Gianfia Corp: NYSDOT bid record

Gianfia Corp submitted 11 bids on New York State DOT contracts in the data, from 15 DEC 2022 to 27 AUG 2026, and was the low bidder on 1 of them (9%). When it was not low, its total sat a median +26% above the low bid.

Owner
New York State DOT
Low bid volume
$3,538,522
Latest bid
27 AUG 2026
Data through
15 OCT 2026
11Bids
1Low bids
9Win rate, percent
+26%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
2022100%
2023100%
20246117%
2025100%
2026200%
Gianfia Corp, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 0810110%
Region 11100%
Gianfia Corp, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL1111 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL1010 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1010 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1010 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL99 (100%)$1.00$1.00
691.0400002088 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT66 (100%)$110.00$85.00
Partnering Workshop637.35DOL66 (100%)$1.00$1.00
White Epoxy Reflectorized Pavement Stripes - 20 mil685.1102LF65 (83%)$0.81$1.45
Pavement Density Quality Adjustment to Asphalt Items404.000021QUALITY UNIT55 (100%)$110.00$85.00
Asphalt Pavement Joint Adhesive418.7603LF94 (44%)$2.00$1.00
Yellow Epoxy Reflectorized Pavement Stripes - 20 mil685.1202LF64 (67%)$0.73$1.15
Gianfia Corp, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
McNamee Construction Corp53 of 5
Harrison & Burrowes Bridge Constructors Inc42 of 4
Ecco III Enterprises Inc43 of 4
Jrcruz Corp31 of 3
VMR Civil LLC30 of 3
Morano Brothers Corp32 of 3
Northbrook Contracting Corp31 of 3
A Servidone Inc/B Anthony Construction Corp JV31 of 3
John Civetta & Sons Inc21 of 2
Transit Construction Corp21 of 2
Gianfia Corp, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
27 AUG 2026D265828Region 08Standby Where & When Highway5 of 6$6,334,991+10%
05 MAR 2026D265693Region 08BRIDGE REPLACEMENTS - Ramp G of I-84 over I-84 & 6845 of 5$30,357,890+24%
09 JAN 2025D265367Region 08Bridge Deck Replacement5 of 7$9,557,916+29%
22 AUG 2024D265301Region 08BRIDGE REHABILITATION - I-84, Various Locations3 of 4$6,007,916+27%
25 APR 2024D265238Region 08Route 9D Breakneck Tunnel Lighting Replacement1 of 2$3,538,522Low, 41% under the second
28 MAR 2024D265217Region 08Highway Reconstruction US Rt 6 at Annsville Circle5 of 6$29,928,672+25%
14 MAR 2024D265160Region 08BRIDGE REHABILITATIONS - Routes 52 & 304, and Illington Rd3 of 8$19,261,134+11%
29 FEB 2024D265198Region 08Route 45 Complete Streets Improvements2 of 2$15,454,141+41%
08 FEB 2024D265201Region 08RT 376 (Raymond Ave) at Hooker Ave Intersection Improvements5 of 11$13,318,221+17%
19 JAN 2023D264967Region 08TACONIC STATE PARKWAY5 of 8$3,737,054+99%
15 DEC 2022D264916Region 11Reconstruction of two SB Henry Hudson Parkway Retaining wall9 of 11$9,925,080+46%
Gianfia Corp: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy