NYSDOT contract D265542 bid tabulation
Bridge Repairs at Various Locations, Town of Hempstead. Let by New York State DOT on September 11, 2025, Nassau, Region 10. 6 bids received; low bid $15,973,000 by H & L Contracting LLC.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 77
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H & L Contracting LLC | $15,973,000 | Low |
| 2 | Posillico Civil Inc | $16,136,019 | +1.0% |
| 3 | Grace Industries LLC | $16,544,155 | +4.0% |
| 4 | Triumph Construction Corp | $18,238,173 | +14% |
| 5 | Tully Construction Company Inc | $19,926,470 | +25% |
| 6 | C.A.C. Industries Inc | $22,653,000 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H & L Contracting LLC | 2. Posillico Civil Inc | 3. Grace Industries LLC | 4. Triumph Construction Corp | 5. Tully Construction Company Inc | 6. C.A.C. Industries Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $75,000 | $85,000 | $40,000 | $10,000 | $90,000 |
| 2 | Removal of Concrete Superstructure Supported Concrete Slabs (with shear connectors) (202.24) | SF | 970 | $350.00 | $242.00 | $130.00 | $118.00 | $220.00 | $117.00 |
| 3 | Removal of Concrete Superstructure Supported Concrete Slabs (without shear connectors) (202.25) | SF | 1,880 | $400.00 | $154.00 | $120.00 | $56.00 | $92.00 | $72.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 80 | $750.00 | $265.00 | $230.00 | $181.00 | $245.00 | $486.00 |
| 5 | (206.03120010) | 1,375 | $101.00 | $101.00 | $48.00 | $43.00 | $14.00 | $117.00 | |
| 6 | (304.10119917) | 40 | $59.00 | $290.00 | $146.00 | $119.00 | $100.00 | $207.00 | |
| 7 | (404.0681) | TON | 30 | $190.00 | $500.00 | $470.00 | $241.00 | $900.00 | $792.00 |
| 8 | (404.1979) | TON | 50 | $190.00 | $600.00 | $350.00 | $195.00 | $600.00 | $513.00 |
| 9 | (404.4189) | TON | 40 | $650.00 | $1,000.00 | $500.00 | $251.00 | $700.00 | $900.00 |
| 10 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 880 | $6.00 | $6.00 | $7.50 | $4.50 | $2.00 | $9.00 |
| 11 | Miscellaneous Cold Milling of Portland Cement Concrete (490.40) | SY | 12,680 | $35.00 | $19.00 | $11.00 | $27.00 | $9.00 | $9.00 |
| 12 | Bump Grinding - PCC with Slurry Removal (505.0102) | SY | 11,570 | $13.47 | $21.00 | $16.00 | $11.00 | $15.50 | $13.50 |
| 13 | Concrete for Structures, Performance - Internal Cure (555.0022) | CY | 34 | $27,000 | $28,700 | $8,700.00 | $26,600 | $15,000 | $54,000 |
| 14 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 15 | Epoxy-Coated Steel Fabric Reinforcement (556.0102) | SY | 2,370 | $35.00 | $31.00 | $40.00 | $9.00 | $15.00 | $13.50 |
| 16 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 14,850 | $4.00 | $2.50 | $4.50 | $5.00 | $10.00 | $2.70 |
| 17 | (557.1111) | SY | 130 | $550.00 | $720.00 | $645.00 | $1,225.00 | $1,350.00 | $6,300.00 |
| 18 | (557.67010311) | 9,000 | $287.00 | $157.00 | $355.00 | $355.00 | $290.00 | $279.00 | |
| 19 | (557.67010411) | 900 | $400.00 | $360.00 | $435.00 | $633.00 | $740.00 | $630.00 | |
| 20 | (557.67010511) | 26 | $1,000.00 | $1,300.00 | $660.00 | $512.00 | $900.00 | $5,400.00 | |
| 21 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $28.42 | $28.42 | $28.42 | $28.42 | $28.42 | $28.42 |
| 22 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 11,570 | $12.00 | $9.00 | $8.00 | $7.00 | $17.00 | $9.00 |
| 23 | Armorless Bridge Joint (567.60) | LF | 320 | $440.00 | $235.00 | $440.00 | $662.00 | $620.00 | $630.00 |
| 24 | Bridge Joint Seal (567.63) | LF | 870 | $145.00 | $125.00 | $100.00 | $163.00 | $90.00 | $135.00 |
| 25 | (567.80000011) | 360 | $110.00 | $110.00 | $75.00 | $144.00 | $80.00 | $117.00 | |
| 26 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 2,860 | $409.00 | $597.00 | $600.00 | $569.00 | $504.00 | $540.00 |
| 27 | Transition Bridge Railing (568.70) | LF | 216 | $395.00 | $415.00 | $565.00 | $477.00 | $350.00 | $495.00 |
| 28 | Permanent Concrete Traffic Barrier for Structures (Full Section) (569.01) | LF | 52 | $1,500.00 | $1,980.00 | $520.00 | $434.00 | $1,270.00 | $2,178.00 |
| 29 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $31.50 | $31.50 | $31.50 | $31.50 | $31.50 | $31.50 |
| 30 | Removal of Structural Concrete (580.01) | CY | 44 | $15,000 | $7,500.00 | $4,000.00 | $9,105.00 | $26,000 | $45,000 |
| 31 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 22 | $1,145.00 | $3,895.00 | $589.00 | $9,376.00 | $3,400.00 | $6,300.00 |
| 32 | (582.99000016) | 300 | $45.00 | $40.00 | $65.00 | $153.01 | $33.00 | $72.00 | |
| 33 | (584.40000005) | 41,100 | $22.55 | $22.00 | $27.00 | $27.00 | $30.00 | $22.50 | |
| 34 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 3,510 | $125.00 | $82.00 | $55.00 | $67.00 | $80.00 | $180.00 |
| 35 | Bridge Railing Removal and Disposal (587.01) | LF | 2,860 | $55.00 | $185.00 | $150.00 | $59.00 | $34.00 | $54.00 |
| 36 | Box Beam Guide Railing (606.10) | LF | 360 | $80.00 | $84.00 | $114.00 | $163.00 | $75.00 | $99.00 |
| 37 | Box Beam End Piece (606.120101) | EACH | 4 | $1,600.00 | $1,680.00 | $2,292.00 | $2,615.00 | $575.00 | $2,700.00 |
| 38 | Concrete Barrier Type A (Cast-in-Place) (606.3021) | LF | 200 | $840.00 | $410.00 | $250.00 | $307.00 | $500.00 | $675.00 |
| 39 | (606.47970010) | 200 | $345.00 | $363.00 | $496.00 | $209.00 | $225.00 | $450.00 | |
| 40 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 600 | $15.00 | $37.50 | $70.00 | $42.00 | $12.00 | $54.00 |
| 41 | Removing and Disposing Concrete Barrier (606.75) | LF | 200 | $50.00 | $200.00 | $35.00 | $32.00 | $90.00 | $153.00 |
| 42 | (606.80000010) | 200 | $15.00 | $53.00 | $33.00 | $50.00 | $14.00 | $144.00 | |
| 43 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,600,546 | $2,680,000 | $1,000,000 | $2,162,000 | $4,380,000 | $2,070,000 |
| 44 | Type III Construction Barricades (619.04) | EACH | 100 | $110.00 | $155.00 | $101.00 | $168.00 | $90.00 | $333.00 |
| 45 | (619.080102) | LF | 16,280 | $1.65 | $1.65 | $2.00 | $2.00 | $1.65 | $2.70 |
| 46 | (619.100104) | LF | 28,600 | $2.95 | $2.95 | $3.50 | $4.00 | $3.00 | $4.50 |
| 47 | (619.100204) | EACH | 4 | $95.00 | $95.00 | $118.00 | $124.00 | $95.00 | $108.00 |
| 48 | (619.10050020) | 1,560 | $5.00 | $50.00 | $25.00 | $7.00 | $50.00 | $63.00 | |
| 49 | (619.110712) | EACH | 7 | $9,532.00 | $10,000 | $5,500.00 | $37,586 | $11,400 | $36,000 |
| 50 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 4,300 | $93.00 | $100.00 | $75.00 | $196.00 | $135.00 | $333.00 |
| 51 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 240 | $165.00 | $70.00 | $150.00 | $49.00 | $45.00 | $180.00 |
| 52 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 6 | $18,000 | $20,000 | $30,000 | $8,215.00 | $12,500 | $45,000 |
| 53 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $170,000 | $480,000 | $500,000 | $141,391 | $610,000 | $810,000 |
| 54 | Survey Operations (625.01) | LS | 1 | $25,000 | $180,000 | $258,638 | $115,721 | $59,000 | $360,000 |
| 55 | (625.09010015) | LS | 1 | $1,000.00 | $5,000.00 | $10,000 | $6,538.00 | $7,000.00 | $72,000 |
| 56 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $3,500.00 | $6,000.00 | $3,482.00 | $8,310.00 | $4,000.00 | $2,700.00 |
| 57 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 27 | $6,500.00 | $8,180.00 | $9,300.00 | $12,632 | $9,000.00 | $13,500 |
| 58 | Office Technology and Supplies (637.34) | DOL | 22,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 59 | (639.21010011) | LS | 1 | $25,000 | $35,250 | $50,000 | $42,497 | $30,000 | $43,200 |
| 60 | (665.98000103) | LS | 1 | $225,000 | $80,400 | $750,000 | $643,333 | $600,000 | $54,000 |
| 61 | (670.2005) | LF | 750 | $69.00 | $69.00 | $277.00 | $275.00 | $215.00 | $450.00 |
| 62 | (670.2305) | LF | 2,280 | $101.00 | $101.00 | $210.00 | $123.00 | $95.00 | $99.00 |
| 63 | (670.2306) | LF | 110 | $165.00 | $165.00 | $262.00 | $189.00 | $145.00 | $180.00 |
| 64 | (670.7003) | LF | 9,930 | $5.40 | $5.40 | $24.00 | $11.00 | $8.50 | $9.00 |
| 65 | (670.7005) | LF | 5,650 | $3.25 | $3.25 | $22.00 | $6.00 | $4.30 | $5.40 |
| 66 | Ground Wire No. 6 AWG. (670.7501) | LF | 3,310 | $4.50 | $4.50 | $23.00 | $8.00 | $6.50 | $8.10 |
| 67 | (670.75020025) | 1,780 | $3.25 | $3.25 | $22.00 | $6.00 | $5.00 | $9.00 | |
| 68 | (680.53000111) | 14 | $3,770.00 | $3,770.00 | $5,300.00 | $2,615.00 | $2,000.00 | $3,600.00 | |
| 69 | (680.83200010) | LS | 1 | $5,000.00 | $5,000.00 | $6,200.00 | $49,741 | $9,000.00 | $27,000 |
| 70 | (685.07150110) | 9,020 | $0.85 | $0.85 | $1.00 | $1.00 | $1.00 | $1.80 | |
| 71 | (685.07150610) | 7,260 | $0.85 | $0.85 | $1.00 | $1.00 | $1.00 | $1.80 | |
| 72 | (691.04000020) | 144,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 73 | Field Change Payment (FCP) (697.03) | DOL | 1,405,853 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 74 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 75 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 77 | Mobilization (699.040001) | LS | 1 | $610,000 | $620,616 | $630,000 | $660,000 | $765,000 | $844,223 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.