Power Line Constructors Inc: NYSDOT bid record
Power Line Constructors Inc submitted 34 bids on New York State DOT contracts in the data, from 02 JUN 2022 to 15 OCT 2026, and was the low bidder on 10 of them (29%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $12,306,721
- Latest bid
- 15 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 1 | 25% |
| 2023 | 7 | 3 | 43% |
| 2024 | 9 | 3 | 33% |
| 2025 | 6 | 2 | 33% |
| 2026 | 8 | 1 | 13% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 08 | 12 | 7 | 58% |
| Region 03 | 6 | 0 | 0% |
| Region 01 | 4 | 0 | 0% |
| Region 09 | 4 | 1 | 25% |
| Region 02 | 2 | 2 | 100% |
| Region 07 | 2 | 0 | 0% |
| Region 05 | 2 | 0 | 0% |
| Region 06 | 1 | 0 | 0% |
| Region 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 33 | 33 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 33 | 33 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 33 | 33 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 21 | 12 (57%) | $34.62 | $45.44 |
| 680.05020007 | 18 | 12 (67%) | $3,641.00 | $4,800.00 | ||
| Traffic Signal Bracket Assembly - 1 Way | 680.8111 | EACH | 13 | 11 (85%) | $320.00 | $460.00 |
| 680.05010007 | 22 | 10 (45%) | $22,691 | $25,000 | ||
| Engineer’s Field Office – Type 2 | 637.12 | MONTH | 19 | 10 (53%) | $2,080.00 | $2,500.00 |
| Traffic Signal Module - 12-inch, Yellow Ball, LED | 680.810103 | EACH | 10 | 9 (90%) | $80.01 | $132.50 |
| Traffic Signal Module - 12-inch, Red Ball, LED | 680.810101 | EACH | 10 | 9 (90%) | $80.01 | $125.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Binghamton Road Electric LLC | 13 | 5 of 13 |
| Stilsing Electric Inc | 11 | 5 of 11 |
| Elderlee Inc | 8 | 6 of 8 |
| Verde Electric Maintenance Corp | 6 | 2 of 6 |
| Economy Paving Co Inc | 6 | 2 of 6 |
| Power & Construction Group Inc | 5 | 4 of 5 |
| US Traffic Control Inc | 5 | 4 of 5 |
| M L Caccamise Electric Corp | 4 | 2 of 4 |
| DLC Electric LLC | 4 | 4 of 4 |
| Emi Guide Rail LLC | 3 | 3 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2026 | D265848 | Region 08 | SIGNAL UPGRADES ROUTE 9 TOWN OF FISHKILL | 1 of 3 | $599,180 | Low, 4.0% under the second |
| 01 OCT 2026 | D265832 | Region 08 | SIGNAL OPTIMIZATION | 2 of 5 | $1,030,203 | +6.0% |
| 13 AUG 2026 | D265826 | Region 08 | CURVE WARNNG SIGN UPGRADES WESTCHESTER COUNTY | 3 of 5 | $2,196,330 | +8.0% |
| 13 AUG 2026 | D265827 | Region 08 | CURVE WARNING SIGN UPGRADES ROCKLAND AND ORANGE COUNTIES | 2 of 7 | $638,504 | +17% |
| 07 MAY 2026 | D265764 | Region 08 | SIGNAL REQUIREMENTS | 2 of 2 | $1,398,263 | +19% |
| 16 APR 2026 | D265765 | Region 09 | HIGHWAY SIGN INSTALLATION - Various Locations | 5 of 6 | $3,256,251 | +20% |
| 26 FEB 2026 | D265707 | Region 09 | Sign Requirements Contract 25/26, Region 9 | 2 of 2 | $583,492 | +6.0% |
| 05 FEB 2026 | D265687 | Region 03 | Ground Mounted Sign Replacement Project, Various locations | 5 of 6 | $746,824 | +53% |
| 25 SEP 2025 | D265574 | Region 03 | Regional Signal Project | 3 of 5 | $3,266,377 | +18% |
| 11 SEP 2025 | D265558 | Region 08 | SIGNAL OPTIMIZATION: WIRELESS VEHICLE DETECTION SYSTEM | 1 of 3 | $958,576 | Low, 2.0% under the second |
| 10 JUL 2025 | D265538 | Region 07 | CURVE WARNING SIGN UPGRADES - I-81 & I-87 | 5 of 5 | $818,951 | +21% |
| 13 MAR 2025 | D265441 | Region 03 | Ground Mounted Sign Replacement Project - Rtes 34 & 96 | 2 of 2 | $751,750 | +88% |
| 27 FEB 2025 | D265416 | Region 02 | TRAFFIC SYSTEMS IMPROVEMENT - Various Locations. | 1 of 1 | $3,658,718 | Low |
| 20 FEB 2025 | D265398 | Region 01 | TRAFFIC SIGNAL IMPROVEMENTS - Various Locations | 3 of 3 | $2,828,050 | +36% |
| 24 OCT 2024 | D265320 | Region 04 | Route 332 Corridor High Visibility Signal Safety Enhancement | 3 of 5 | $5,497,227 | +23% |
| 12 SEP 2024 | D265306 | Region 08 | SIGNAL OPTIMIZATION: PUTNAM, ROCKLAND & WESTCHESTER | 1 of 2 | $1,070,958 | Low, 4.0% under the second |
| 08 AUG 2024 | D265291 | Region 08 | SIGNAL REQUIREMENTS | 1 of 2 | $868,686 | Low, 5.0% under the second |
| 11 JUL 2024 | D265279 | Region 05 | Embedded Traffic Signal Pole Replacements | 2 of 2 | $1,519,910 | +9.0% |
| 09 MAY 2024 | D265156 | Region 09 | SIGNAL REPLACEMENTS - RTE 17C AND 26, BROOME COUNTY | 2 of 4 | $2,355,898 | 0.0% |
| 11 APR 2024 | D265087 | Region 09 | Sign Requirements Contract 23/24 | 1 of 3 | $519,177 | Low, 3.0% under the second |
| 29 FEB 2024 | D265142 | Region 03 | REGIONAL SIGN REPLACEMENT PROJECT - NY ROUTES 31, 34 & 481 | 3 of 3 | $1,225,513 | +38% |
| 29 FEB 2024 | D265204 | Region 05 | Traffic Signal Loops; SFY 24/25 | 4 of 4 | $1,047,055 | +46% |
| 11 JAN 2024 | D265171 | Region 03 | REGIONAL TRAFFIC SIGNAL PROJECT | 3 of 3 | $4,196,125 | +13% |
| 09 NOV 2023 | D265107 | Region 07 | Signal Improvement Project 2024-2025 | 3 of 4 | $2,356,138 | +27% |
| 09 NOV 2023 | D265108 | Region 01 | TRAFFIC SIGNALS REBUILD SFY 2023 | 3 of 4 | $1,946,007 | +39% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.