Verde Electric Maintenance Corp: NYSDOT bid record

Verde Electric Maintenance Corp submitted 15 bids on New York State DOT contracts in the data, from 05 MAY 2022 to 01 OCT 2026, and was the low bidder on 10 of them (67%). When it was not low, its total sat a median +2.0% above the low bid.

Owner
New York State DOT
Low bid volume
$48,166,533
Latest bid
01 OCT 2026
Data through
15 OCT 2026
15Bids
10Low bids
67Win rate, percent
+2.0%Median gap to the low bid when not low, 5 bids

By year

YearBidsLow bidsWin rate
20223133%
20233267%
20242150%
20253267%
202644100%
Verde Electric Maintenance Corp, NYSDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1111 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1111 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1111 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1111 (100%)$1.00$1.00
680.53010010107 (70%)$7.00$7.49
680.51100010106 (60%)$200.00$370.00
Asphalt Price Adjustment698.04DOL66 (100%)$1.00$1.00
680.05010007105 (50%)$24,275$25,000
680.05020007105 (50%)$4,195.00$4,800.00
662.6000010855 (100%)$1.00$1.00
Conduit Excavation and Backfill including Surface Restoration206.03LF64 (67%)$110.75$55.00
Traffic Signal Section - Aluminum Type I, 12-inch680.810107EACH63 (50%)$292.50$243.97
Verde Electric Maintenance Corp, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Verde Electric Maintenance Corp, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
01 OCT 2026D265832Region 08SIGNAL OPTIMIZATION1 of 5$969,452Low, 6.0% under the second
05 FEB 2026D265691Region 08TRAFFIC SIGNAL IMPROVEMENTS - US 9W, NY 119, 117, 22, 100B1 of 1$5,494,798Low
22 JAN 2026D265529Region 08HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS1 of 4$6,754,552Low, 3.0% under the second
22 JAN 2026D265531Region 08PEDESTRIAN SAFETY IMPROVEMENTS1 of 3$4,665,730Low, 12% under the second
25 SEP 2025D265565Region 08RTE 22 AT EDGEWOOD RD INTERSECTION SIGNALIZATION1 of 1$620,967Low
11 SEP 2025D265558Region 08SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM2 of 3$975,725+2.0%
07 AUG 2025D265523Region 08Traffic Signals: Transfer Switches with ROW1 of 1$1,158,958Low
10 OCT 2024D265329Region 08SIGNAL UPGRADES: ROUTES 59 & 304, CLARKSTOWN1 of 2$871,850Low, 34% under the second
08 AUG 2024D265291Region 08SIGNAL REQUIREMENTS2 of 2$909,822+5.0%
01 JUN 2023D265028Region 08SIGNAL OPTIMIZATION; PUTNAM & WESTCHESTER1 of 3$848,240Low, 8.0% under the second
18 MAY 2023D264948Region 08SIGNAL UPGRADES: ROUTE 211, TOWN OF WALLKILL, ORANGE COUNTY2 of 3$991,976+6.0%
20 APR 2023D264942Region 08LHTL Traffic Signals, Cameras, VMS1 of 2$25,457,636Low, 11% under the second
02 JUN 2022D264797Region 08SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM2 of 2$579,320+1.0%
19 MAY 2022D264793Region 08Signal Requirements, transfer switches,NYSDOT Region-81 of 1$1,324,350Low
05 MAY 2022D264759Region 08Westchester, OVER HEIGHT VEHICLE DETECTION SYSTEMS2 of 2$3,125,5280.0%
Verde Electric Maintenance Corp: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy