Road Safety Systems LLC: NYSDOT bid record
Road Safety Systems LLC submitted 15 bids on New York State DOT contracts in the data, from 22 MAY 2025 to 27 AUG 2026, and was the low bidder on 8 of them (53%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $12,404,735
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 4 | 3 | 75% |
| 2026 | 11 | 5 | 45% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 08 | 6 | 5 | 83% |
| Region 01 | 4 | 2 | 50% |
| Region 09 | 3 | 0 | 0% |
| Region 08, 10, 11 | 1 | 1 | 100% |
| Region 10 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 8 | 3 (38%) | $85.55 | $85.00 |
| Box Beam End Piece | 606.120101 | EACH | 6 | 3 (50%) | $806.56 | $750.00 |
| Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) | 647.51 | EACH | 5 | 3 (60%) | $50.00 | $50.00 |
| Box Beam Guide Railing | 606.10 | LF | 7 | 2 (29%) | $59.00 | $55.00 |
| Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel | 646.23 | EACH | 7 | 2 (29%) | $47.00 | $25.00 |
| Removing and Disposing Cable Guide Railing | 606.70 | LF | 5 | 2 (40%) | $1.35 | $3.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 7 | 1 (14%) | $54.50 | $45.44 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elderlee Inc | 8 | 5 of 8 |
| J Fletcher Creamer & Son Inc | 5 | 1 of 5 |
| Westmoreland Construction Inc | 5 | 1 of 5 |
| Emi Guide Rail LLC | 4 | 3 of 4 |
| Power Line Constructors Inc | 3 | 0 of 3 |
| Economy Paving Co Inc | 2 | 1 of 2 |
| Ground Control Excavating Inc. | 2 | 0 of 2 |
| D A Collins Construction Co Inc | 1 | 0 of 1 |
| US Traffic Control Inc | 1 | 0 of 1 |
| McClain & Company Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265825 | Region 01 | Guide Rail Replacement SFY26 | 3 of 3 | $3,308,265 | +27% |
| 27 AUG 2026 | D265833 | Region 10 | Curve Warning Sign Upgrades Various Highways and Roadways | 4 of 4 | $5,459,729 | +52% |
| 13 AUG 2026 | D265826 | Region 08 | CURVE WARNNG SIGN UPGRADES WESTCHESTER COUNTY | 1 of 5 | $2,040,729 | Low, 0.0% under the second |
| 13 AUG 2026 | D265827 | Region 08 | CURVE WARNING SIGN UPGRADES ROCKLAND AND ORANGE COUNTIES | 1 of 7 | $544,239 | Low, 17% under the second |
| 30 JUL 2026 | D265824 | Region 08 | I-684 SAFETY GUIDERAIL TERMNAL REPLACEMENTS | 1 of 3 | $406,247 | Low, 47% under the second |
| 21 MAY 2026 | D265791 | Region 01 | Work Zone Traffic Control For Project Development Activities | 1 of 2 | $197,236 | Low, 68% under the second |
| 16 APR 2026 | D265765 | Region 09 | HIGHWAY SIGN INSTALLATION - Various Locations | 2 of 6 | $2,772,019 | +2.0% |
| 26 MAR 2026 | D265780 | Region 08 | Guiderail Replacement: Interstate 84 West Orange County | 2 of 2 | $2,435,491 | +6.0% |
| 26 FEB 2026 | D265675 | Region 09 | Overhead Sign Structure Replacement | 3 of 3 | $3,183,127 | +56% |
| 26 FEB 2026 | D265703 | Region 09 | 2026 Guiderail Requirements Contract | 3 of 3 | $2,771,402 | +27% |
| 22 JAN 2026 | D265623 | Region 01 | HIGHWAY SIGN REPLACEMENT - Various Routes | 1 of 2 | $3,900,868 | Low, 13% under the second |
| 23 OCT 2025 | D265569 | Region 08 | WORK ZONE TRAFFIC CONTROL FOR PROJECT DEVELOPMENT. | 1 of 2 | $205,267 | Low, 32% under the second |
| 11 SEP 2025 | D265541 | Region 01 | GUIDE RAIL REPLACEMENT SFY 25 | 3 of 3 | $3,599,875 | +18% |
| 05 JUN 2025 | D265509 | Region 08, 10, 11 | Sign Requirements Contract, Downstate, Regions 8, 10 and 11 | 1 of 2 | $3,305,528 | Low, 25% under the second |
| 22 MAY 2025 | D265499 | Region 08 | Guiderail Replacement: Interstate 84 | 1 of 3 | $1,804,621 | Low, 13% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.