NYSDOT contract D265693 bid tabulation
BRIDGE REPLACEMENTS - Ramp G of I-84 over I-84 & 684. Let by New York State DOT on March 5, 2026, Putnam, Region 08. 5 bids received; low bid $24,492,000 by Ecco III Enterprises Inc.
- Owner
- New York State DOT
- Letting
- 05 MAR 2026
- Pay items
- 131
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ecco III Enterprises Inc | $24,492,000 | Low |
| 2 | McNamee Construction Corp | $27,674,000 | +13% |
| 3 | Defoe Corporation | $28,652,712 | +17% |
| 4 | Harrison & Burrowes Bridge Constructors Inc | $28,782,288 | +18% |
| 5 | Gianfia Corp | $30,357,890 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ecco III Enterprises Inc | 2. McNamee Construction Corp | 3. Defoe Corporation | 4. Harrison & Burrowes Bridge Constructors Inc | 5. Gianfia Corp |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $150,000 | $50,000 | $350,000 | $95,000 |
| 2 | (202.120001) | LS | 1 | $500,000 | $1,000,000 | $1,200,000 | $875,000 | $500,000 |
| 3 | (202.120002) | LS | 1 | $1,000,000 | $1,000,000 | $1,200,000 | $875,000 | $500,000 |
| 4 | Removal of Substructures (202.19) | CY | 453 | $420.00 | $250.00 | $400.00 | $175.00 | $260.00 |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 987 | $60.00 | $100.00 | $180.00 | $45.00 | $180.00 |
| 6 | Embankment In Place (203.03) | CY | 11,501 | $40.00 | $75.00 | $55.00 | $78.00 | $65.00 |
| 7 | Select Granular Fill (203.07) | CY | 402 | $52.00 | $125.00 | $50.00 | $85.00 | $80.00 |
| 8 | Select Structural Fill (203.21) | CY | 1,060 | $80.00 | $125.00 | $80.00 | $110.00 | $130.00 |
| 9 | Structure Excavation (206.01) | CY | 4,140 | $50.00 | $100.00 | $85.00 | $41.00 | $75.00 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 952 | $20.00 | $125.00 | $55.00 | $50.00 | $175.00 |
| 11 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 563 | $18.00 | $15.00 | $39.00 | $15.00 | $15.00 |
| 12 | Seed and Mulch – Temporary (209.1003) | SY | 1,434 | $4.00 | $5.00 | $15.00 | $3.00 | $2.00 |
| 13 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 720 | $57.00 | $15.00 | $190.00 | $75.00 | $45.00 |
| 14 | Silt Fence - Temporary (209.13) | LF | 3,555 | $13.00 | $8.00 | $16.00 | $9.00 | $10.00 |
| 15 | Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701) | LF | 132 | $55.00 | $20.00 | $500.00 | $23.00 | $13.00 |
| 16 | Stabilized Construction Access (209.22) | SY | 900 | $90.00 | $50.00 | $85.00 | $62.00 | $60.00 |
| 17 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 110 | $300.00 | $200.00 | $215.00 | $235.00 | $218.00 |
| 18 | (210.481201) | SF | 1,440 | $15.00 | $25.00 | $20.00 | $85.00 | $25.00 |
| 19 | (304.11000008) | 1,371 | $125.00 | $125.00 | $130.00 | $170.00 | $150.00 | |
| 20 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 154 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 21 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 154 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 22 | (404.0179) | TON | 830 | $180.00 | $220.00 | $250.00 | $235.00 | $198.50 |
| 23 | (404.1271) | TON | 669 | $200.00 | $300.00 | $300.00 | $325.00 | $276.75 |
| 24 | (404.1979) | TON | 446 | $200.00 | $300.00 | $300.00 | $315.00 | $325.00 |
| 25 | (404.3779) | TON | 927 | $180.00 | $300.00 | $250.00 | $265.00 | $250.00 |
| 26 | Straight Tack Coat (407.0103) | GAL | 434 | $47.00 | $75.00 | $90.00 | $50.00 | $45.00 |
| 27 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,366 | $5.00 | $15.00 | $15.00 | $18.00 | $4.00 |
| 28 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 1,813 | $23.00 | $35.00 | $42.00 | $42.00 | $48.00 |
| 29 | Production Cold Milling of Portland Cement Concrete (490.20) | SY | 163 | $30.00 | $35.00 | $45.00 | $45.00 | $70.00 |
| 30 | (520.09000010) | 1,140 | $10.00 | $5.00 | $6.00 | $8.00 | $10.00 | |
| 31 | Cast-In-Place Concrete Piles (551.11) | LF | 5,660 | $200.00 | $215.00 | $250.00 | $265.00 | $215.00 |
| 32 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $300,000 | $740,000 | $513,500 | $550,000 | $560,000 |
| 33 | Splices for CIP Piles (551.15) | EACH | 123 | $200.00 | $2,000.00 | $2,750.00 | $1,000.00 | $4,700.00 |
| 34 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $15.78 | $15.78 | $15.78 | $15.78 | $15.78 |
| 35 | Shields and Shoring (552.17) | SF | 6,255 | $1.00 | $1.00 | $5.00 | $0.01 | $6.00 |
| 36 | (552.2001) | LF | 342 | $425.00 | $625.00 | $360.00 | $1.00 | $640.00 |
| 37 | (552.2002) | LF | 335 | $325.00 | $625.00 | $360.00 | $1.00 | $640.00 |
| 38 | (552.2201) | LF | 367 | $250.00 | $50.00 | $360.00 | $1.00 | $60.00 |
| 39 | (552.2202) | LF | 357 | $250.00 | $50.00 | $360.00 | $1.00 | $60.00 |
| 40 | (552.230201) | SF | 936 | $50.00 | $50.00 | $45.00 | $1.00 | $51.75 |
| 41 | (552.230202) | SF | 480 | $70.00 | $60.00 | $60.00 | $1.00 | $68.00 |
| 42 | (554.3001) | SF | 1,025 | $80.00 | $130.00 | $130.00 | $80.00 | $140.00 |
| 43 | Footing Concrete, Performance (555.0011) | CY | 272 | $1,200.00 | $2,200.00 | $700.00 | $1,650.00 | $1,400.00 |
| 44 | Concrete for Structures, Performance (555.0021) | CY | 713 | $2,000.00 | $2,300.00 | $1,600.00 | $2,650.00 | $1,700.00 |
| 45 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 46 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 47 | Stainless Steel Bar Reinforcement for Structures (556.0205) | LB | 134,680 | $4.00 | $5.00 | $4.50 | $4.40 | $4.00 |
| 48 | Stud Shear Connectors for Bridges (556.03) | EACH | 12,363 | $6.00 | $7.00 | $7.00 | $7.25 | $6.00 |
| 49 | (557.1011) | SY | 485 | $650.00 | $1,000.00 | $600.00 | $950.00 | $1,300.00 |
| 50 | (557.1111) | SY | 1,700 | $1,000.00 | $1,600.00 | $950.00 | $1,350.00 | $1,400.00 |
| 51 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 2,120 | $1.00 | $12.00 | $5.00 | $0.01 | $12.15 |
| 52 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $21.58 | $21.58 | $21.58 | $21.58 | $21.58 |
| 53 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 1,985 | $22.00 | $10.00 | $20.00 | $22.00 | $23.17 |
| 54 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 17,862 | $1.10 | $2.00 | $1.50 | $0.75 | $1.35 |
| 55 | Protective Sealing of New Structural Concrete (559.02) | SF | 8,597 | $1.10 | $2.00 | $2.50 | $0.85 | $2.25 |
| 56 | (564.0501) | LS | 1 | $2,000,000 | $2,400,000 | $2,600,000 | $2,550,000 | $2,745,000 |
| 57 | (564.0502) | LS | 1 | $3,000,000 | $2,500,000 | $2,390,000 | $2,550,000 | $2,425,000 |
| 58 | Type E.B. Expansion Bearing (Over 225 k) (565.2035) | EACH | 12 | $7,500.00 | $3,000.00 | $4,000.00 | $4,000.00 | $5,200.00 |
| 59 | (565.30130101) | 24 | $300.00 | $200.00 | $1,000.00 | $725.00 | $790.00 | |
| 60 | Armorless Bridge Joint (567.60) | LF | 140 | $325.00 | $600.00 | $350.00 | $450.00 | $450.00 |
| 61 | Transition Bridge Railing (568.70) | LF | 320 | $250.88 | $300.00 | $260.00 | $300.00 | $250.88 |
| 62 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 811 | $560.00 | $700.00 | $450.00 | $385.00 | $525.00 |
| 63 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $14.88 | $14.88 | $14.88 | $14.88 | $14.88 |
| 64 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,000.00 | $2,000.00 | $2,100.00 | $1,500.00 | $2,500.00 |
| 65 | Medical Testing (570.02) | DOL | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Decontamination Facilities (570.04) | CALENDAR WEEK | 8 | $840.13 | $500.00 | $525.00 | $500.00 | $2,500.00 |
| 68 | (570.090001) | LS | 1 | $7,500.00 | $1.00 | $1.00 | $1.00 | $10,000 |
| 69 | (570.090002) | LS | 1 | $7,500.00 | $1.00 | $1.00 | $1.00 | $10,000 |
| 70 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 551 | $6.50 | $1.00 | $10.00 | $7.00 | $10.00 |
| 71 | (572.00020101) | LS | 1 | $200,000 | $500,000 | $285,000 | $450,000 | $194,000 |
| 72 | (572.00020201) | LS | 1 | $175,000 | $500,000 | $255,000 | $450,000 | $155,000 |
| 73 | (585.01) | EACH | 4 | $25,000 | $20,000 | $16,500 | $10,000 | $22,585 |
| 74 | (585.02) | EACH | 2 | $25,000 | $20,000 | $17,000 | $10,000 | $26,787 |
| 75 | (603.6103) | LF | 193 | $250.00 | $100.00 | $480.00 | $145.00 | $62.00 |
| 76 | (603.6109) | LF | 199 | $350.00 | $150.00 | $290.00 | $325.00 | $214.00 |
| 77 | (603.97000002) | 2 | $3,500.00 | $500.00 | $5,000.00 | $500.00 | $975.00 | |
| 78 | (604.070101) | EACH | 1 | $4,000.00 | $2,000.00 | $4,600.00 | $1,000.00 | $4,300.00 |
| 79 | (604.310411) | LF | 9 | $1,000.00 | $1,200.00 | $2,250.00 | $1,500.00 | $2,200.00 |
| 80 | (604.310611) | LF | 7 | $1,500.00 | $1,200.00 | $2,600.00 | $1,550.00 | $2,200.00 |
| 81 | (604.4060) | LF | 31 | $800.00 | $1,200.00 | $2,100.00 | $1,100.00 | $1,500.00 |
| 82 | Box Beam Guide Railing (606.10) | LF | 3,626 | $61.24 | $60.00 | $65.00 | $75.00 | $61.24 |
| 83 | Box Beam End Piece (606.120101) | EACH | 8 | $1,301.19 | $1,000.00 | $1,500.00 | $1,600.00 | $1,301.19 |
| 84 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 6 | $7,166.05 | $8,000.00 | $7,250.00 | $9,000.00 | $7,166.05 |
| 85 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $9,460.72 | $15,000 | $9,750.00 | $11,500 | $9,460.72 |
| 86 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 3,366 | $19.40 | $15.00 | $20.00 | $15.00 | $19.40 |
| 87 | Removing and Disposing Concrete Barrier-Half Section (606.7510) | LF | 297 | $80.00 | $100.00 | $110.00 | $35.00 | $110.00 |
| 88 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 191 | $350.00 | $400.00 | $435.00 | $550.00 | $325.00 |
| 89 | Stone Curb – Bridge (Type A) (609.0301) | LF | 134 | $150.00 | $75.00 | $100.00 | $200.00 | $310.00 |
| 90 | Topsoil - Roadside (610.1402) | CY | 2,330 | $90.00 | $75.00 | $85.00 | $48.00 | $85.00 |
| 91 | Turf Establishment - Roadside (610.1601) | SY | 6,988 | $3.00 | $3.00 | $5.00 | $1.50 | $1.50 |
| 92 | (617.11000024) | LS | 1 | $8,000.00 | $5,000.00 | $5,250.00 | $1,500.00 | $7,500.00 |
| 93 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $2,286,796 | $978,050 | $3,299,000 | $3,560,714 | $2,430,000 |
| 94 | Type III Construction Barricades (619.04) | EACH | 12 | $400.00 | $300.00 | $460.00 | $150.00 | $200.00 |
| 95 | (619.080102) | LF | 2,500 | $1.28 | $2.00 | $2.00 | $2.10 | $1.75 |
| 96 | (619.100101) | LF | 9,120 | $1.52 | $1.00 | $0.50 | $0.58 | $1.30 |
| 97 | (619.110733) | EACH | 5 | $45,000 | $15,000 | $35,000 | $15,000 | $43,000 |
| 98 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 4,720 | $46.00 | $110.00 | $60.00 | $70.00 | $110.00 |
| 99 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 2,060 | $75.00 | $150.00 | $65.00 | $55.00 | $120.00 |
| 100 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 339 | $35.00 | $10.00 | $191.00 | $50.00 | $180.00 |
| 101 | Temporary Impact Attenuator - Gating (Test Level 3) (619.1813) | EACH | 10 | $9,500.00 | $10,000 | $12,500 | $7,500.00 | $12,000 |
| 102 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $250,000 | $200,000 | $145,000 | $475,000 | $2,000,000 |
| 103 | Traffic Control Supervisor (619.25) | MONTH | 30 | $40.00 | $1,000.00 | $6,500.00 | $100.00 | $25,000 |
| 104 | Pavement Patching (Force Acount) (619.2601) | DOL | 25,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 105 | Stone Filling (Light) (620.03) | CY | 27 | $210.00 | $200.00 | $250.00 | $300.00 | $215.00 |
| 106 | Bedding Material, Type 2 (620.0802) | CY | 30 | $175.00 | $200.00 | $350.00 | $275.00 | $228.00 |
| 107 | Concrete Block Slope Paving (620.09) | SY | 687 | $325.00 | $300.00 | $300.00 | $500.00 | $306.00 |
| 108 | (621.51000015) | 200 | $35.00 | $50.00 | $140.00 | $15.00 | $110.00 | |
| 109 | Survey Operations (625.01) | LS | 1 | $750,000 | $220,000 | $1,000,000 | $225,000 | $675,000 |
| 110 | (633.05050208) | LS | 1 | $4,000.00 | $15,000 | $90,000 | $3,500.00 | $35,000 |
| 111 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 163 | $15.00 | $50.00 | $250.00 | $25.00 | $175.00 |
| 112 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $7,300.00 | $5,000.00 | $1,800.00 | $2,500.00 | $4,500.00 |
| 113 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 30 | $6,000.00 | $6,000.00 | $8,500.00 | $7,000.00 | $14,350 |
| 114 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 115 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 116 | (639.21010011) | LS | 1 | $100,000 | $75,000 | $50,000 | $50,000 | $50,000 |
| 117 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 35 | $90.56 | $100.00 | $100.00 | $100.00 | $90.56 |
| 118 | Type A Sign Posts (645.81) | EACH | 4 | $756.48 | $300.00 | $850.00 | $800.00 | $756.48 |
| 119 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $294.91 | $100.00 | $320.00 | $500.00 | $294.91 |
| 120 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 2 | $294.91 | $100.00 | $320.00 | $500.00 | $294.91 |
| 121 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 122 | $113.70 | $70.00 | $70.00 | $110.00 | $85.00 |
| 122 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 2 | $2,000.00 | $1,000.00 | $5,000.00 | $1,750.00 | $2,460.00 |
| 123 | Manhole Frame & Cover (655.1202) | EACH | 3 | $15,000 | $1,000.00 | $5,000.00 | $1,650.00 | $2,280.00 |
| 124 | White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101) | LF | 22,640 | $0.85 | $1.50 | $2.00 | $1.65 | $1.16 |
| 125 | Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201) | LF | 2,905 | $0.85 | $1.50 | $2.00 | $1.60 | $1.16 |
| 126 | (691.04000020) | 252,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 127 | Field Change Payment (FCP) (697.03) | DOL | 1,308,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 128 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 129 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 130 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 131 | Mobilization (699.040001) | LS | 1 | $900,000 | $1,050,000 | $1,050,000 | $1,050,000 | $1,140,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.