NYSDOT contract D265693 bid tabulation

BRIDGE REPLACEMENTS - Ramp G of I-84 over I-84 & 684. Let by New York State DOT on March 5, 2026, Putnam, Region 08. 5 bids received; low bid $24,492,000 by Ecco III Enterprises Inc.

Owner
New York State DOT
Letting
05 MAR 2026
Pay items
131
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ecco III Enterprises Inc$24,492,000Low
2McNamee Construction Corp$27,674,000+13%
3Defoe Corporation$28,652,712+17%
4Harrison & Burrowes Bridge Constructors Inc$28,782,288+18%
5Gianfia Corp$30,357,890+24%
NYSDOT contract D265693: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ecco III Enterprises Inc2. McNamee Construction Corp3. Defoe Corporation4. Harrison & Burrowes Bridge Constructors Inc5. Gianfia Corp
1Clearing and Grubbing (201.06)LS1$100,000$150,000$50,000$350,000$95,000
2 (202.120001)LS1$500,000$1,000,000$1,200,000$875,000$500,000
3 (202.120002)LS1$1,000,000$1,000,000$1,200,000$875,000$500,000
4Removal of Substructures (202.19)CY453$420.00$250.00$400.00$175.00$260.00
5Unclassified Excavation and Disposal (203.02)CY987$60.00$100.00$180.00$45.00$180.00
6Embankment In Place (203.03)CY11,501$40.00$75.00$55.00$78.00$65.00
7Select Granular Fill (203.07)CY402$52.00$125.00$50.00$85.00$80.00
8Select Structural Fill (203.21)CY1,060$80.00$125.00$80.00$110.00$130.00
9Structure Excavation (206.01)CY4,140$50.00$100.00$85.00$41.00$75.00
10Trench and Culvert Excavation (206.0201)CY952$20.00$125.00$55.00$50.00$175.00
11Prefabricated Composite Integral Abutment Drain (207.27)SY563$18.00$15.00$39.00$15.00$15.00
12Seed and Mulch – Temporary (209.1003)SY1,434$4.00$5.00$15.00$3.00$2.00
13Check Dam, Prefabricated – Temporary (209.1105)LF720$57.00$15.00$190.00$75.00$45.00
14Silt Fence - Temporary (209.13)LF3,555$13.00$8.00$16.00$9.00$10.00
15Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701)LF132$55.00$20.00$500.00$23.00$13.00
16Stabilized Construction Access (209.22)SY900$90.00$50.00$85.00$62.00$60.00
17Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312)SF110$300.00$200.00$215.00$235.00$218.00
18 (210.481201)SF1,440$15.00$25.00$20.00$85.00$25.00
19 (304.11000008)1,371$125.00$125.00$130.00$170.00$150.00
20Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT154$140.00$140.00$140.00$140.00$140.00
21Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT154$140.00$140.00$140.00$140.00$140.00
22 (404.0179)TON830$180.00$220.00$250.00$235.00$198.50
23 (404.1271)TON669$200.00$300.00$300.00$325.00$276.75
24 (404.1979)TON446$200.00$300.00$300.00$315.00$325.00
25 (404.3779)TON927$180.00$300.00$250.00$265.00$250.00
26Straight Tack Coat (407.0103)GAL434$47.00$75.00$90.00$50.00$45.00
27Asphalt Pavement Joint Adhesive (418.7603)LF1,366$5.00$15.00$15.00$18.00$4.00
28Production Cold Milling of Bituminous Concrete (490.10)SY1,813$23.00$35.00$42.00$42.00$48.00
29Production Cold Milling of Portland Cement Concrete (490.20)SY163$30.00$35.00$45.00$45.00$70.00
30 (520.09000010)1,140$10.00$5.00$6.00$8.00$10.00
31Cast-In-Place Concrete Piles (551.11)LF5,660$200.00$215.00$250.00$265.00$215.00
32Furnishing Equipment for Driving Piles (551.13)LS1$300,000$740,000$513,500$550,000$560,000
33Splices for CIP Piles (551.15)EACH123$200.00$2,000.00$2,750.00$1,000.00$4,700.00
34Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902)QUALITY UNIT1$15.78$15.78$15.78$15.78$15.78
35Shields and Shoring (552.17)SF6,255$1.00$1.00$5.00$0.01$6.00
36 (552.2001)LF342$425.00$625.00$360.00$1.00$640.00
37 (552.2002)LF335$325.00$625.00$360.00$1.00$640.00
38 (552.2201)LF367$250.00$50.00$360.00$1.00$60.00
39 (552.2202)LF357$250.00$50.00$360.00$1.00$60.00
