00$3,600.00$3,000.00
174 (670.41090911)2$5,111.00$5,366.00$6,732.00$5,111.00$6,300.00$5,200.00
175 (670.41091511)18$3,054.00$3,210.00$4,023.00$3,054.00$3,700.00$3,085.00
176 (670.7004)LF6,470$4.60$5.00$6.05$4.60$5.00$5.00
177Ground Wire No. 6 AWG. (670.7501)LF1,302$7.00$7.00$9.20$7.00$8.00$7.50
178 (670.81200010)16$545.30$575.00$718.00$550.00$670.00$550.81
179 (670.92020010)24$2,936.40$3,100.00$3,867.00$2,950.00$3,600.00$3,000.00
180 (670.94110010)LS1$8,682.90$9,100.00$11,400$8,700.00$10,700$8,800.00
181Pole Excavation and Concrete Foundation (680.5001)CY4$5,502.18$12,200$5,046.00$12,000$1,300.00$3,800.00
182 (680.51050010)10$2,567.00$2,700.00$3,381.00$3,973.00$3,100.00$2,600.00
183 (680.51100010)7$32.00$34.00$42.00$32.00$39.00$33.00
184 (680.51400010)3$4,138.00$4,300.00$5,451.00$1,650.00$5,100.00$4,200.00
185 (680.520103)LF60$26.60$28.00$35.00$27.00$32.00$27.00
186 (680.520108)LF960$39.50$41.00$52.00$40.00$48.00$40.00
187 (680.520110)LF490$94.80$100.00$125.00$95.00$117.00$96.00
188Trenchless Installation Method for Conduit (680.5301)LF385$177.00$185.00$1,200.00$177.00$500.00$179.00
189 (680.53010010)555$17.10$18.00$23.00$17.00$21.00$17.50
190 (680.78010005)7$1,117.80$3,165.00$1,471.00$1,120.00$1,380.00$1,130.00
191 (680.78020005)4$1,580.00$1,700.00$2,081.00$1,580.00$1,950.00$1,600.00
192 (680.80328110)1$7,496.00$7,800.00$9,874.00$7,496.00$9,280.00$7,580.00
193 (680.83200010)LS1$9,974.00$10,000$13,100$9,974.00$12,300$10,075
194Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$22.50$22.50$22.50$22.50$22.50$22.50
195 (680.99910011)LS1$15,797$17,000$20,800$29,000$20,000$16,000
196 (683.03090010)1$9,231.00$9,700.00$12,200$9,200.00$11,400$9,350.00
197 (683.04205010)1$64,447$46,000$58,200$44,200$54,000$44,650
198 (683.07021210)1,640$11.60$12.00$15.00$11.60$14.00$12.00
199 (683.07100010)3,975$4.70$5.00$6.20$5.00$5.00$5.00
200 (683.07101210)1$1,301.00$1,365.00$1,714.00$1,301.00$1,600.00$1,315.00
201 (683.07202410)1,600$5.00$5.25$6.60$5.00$6.00$5.05
202 (683.07206010)2,350$7.00$7.35$9.20$7.00$9.00$7.50
203 (683.10340010)1$1,922.00$2,020.00$2,532.00$1,922.00$2,400.00$1,950.00
204 (683.94000404)510$34.00$36.00$45.00$34.00$42.00$35.00
205 (683.96050308)2$5,024.00$5,275.00$6,618.00$5,024.00$6,220.00$5,075.00
206 (683.96100705)480$55.00$58.00$72.00$55.00$68.00$56.00
207 (685.07200110)12,236$0.78$0.85$1.05$1.00$1.00$0.78
208 (685.07200310)4$165.00$175.00$217.00$165.00$195.00$165.00
209 (685.07200410)10,752$1.80$1.90$2.35$2.00$2.15$1.80
210 (685.07200610)4,121$0.78$0.85$1.05$1.00$1.00$0.78
211 (685.16010014)34,292$1.59$1.75$2.10$2.00$1.80$1.59
212 (685.17010014)9,947$1.59$1.75$2.10$2.00$1.80$1.59
213 (691.04000020)145,000$1.00$1.00$1.00$1.00$1.00$1.00
214Field Change Payment (FCP) (697.03)DOL2,054,287$1.00$1.00$1.00$1.00$1.00$1.00
215Asphalt Price Adjustment (698.04)DOL2,391$1.00$1.00$1.00$1.00$1.00$1.00
216Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
217Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
218Mobilization (699.040001)LS1$1,350,000$1,450,000$1,500,000$1,675,149$1,700,000$1,500,000
NYSDOT contract D265809: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy