NYSDOT contract D265826 bid tabulation

CURVE WARNNG SIGN UPGRADES WESTCHESTER COUNTY. Let by New York State DOT on August 13, 2026, Westchester, Region 08. 5 bids received; low bid $2,040,729 by Road Safety Systems LLC.

Owner
New York State DOT
Letting
13 AUG 2026
Pay items
14
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Road Safety Systems LLC$2,040,729Low
2Ground Control Excavating Inc.$2,042,7680.0%
3Power Line Constructors Inc$2,196,330+8.0%
4Westmoreland Construction Inc$2,844,285+39%
5J Fletcher Creamer & Son Inc$4,447,666+118%
NYSDOT contract D265826: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Road Safety Systems LLC2. Ground Control Excavating Inc.3. Power Line Constructors Inc4. Westmoreland Construction Inc5. J Fletcher Creamer & Son Inc
1Clearing and Grubbing (201.06)LS1$19,300$35,000$66,837$2,500.00$50,100
2Basic Work Zone Traffic Control (619.01)LS1$288,500$600,000$324,864$205,000$884,906
3Survey Operations (625.01)LS1$100,000$50,000$45,614$25,000$50,000
4Engineer’s Field Office – Type 3 (637.13)MONTH20$4,305.00$3,500.00$3,355.00$5,000.00$6,000.00
5Office Technology and Supplies (637.34)DOL2,000$1.00$1.00$1.00$1.00$1.00
6 (637.41000115)20$250.00$400.00$183.00$200.00$250.00
7Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF14,100$52.00$30.00$43.23$61.00$93.00
8Type A Sign Posts (645.81)EACH2,670$187.00$205.00$249.00$453.00$500.00
9Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH1,431$50.00$50.00$122.00$125.00$260.00
10Field Change Payment (FCP) (697.03)DOL157,000$1.00$1.00$1.00$1.00$1.00
11Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00
12Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00
13Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
14Mobilization (699.040001)LS1$78,489$78,568$80,000$100,000$160,000
NYSDOT contract D265826: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of August 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy