NYSDOT contract D265558 bid tabulation
SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM. Let by New York State DOT on September 11, 2025, Dutchess, Orange, Ulster, Region 08. 3 bids received; low bid $958,576 by Power Line Constructors Inc.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 12
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Power Line Constructors Inc | $958,576 | Low |
| 2 | Verde Electric Maintenance Corp | $975,725 | +2.0% |
| 3 | Stilsing Electric Inc | $1,084,860 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Power Line Constructors Inc | 2. Verde Electric Maintenance Corp | 3. Stilsing Electric Inc |
|---|---|---|---|---|---|---|
| 1 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $57,880 | $58,000 | $80,000 |
| 2 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 14 | $2,400.00 | $2,500.00 | $3,200.00 |
| 3 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 4 | (680.05010007) | 26 | $23,116 | $23,800 | $24,400 | |
| 5 | (680.05020007) | 20 | $3,484.00 | $3,675.00 | $4,550.00 | |
| 6 | (680.51100010) | 15 | $152.00 | $75.00 | $290.00 | |
| 7 | (680.53010010) | 1,000 | $6.72 | $3.50 | $4.00 | |
| 8 | (680.80322008) | 26 | $4,520.00 | $4,000.00 | $5,385.00 | |
| 9 | Field Change Payment (FCP) (697.03) | DOL | 45,000 | $1.00 | $1.00 | $1.00 |
| 10 | Fuel Price Adjustment (698.05) | DOL | 200 | $1.00 | $1.00 | $1.00 |
| 11 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 12 | Mobilization (699.040001) | LS | 1 | $22,580 | $34,500 | $39,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.