40 (552.230201)SF936$50.00$50.00$45.00$1.00$51.75
41 (552.230202)SF480$70.00$60.00$60.00$1.00$68.00
42 (554.3001)SF1,025$80.00$130.00$130.00$80.00$140.00
43Footing Concrete, Performance (555.0011)CY272$1,200.00$2,200.00$700.00$1,650.00$1,400.00
44Concrete for Structures, Performance (555.0021)CY713$2,000.00$2,300.00$1,600.00$2,650.00$1,700.00
45Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$8.00$8.00$8.00$8.00$8.00
46Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$11.00$11.00$11.00$11.00$11.00
47Stainless Steel Bar Reinforcement for Structures (556.0205)LB134,680$4.00$5.00$4.50$4.40$4.00
48Stud Shear Connectors for Bridges (556.03)EACH12,363$6.00$7.00$7.00$7.25$6.00
49 (557.1011)SY485$650.00$1,000.00$600.00$950.00$1,300.00
50 (557.1111)SY1,700$1,000.00$1,600.00$950.00$1,350.00$1,400.00
51Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY2,120$1.00$12.00$5.00$0.01$12.15
52Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$21.58$21.58$21.58$21.58$21.58
53Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY1,985$22.00$10.00$20.00$22.00$23.17
54Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF17,862$1.10$2.00$1.50$0.75$1.35
55Protective Sealing of New Structural Concrete (559.02)SF8,597$1.10$2.00$2.50$0.85$2.25
56 (564.0501)LS1$2,000,000$2,400,000$2,600,000$2,550,000$2,745,000
57 (564.0502)LS1$3,000,000$2,500,000$2,390,000$2,550,000$2,425,000
58Type E.B. Expansion Bearing (Over 225 k) (565.2035)EACH12$7,500.00$3,000.00$4,000.00$4,000.00$5,200.00
59 (565.30130101)24$300.00$200.00$1,000.00$725.00$790.00
60Armorless Bridge Joint (567.60)LF140$325.00$600.00$350.00$450.00$450.00
61Transition Bridge Railing (568.70)LF320$250.88$300.00$260.00$300.00$250.88
62Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF811$560.00$700.00$450.00$385.00$525.00
63Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$14.88$14.88$14.88$14.88$14.88
64Lead-Exposure Control Plan (570.01)LS1$2,000.00$2,000.00$2,100.00$1,500.00$2,500.00
65Medical Testing (570.02)DOL6,000$1.00$1.00$1.00$1.00$1.00
66Personal-Exposure-Monitoring Sample Analysis (570.03)DOL6,000$1.00$1.00$1.00$1.00$1.00
67Decontamination Facilities (570.04)CALENDAR WEEK8$840.13$500.00$525.00$500.00$2,500.00
68 (570.090001)LS1$7,500.00$1.00$1.00$1.00$10,000
69 (570.090002)LS1$7,500.00$1.00$1.00$1.00$10,000
70Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB551$6.50$1.00$10.00$7.00$10.00
71 (572.00020101)LS1$200,000$500,000$285,000$450,000$194,000
72 (572.00020201)LS1$175,000$500,000$255,000$450,000$155,000
73 (585.01)EACH4$25,000$20,000$16,500$10,000$22,585
74 (585.02)EACH2$25,000$20,000$17,000$10,000$26,787
75 (603.6103)LF193$250.00$100.00$480.00$145.00$62.00
76 (603.6109)LF199$350.00$150.00$290.00$325.00$214.00
77 (603.97000002)2$3,500.00$500.00$5,000.00$500.00$975.00
78 (604.070101)EACH1$4,000.00$2,000.00$4,600.00$1,000.00$4,300.00
79 (604.310411)LF9$1,000.00$1,200.00$2,250.00$1,500.00$2,200.00
80 (604.310611)LF7$1,500.00$1,200.00$2,600.00$1,550.00$2,200.00
81 (604.4060)LF31$800.00$1,200.00$2,100.00$1,100.00$1,500.00
82Box Beam Guide Railing (606.10)LF3,626$61.24$60.00$65.00$75.00$61.24
83Box Beam End Piece (606.120101)EACH8$1,301.19$1,000.00$1,500.00$1,600.00$1,301.19
84Box Beam Guide Railing End Assembly Type I (606.120102)EACH6$7,166.05$8,000.00$7,250.00$9,000.00$7,166.05
85Box Beam End Assembly Type III (606.1203)EACH1$9,460.72$15,000$9,750.00$11,500$9,460.72
86Removing and Disposing Box Beam Guide Railing (606.73)LF3,366$19.40$15.00$20.00$15.00$19.40
87Removing and Disposing Concrete Barrier-Half Section (606.7510)LF297$80.00$100.00$110.00$35.00$110.00
88Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON191$350.00$400.00$435.00$550.00$325.00
89Stone Curb – Bridge (Type A) (609.0301)LF134$150.00$75.00$100.00$200.00$310.00
90Topsoil - Roadside (610.1402)CY2,330$90.00$75.00$85.00$48.00$85.00
91Turf Establishment - Roadside (610.1601)SY6,988$3.00$3.00$5.00$1.50$1.50
92 (617.11000024)LS1$8,000.00$5,000.00$5,250.00$1,500.00$7,500.00
93Basic Work Zone Traffic Control (619.01)LS1$2,286,796$978,050$3,299,000$3,560,714$2,430,000
94Type III Construction Barricades (619.04)EACH12$400.00$300.00$460.00$150.00$200.00
95 (619.080102)LF2,500$1.28$2.00$2.00$2.10$1.75
96 (619.100101)LF9,120$1.52$1.00$0.50$0.58$1.30
97 (619.110733)EACH5$45,000$15,000$35,000$15,000$43,000
98Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF4,720$46.00$110.00$60.00$70.00$110.00
99Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF2,060$75.00$150.00$65.00$55.00$120.00
100Warning Lights on Temporary Positive Barriers (619.1719)EACH339$35.00$10.00$191.00$50.00$180.00
101Temporary Impact Attenuator - Gating (Test Level 3) (619.1813)EACH10$9,500.00$10,000$12,500$7,500.00$12,000
102Nighttime Operations (Entire Project) (619.24)LS1$250,000$200,000$145,000$475,000$2,000,000
103Traffic Control Supervisor (619.25)MONTH30$40.00$1,000.00$6,500.00$100.00$25,000
104Pavement Patching (Force Acount) (619.2601)DOL25,000$1.00$1.00$1.00$1.00$1.00
105Stone Filling (Light) (620.03)CY27$210.00$200.00$250.00$300.00$215.00
106Bedding Material, Type 2 (620.0802)CY30$175.00$200.00$350.00$275.00$228.00
107Concrete Block Slope Paving (620.09)SY687$325.00$300.00$300.00$500.00$306.00
108 (621.51000015)200$35.00$50.00$140.00$15.00$110.00
109Survey Operations (625.01)LS1$750,000$220,000$1,000,000$225,000$675,000
110 (633.05050208)LS1$4,000.00$15,000$90,000$3,500.00$35,000
111Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15)SY163$15.00$50.00$250.00$25.00$175.00
112Concrete Cylinder Curing Equipment (637.04)EACH1$7,300.00$5,000.00$1,800.00$2,500.00$4,500.00
113Engineer’s Field Office – Type 3 (637.13)MONTH30$6,000.00$6,000.00$8,500.00$7,000.00$14,350
114Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00
115Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
116 (639.21010011)LS1$100,000$75,000$50,000$50,000$50,000
117Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF35$90.56$100.00$100.00$100.00$90.56
118Type A Sign Posts (645.81)EACH4$756.48$300.00$850.00$800.00$756.48
119Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH2$294.91$100.00$320.00$500.00$294.91
120Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH2$294.91$100.00$320.00$500.00$294.91
121Milled-In Audible Roadway Delineators (MIARDs) (649.01)LF122$113.70$70.00$70.00$110.00$85.00
122Welded Frame & Reticuline Grate 11 (655.1111)EACH2$2,000.00$1,000.00$5,000.00$1,750.00$2,460.00
123Manhole Frame & Cover (655.1202)EACH3$15,000$1,000.00$5,000.00$1,650.00$2,280.00
124White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101)LF22,640$0.85$1.50$2.00$1.65$1.16
125Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201)LF2,905$0.85$1.50$2.00$1.60$1.16
126 (691.04000020)252,000$1.00$1.00$1.00$1.00$1.00
127Field Change Payment (FCP) (697.03)DOL1,308,000$1.00$1.00$1.00$1.00$1.00
128Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00
129Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00
130Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
131Mobilization (699.040001)LS1$900,000$1,050,000$1,050,000$1,050,000$1,140,000
NYSDOT contract D265693: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy