NYSDOT contract D265367 bid tabulation

Bridge Deck Replacement. Let by New York State DOT on January 9, 2025, Westchester, Region 08. 7 bids received; low bid $7,410,000 by El Sol Contracting / Es II Enterprises JV.

Owner
New York State DOT
Letting
09 JAN 2025
Pay items
105
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1El Sol Contracting / Es II Enterprises JV$7,410,000Low
2Transit-Halmar JV$8,633,343+17%
3Elq Industries Inc$8,950,183+21%
4Defoe Corporation$9,502,721+28%
5Gianfia Corp$9,557,916+29%
6McNamee Construction Corp$10,174,000+37%
7John Civetta & Sons Inc$11,972,300+62%
NYSDOT contract D265367: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. El Sol Contracting / Es II Enterprises JV2. Transit-Halmar JV3. Elq Industries Inc4. Defoe Corporation5. Gianfia Corp6. McNamee Construction Corp
1Clearing and Grubbing (201.06)LS1$15,000$75,000$50,000$50,000$35,000$117,000
2Removal of Steel Supported Structural Slabs (with shear connectors) – Type A (202.2201)SF16,200$65.00$110.00$75.00$107.00$52.00$70.00
3Structure Excavation (206.01)CY450$50.00$240.00$154.00$165.00$320.00$150.00
4Conduit Excavation and Backfill including Surface Restoration (206.03)LF1,887$50.00$25.00$1.00$70.00$44.00$48.00
5Test Pit Excavation (206.05)EACH1$1,500.00$3,000.00$3,100.00$3,500.00$2,300.00$4,000.00
6Prefabricated Composite Structural Drain (207.26)SY80$70.00$20.00$28.00$95.00$7.00$33.00
7Sediment Filter Log, 12″ (209.2301)LF120$10.00$40.00$24.00$55.00$28.00$10.00
8Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312)SF100$145.00$150.00$284.00$145.00$295.00$150.00
9 (404.0001)TON36$110.00$110.00$110.00$110.00$110.00$110.00
10 (404.0973)TON716$280.00$200.00$275.00$290.00$280.00$225.00
11Straight Tack Coat (407.0103)GAL284$30.00$15.00$39.00$27.00$50.00$30.00
12Asphalt Pavement Joint Adhesive (418.7603)LF6,024$5.00$1.50$4.50$3.00$1.00$2.00
13Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY8,081$13.00$5.00$20.00$13.00$14.00$6.50
14Concrete for Structures, Performance (555.0021)CY15$8,000.00$1,500.00$3,500.00$2,500.00$3,900.00$4,400.00
15Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$17.50$17.50$17.50$17.50$17.50$17.50
16Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB3,000$5.00$3.00$2.10$3.00$2.12$4.25
17Stud Shear Connectors for Bridges (556.03)EACH7,410$8.00$9.00$14.00$8.00$7.00$7.00
18 (557.1012)SY560$600.00$700.00$700.00$400.00$715.00$1,000.00
19 (557.1112)SY1,800$800.00$960.00$1,075.00$931.00$750.00$870.00
20Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY2,425$5.00$11.00$12.00$9.00$31.00$31.00
21Sidewalks and Safety Walks (557.30)SY1,000$150.00$150.00$230.00$220.00$186.00$185.00
22Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$33.96$33.96$33.96$33.96$33.96$33.96
23Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$9.00$9.00$9.00$9.00$9.00$9.00
24Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY1,344$16.00$25.00$76.00$19.00$14.88$50.00
25Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF22,000$2.00$1.25$1.35$1.25$2.00$2.00
26Protective Sealing of New Structural Concrete (559.02)SF4,000$2.00$2.25$2.50$2.25$4.00$2.00
27 (560.13060108)600$65.00$195.00$210.00$200.00$185.00$180.00
28 (564.100001)LB1,475$75.00$125.00$125.00$130.00$76.93$30.00
29 (564.510001)LB4,500$75.00$125.00$90.00$110.00$88.36$61.00
30Armorless Bridge Joint (567.60)LF106$500.00$75.00$470.00$570.00$485.00$375.00
31Steel Bridge Railing (Four-Rail) (568.51)LF800$450.00$375.00$452.00$420.00$350.00$275.00
32Transition Bridge Railing (568.70)LF130$400.00$275.00$400.00$370.00$270.00$175.00
33Lead-Exposure Control Plan (570.01)LS1$3,500.00$5,000.00$1,140.00$10,500$4,300.00$5,000.00
34Medical Testing (570.02)DOL1,000$1.00$1.00$1.00$1.00$1.00$1.00
35Personal-Exposure-Monitoring Sample Analysis (570.03)DOL1,000$1.00$1.00$1.00$1.00$1.00$1.00
36Decontamination Facilities (570.04)CALENDAR WEEK1$5,000.00$2,000.00$1,930.00$5,250.00$1,700.00$5,000.00
37 (570.090003)LS1$2,500.00$25,000$25,000$10,500$20,400$750,000
38 (570.100001)LS1$2,500.00$25,000$25,000$10,500$22,000$350,000
39Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB100$10.00$30.00$68.00$105.00$25.40$10.00
40 (572.010001)SF3,000$13.60$20.00$18.00$20.00$25.65$5.00
41 (574.030001)SF325$275.00$365.00$412.00$275.00$364.62$450.00
42Scuppers (Type B) (576.02)EACH2$6,000.00$7,500.00$7,000.00$4,700.00$7,600.00$25.00
43Removal of Structural Concrete (580.01)CY75$950.00$1,750.00$1,550.00$1,800.00$950.00$3,000.00
44Removal and Replacement of Structural Concrete (582.0051)CY10$9,000.00$2,750.00$4,500.00$16,000$4,750.00$5,500.00
45 (582.99)1$0.50$0.50$0.50$0.50$0.50$0.50
46 (585.01)EACH7$20,000$35,000$30,000$22,000$7,796.75$23,000
47Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH300$45.00$50.00$70.00$72.00$48.00$150.00
48Drilling and Grouting Bolts or Reinforcing Bars with Pullout Test (586.0301)EACH300$45.00$50.00$70.00$104.00$221.00$175.00
49Field Drill Holes in Existing Structural Steel (586.10)EACH300$65.00$75.00$120.00$74.00$103.96$250.00
50Bridge Railing Removal and Disposal (587.01)LF617$50.00$40.00$1.00$37.00$35.00$55.00
51 (589.010001)LB2,150$3.00$85.00$41.00$85.00$87.32$54.00
52 (607.06400016)617$155.00$110.00$160.00$146.00$112.00$175.00
53 (607.99870011)610$20.00$40.00$16.00$15.00$50.00$25.00
54Stone Curb – Bridge (Type F1) (609.0302)LF800$120.00$85.00$55.00$51.00$48.00$75.00
55 (617.11000024)LS1$15,000$3,500.00$3,700.00$10,500$6,645.00$2,200.00
56Basic Work Zone Traffic Control (619.01)LS1$600,000$250,000$550,000$630,000$1,110,000$1,361,624
57Type III Construction Barricades (619.04)EACH10$100.00$150.00$670.00$485.00$450.00$225.00
58 (619.080101)LF70$2.00$1.75$3.00$2.00$2.14$2.00
59 (619.080102)LF4,050$2.00$1.75$2.10$2.00$2.14$2.00
60 (619.100101)LF4,150$1.00$0.65$0.77$1.00$0.78$2.00
61 (619.100103)LF1,150$3.50$3.50$4.00$4.00$4.29$2.00
62 (619.111112)EACH2$5,000.00$20,000$25,000$21,000$30,000$20,000
63Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF980$23.00$10.00$32.00$62.00$117.00$20.00
64Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF300$55.00$25.00$173.00$180.00$250.00$125.00
65Warning Lights on Temporary Positive Barriers (619.1719)EACH41$70.00$75.00$230.00$236.00$173.00$25.00
66Nighttime Operations (Entire Project) (619.24)LS1$45,000$20,000$88,000$115,000$1,210,000$15,000
67 (619.67020010)LS1$93,000$75,000$78,000$75,000$68,750$70,000
68Survey Operations (625.01)LS1$80,000$125,000$100,000$254,000$84,000$175,000
69Concrete Cylinder Curing Equipment (637.04)EACH1$2,500.00$5,500.00$8,200.00$3,000.00$6,500.00$5,000.00
70Engineer’s Field Office – Type 3 (637.13)MONTH12$4,000.00$2,000.00$7,200.00$11,000$12,000$5,000.00
71Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
72Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
73Construction Testing supplies – Consumables (637.36)DOL1,000$1.00$1.00$1.00$1.00$1.00$1.00
74 (639.21010011)LS1$27,000$25,000$30,000$25,000$25,000$75,000
75 (659.18160008)325$25.00$25.00$25.00$25.00$25.00$25.00
76 (660.09020011)1$3,655.00$6,500.00$4,200.00$3,837.75$3,655.00$3,700.00
77 (660.65000101)1$6,200.00$750.00$1,100.00$4,377.74$10,180$500.00
78 (661.24110011)2$750.00$2,500.00$852.00$787.50$750.00$750.00
79 (662.17100108)LS1$25,000$25,000$25,000$25,000$25,000$25,000
80 (662.18100108)LS1$45,000$45,000$45,000$45,000$45,000$45,000
81 (662.60030008)1$4,200.00$750.00$550.00$10,500$1,360.00$600.00
82 (670.11250611)4$7,800.00$10,000$8,600.00$8,000.00$7,585.00$7,600.00
83 (670.1208)EACH2$950.00$2,500.00$1,100.00$1,000.00$950.00$950.00
84 (670.14480010)1$4,000.00$750.00$1,100.00$4,000.00$1,360.00$500.00
85 (670.2003)LF1,587$42.00$35.00$48.00$44.00$41.50$42.00
86Cast Iron Junction Boxes (670.40)EACH2$7,750.00$10,000$8,800.00$8,500.00$7,750.00$7,750.00
87 (670.50040104)6$985.00$1,000.00$1,200.00$1,100.00$985.00$985.00
88 (670.60010011)6$75.00$110.00$86.00$80.00$75.00$75.00
89 (670.60020011)6$150.00$125.00$170.00$158.00$150.00$150.00
90 (670.7005)LF6,395$3.00$5.00$3.25$3.00$2.85$3.00
91 (670.7006)LF525$2.50$5.00$2.70$3.00$2.35$3.00
92 (670.75070011)1,862$2.25$5.00$2.50$3.00$2.20$3.00
93 (670.81200010)10$600.00$500.00$690.00$630.00$600.00$600.00
94 (670.91000008)2$650.00$1,100.00$740.00$685.00$650.00$650.00
95 (670.94110010)LS1$3,692.04$12,000$4,000.00$3,675.00$3,500.00$3,500.00
96 (680.520406)LF63$79.00$100.00$90.00$85.00$78.75$80.00
97Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201)LF1,012$2.00$2.00$2.10$2.00$2.27$2.00
98White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF5,063$1.00$0.75$0.90$1.00$0.91$2.00
99Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF3,750$1.00$0.75$0.90$1.00$0.91$2.00
100 (691.04000020)63,000$1.00$1.00$1.00$1.00$1.00$1.00
101Field Change Payment (FCP) (697.03)DOL347,750$1.00$1.00$1.00$1.00$1.00$1.00
102Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
103Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
104Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
105Mobilization (699.040001)LS1$275,000$320,000$340,000$360,000$365,000$364,000
NYSDOT contract D265367: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy