NYSDOT contract D265686 bid tabulation
PAVEMENT REHABILITATION - Routes 987F-SH 9480, 987G-SH 9488. Let by New York State DOT on January 8, 2026, Westchester, Region 08. 6 bids received; low bid $35,411,130 by Yonkers Contracting Company Inc.
- Owner
- New York State DOT
- Letting
- 08 JAN 2026
- Pay items
- 55
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Yonkers Contracting Company Inc | $35,411,130 | Low |
| 2 | Grace Industries LLC | $35,949,000 | +2.0% |
| 3 | Ecco III Enterprises Inc | $38,894,000 | +10% |
| 4 | Bove Industries Inc | $40,580,000 | +15% |
| 5 | Crisdel Group Inc | $54,193,599 | +53% |
| 6 | Jrcruz Corp | $63,467,980 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Yonkers Contracting Company Inc | 2. Grace Industries LLC | 3. Ecco III Enterprises Inc | 4. Bove Industries Inc | 5. Crisdel Group Inc | 6. Jrcruz Corp |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 8,700 | $250.00 | $125.70 | $120.00 | $195.00 | $179.87 | $140.00 |
| 2 | (304.00010018) | 349,580 | $1.00 | $0.20 | $1.00 | $1.00 | $2.39 | $2.00 | |
| 3 | (304.11000008) | 3,480 | $250.00 | $110.00 | $185.00 | $100.00 | $199.42 | $150.00 | |
| 4 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 5 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 360 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 6 | (404.0179) | TON | 270 | $200.00 | $230.00 | $256.00 | $250.00 | $288.21 | $250.00 |
| 7 | (404.1969) | TON | 7,610 | $250.00 | $205.00 | $325.00 | $230.00 | $193.78 | $200.00 |
| 8 | (406.0961) | TON | 10,350 | $200.00 | $230.00 | $185.00 | $235.00 | $228.37 | $210.00 |
| 9 | Straight Tack Coat (407.0103) | GAL | 5,280 | $12.00 | $5.00 | $25.00 | $15.00 | $4.94 | $10.00 |
| 10 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 96,000 | $1.35 | $0.20 | $1.25 | $1.50 | $0.84 | $0.60 |
| 11 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 46,900 | $12.00 | $11.00 | $9.50 | $10.00 | $15.74 | $10.00 |
| 12 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,370 | $50.00 | $51.00 | $85.00 | $135.00 | $70.68 | $20.00 |
| 13 | Production Grinding – Pavement Preservation with Slurry Removal (505.0402) | SY | 262,640 | $6.75 | $10.00 | $15.00 | $8.75 | $6.25 | $10.50 |
| 14 | (510.00210018) | 9,720 | $600.00 | $1,025.00 | $800.00 | $1,350.00 | $1,084.99 | $2,750.00 | |
| 15 | (510.20000018) | 38,850 | $130.00 | $94.00 | $185.00 | $150.00 | $174.91 | $250.00 | |
| 16 | (510.81000018) | 50,750 | $12.00 | $12.50 | $20.00 | $35.00 | $39.93 | $60.00 | |
| 17 | (510.81100018) | 5,230 | $80.00 | $8.00 | $55.00 | $32.00 | $56.95 | $60.00 | |
| 18 | (510.90010018) | 105,690 | $9.00 | $10.00 | $5.50 | $7.50 | $5.54 | $9.00 | |
| 19 | (510.91000018) | 7,550 | $35.00 | $25.00 | $6.50 | $15.00 | $19.74 | $60.00 | |
| 20 | (511.50000018) | 6,400 | $225.00 | $195.00 | $241.00 | $228.00 | $298.21 | $228.00 | |
| 21 | (604.070801) | EACH | 15 | $8,000.00 | $2,100.00 | $3,500.00 | $3,800.00 | $2,195.83 | $1,800.00 |
| 22 | (604.07290010) | 430 | $170.00 | $95.00 | $125.00 | $300.00 | $243.39 | $150.00 | |
| 23 | (604.07600008) | 30 | $12,500 | $3,700.00 | $8,000.00 | $6,100.00 | $2,985.95 | $5,000.00 | |
| 24 | (604.07610008) | 81 | $12,900 | $5,750.00 | $9,600.00 | $6,200.00 | $3,305.28 | $5,500.00 | |
| 25 | (609.12290008) | 1,900 | $350.00 | $178.52 | $110.00 | $102.00 | $207.45 | $150.00 | |
| 26 | Turf Establishment – Performance (610.1605) | SY | 400 | $20.00 | $20.00 | $63.00 | $20.00 | $27.42 | $10.00 |
| 27 | Basic Work Zone Traffic Control (Daily Operations) (619.0101) | LS | 1 | $2,162,000 | $3,121,426 | $3,233,597 | $1,345,506 | $9,900,000 | $4,050,000 |
| 28 | (619.0901) | LF | 307,900 | $0.40 | $0.50 | $0.30 | $0.29 | $0.32 | $0.90 |
| 29 | (619.110511) | EACH | 4 | $17,000 | $40,000 | $25,000 | $20,000 | $27,419 | $12,000 |
| 30 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 1 | $500.00 | $1,000.00 | $650.00 | $650.00 | $712.89 | $15,000 |
| 31 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $913,000 | $1,100,000 | $390,000 | $300,000 | $5,540,000 | $500,000 |
| 32 | Traffic Control Supervisor (619.25) | MONTH | 20 | $5,000.00 | $15,000 | $115.00 | $1,500.00 | $20,000 | $12,500 |
| 33 | Cleaning Closed Drainage Systems (621.03) | LF | 13,800 | $18.00 | $14.00 | $9.00 | $8.50 | $60.32 | $9.00 |
| 34 | Cleaning Drainage Structures (621.04) | EACH | 280 | $750.00 | $800.00 | $200.00 | $775.00 | $548.38 | $750.00 |
| 35 | Survey Operations (625.01) | LS | 1 | $275,000 | $150,000 | $225,000 | $275,000 | $215,000 | $200,000 |
| 36 | (627.50140008) | 4,600 | $25.00 | $2.50 | $2.75 | $2.00 | $4.74 | $7.00 | |
| 37 | (633.05040008) | LS | 1 | $750,000 | $180,000 | $110,000 | $300,000 | $135,571 | $25,000 |
| 38 | (635.13010011) | 307,900 | $0.50 | $0.60 | $0.45 | $0.42 | $0.46 | $1.00 | |
| 39 | Engineer’s Field Office – Type 4 (637.14) | MONTH | 24 | $11,000 | $5,500.00 | $9,000.00 | $14,000 | $8,856.41 | $10,150 |
| 40 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 60,230 | $1.00 | $0.50 | $0.95 | $0.50 | $0.54 | $0.80 |
| 42 | (655.30010010) | 15 | $2,500.00 | $2,000.00 | $3,300.00 | $1,595.00 | $1,754.80 | $1,450.00 | |
| 43 | (680.05010007) | 1 | $24,640 | $30,000 | $25,000 | $24,640 | $27,024 | $35,000 | |
| 44 | (680.05020007) | 1 | $4,250.00 | $5,100.00 | $4,250.00 | $4,250.00 | $4,661.19 | $10,000 | |
| 45 | (680.51200208) | 4 | $900.00 | $2,600.00 | $2,600.00 | $500.00 | $1,645.13 | $2,500.00 | |
| 46 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 14,200 | $2.85 | $3.40 | $0.65 | $0.64 | $0.70 | $1.00 |
| 47 | (685.16010014) | 199,600 | $2.00 | $2.40 | $1.00 | $0.98 | $1.07 | $0.90 | |
| 48 | (685.17010014) | 108,300 | $2.00 | $2.40 | $1.00 | $0.98 | $1.07 | $0.90 | |
| 49 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 11,000 | $2.85 | $3.40 | $2.60 | $2.60 | $2.85 | $1.00 |
| 50 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 15 | $250.00 | $300.00 | $250.00 | $250.00 | $274.19 | $150.00 |
| 51 | Field Change Payment (FCP) (697.03) | DOL | 1,000,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 52 | Asphalt Price Adjustment (698.04) | DOL | 21,270 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Fuel Price Adjustment (698.05) | DOL | 9,960 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 55 | Mobilization (699.040001) | LS | 1 | $1,200,000 | $1,376,640 | $1,480,000 | $1,550,000 | $2,000,000 | $2,441,076 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.