NYSDOT contract D265783 bid tabulation
WALL REPAIR: ROUTE 22 - SCARSDALE. Let by New York State DOT on May 21, 2026, Westchester, Region 08. 3 bids received; low bid $5,020,668 by Defoe Corporation.
- Owner
- New York State DOT
- Letting
- 21 MAY 2026
- Pay items
- 81
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Defoe Corporation | $5,020,668 | Low |
| 2 | Montesano Bros Inc | $5,812,231 | +16% |
| 3 | SPC Construction Co LLC | $5,879,000 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Defoe Corporation | 2. Montesano Bros Inc | 3. SPC Construction Co LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $300,000 | $255,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 600 | $300.00 | $240.00 | $350.00 |
| 3 | Select Granular Fill (203.07) | CY | 12 | $100.00 | $368.00 | $300.00 |
| 4 | Sand Backfill (203.25) | CY | 13 | $130.00 | $400.00 | $375.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 85 | $109.00 | $190.00 | $300.00 |
| 6 | Mulch – Temporary (209.100101) | SY | 360 | $4.20 | $30.00 | $10.00 |
| 7 | Seed – Temporary (209.100102) | SY | 360 | $4.20 | $9.00 | $12.00 |
| 8 | Sediment Filter Log - Temporary, 12”, Type B (209.1312) | LF | 500 | $155.00 | $25.00 | $20.00 |
| 9 | (304.11000008) | 3 | $500.00 | $250.00 | $275.00 | |
| 10 | (404.1271) | TON | 190 | $400.00 | $310.00 | $300.00 |
| 11 | (404.1989) | TON | 2 | $1,050.00 | $1,500.00 | $2,200.00 |
| 12 | (404.3789) | TON | 2 | $1,050.00 | $900.00 | $2,200.00 |
| 13 | Straight Tack Coat (407.0103) | GAL | 830 | $44.00 | $8.00 | $42.00 |
| 14 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,300 | $5.00 | $3.90 | $4.00 |
| 15 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 1,550 | $17.00 | $19.00 | $20.00 |
| 16 | PCC Foundation for Pavement, HES Concrete (503.1012) | CY | 35 | $1,600.00 | $450.00 | $800.00 |
| 17 | Shields and Shoring (552.17) | SF | 500 | $33.00 | $7.00 | $30.00 |
| 18 | (552.2001) | LF | 1,000 | $400.00 | $410.00 | $550.00 |
| 19 | (552.2101) | LF | 232 | $1,600.00 | $1,460.00 | $1,650.00 |
| 20 | (552.2201) | LF | 1,300 | $293.00 | $290.00 | $650.00 |
| 21 | (552.230301) | SF | 1,300 | $85.00 | $95.00 | $110.00 |
| 22 | (552.230302) | SF | 3,500 | $85.00 | $170.00 | $120.00 |
| 23 | Concrete for Structures, Performance (555.0021) | CY | 16 | $3,300.00 | $4,180.00 | $3,400.00 |
| 24 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $15.00 | $15.00 | $15.00 |
| 25 | Epoxy-Coated Steel Fabric Reinforcement (556.0102) | SY | 100 | $100.00 | $35.00 | $25.00 |
| 26 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 285 | $11.00 | $3.70 | $15.00 |
| 27 | (560.13000001) | 270 | $4,200.00 | $5,100.00 | $4,300.00 | |
| 28 | Underdrain Filter, Type II (605.1001) | CY | 72 | $100.00 | $175.00 | $325.00 |
| 29 | (605.1502) | LF | 480 | $100.00 | $95.00 | $30.00 |
| 30 | (607.0512) | LF | 165 | $141.60 | $99.00 | $155.00 |
| 31 | (607.11000008) | 550 | $72.45 | $90.00 | $30.00 | |
| 32 | (607.99870011) | 148 | $79.00 | $30.00 | $60.00 | |
| 33 | Concrete Sidewalks and Driveways (608.0101) | CY | 60 | $1,455.00 | $900.00 | $1,500.00 |
| 34 | (608.02010015) | 130 | $400.00 | $145.00 | $300.00 | |
| 35 | (608.02020015) | 155 | $250.00 | $95.00 | $300.00 | |
| 36 | (608.93010005) | 20 | $1,941.00 | $150.00 | $100.00 | |
| 37 | (609.0401) | LF | 480 | $100.00 | $70.00 | $75.00 |
| 38 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 13 | $100.00 | $80.00 | $120.00 |
| 39 | Topsoil - Roadside (610.1402) | CY | 26 | $189.00 | $110.00 | $180.00 |
| 40 | Turf Establishment - Roadside (610.1601) | SY | 142 | $10.50 | $27.00 | $15.00 |
| 41 | Sodding (610.18) | SY | 11 | $21.00 | $225.00 | $100.00 |
| 42 | Watering Vegetation (610.19) | 1,000 GALLONS | 8 | $445.00 | $250.00 | $300.00 |
| 43 | (611.0131) | EACH | 24 | $683.00 | $700.00 | $1,000.00 |
| 44 | (611.0231) | EACH | 11 | $395.00 | $450.00 | $800.00 |
| 45 | (611.0331) | EACH | 14 | $395.00 | $350.00 | $800.00 |
| 46 | (611.0422) | EACH | 31 | $95.00 | $70.00 | $200.00 |
| 47 | (611.0451) | EACH | 3 | $263.00 | $200.00 | $500.00 |
| 48 | Rodent Guard (611.21) | EACH | 24 | $210.00 | $180.00 | $150.00 |
| 49 | (617.11000024) | LS | 1 | $25,000 | $3,500.00 | $3,300.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $320,000 | $575,000 | $100,000 |
| 51 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 950 | $4.75 | $6.00 | $4.50 |
| 52 | (619.100103) | LF | 2,200 | $3.50 | $4.90 | $3.25 |
| 53 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 760 | $66.00 | $325.00 | $325.00 |
| 54 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 39 | $195.00 | $100.00 | $150.00 |
| 55 | Stone Filling (Light) (620.03) | CY | 244 | $240.00 | $195.00 | $275.00 |
| 56 | Crushed Stone (In-Place Measure) (623.12) | CY | 150 | $190.00 | $145.00 | $275.00 |
| 57 | Survey Operations (625.01) | LS | 1 | $150,000 | $150,000 | $59,489 |
| 58 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 10 | $600.00 | $2,000.00 | $2,100.00 |
| 59 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 2 | $265.00 | $1,300.00 | $5,000.00 |
| 60 | (627.50140008) | 1,669 | $5.00 | $4.50 | $4.50 | |
| 61 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 3,320 | $1.50 | $1.80 | $1.50 |
| 62 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,900.00 | $5,000.00 | $5,000.00 |
| 63 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 6 | $10,000 | $5,500.00 | $30,000 |
| 64 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 65 | (637.41000115) | 6 | $516.00 | $575.00 | $775.00 | |
| 66 | (637.41000215) | 6 | $516.00 | $575.00 | $775.00 | |
| 67 | (655.05010010) | 6 | $2,400.00 | $1,500.00 | $2,000.00 | |
| 68 | (662.60030008) | 3 | $2,400.00 | $500.00 | $1,200.00 | |
| 69 | (663.0603) | LF | 50 | $625.00 | $200.00 | $250.00 |
| 70 | (663.2503) | EACH | 2 | $3,500.00 | $3,000.00 | $12,000 |
| 71 | (663.2603) | EACH | 2 | $6,200.00 | $750.00 | $4,200.00 |
| 72 | Adjust Existing Valve Box Elevation (663.33) | EACH | 1 | $4,623.50 | $1,500.00 | $1,400.00 |
| 73 | Disconnect and Cap Existing Water Main (663.40) | EACH | 2 | $6,250.00 | $2,600.00 | $3,200.00 |
| 74 | White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101) | LF | 600 | $1.50 | $2.00 | $1.50 |
| 75 | Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201) | LF | 2,200 | $1.50 | $2.00 | $1.50 |
| 76 | Field Change Payment (FCP) (697.03) | DOL | 161,000 | $1.00 | $1.00 | $1.00 |
| 77 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 78 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 79 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 80 | (698.93940008) | LS | 1 | $40,000 | $40,000 | $40,000 |
| 81 | Mobilization (699.040001) | LS | 1 | $185,000 | $210,000 | $200,001 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 21, 2026. Compiled by Mirage Metrics.