NYSDOT contract D265499 bid tabulation
Guiderail Replacement: Interstate 84. Let by New York State DOT on May 22, 2025, Dutchess, Region 08. 3 bids received; low bid $1,804,621 by Road Safety Systems LLC.
- Owner
- New York State DOT
- Letting
- 22 MAY 2025
- Pay items
- 18
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Road Safety Systems LLC | $1,804,621 | Low |
| 2 | Elderlee Inc | $2,045,177 | +13% |
| 3 | J Fletcher Creamer & Son Inc | $3,021,188 | +67% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Road Safety Systems LLC | 2. Elderlee Inc | 3. J Fletcher Creamer & Son Inc |
|---|---|---|---|---|---|---|
| 1 | Box Beam Guide Railing (606.10) | LF | 22,973 | $50.00 | $58.00 | $81.00 |
| 2 | Box Beam End Piece (606.120101) | EACH | 17 | $1,006.70 | $860.00 | $2,500.00 |
| 3 | Box Beam End Assembly Type III (606.1203) | EACH | 17 | $9,738.16 | $6,000.00 | $12,000 |
| 4 | (606.59600015) | 2,042 | $35.30 | $18.00 | $6.00 | |
| 5 | Removing and Disposing Cable Guide Railing (606.70) | LF | 23,226 | $1.00 | $2.00 | $18.00 |
| 6 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 7 | $120.00 | $60.00 | $500.00 |
| 7 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $105,954 | $218,784 | $179,300 |
| 8 | (619.110511) | EACH | 4 | $7,071.54 | $7,400.00 | $6,000.00 |
| 9 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 22,776 | $0.44 | $0.20 | $0.10 |
| 10 | Survey Operations (625.01) | LS | 1 | $8,500.00 | $10.00 | $20,000 |
| 11 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 9 | $5,033.33 | $8,200.00 | $5,500.00 |
| 12 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 13 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 71 | $40.94 | $20.00 | $1.00 |
| 14 | Steel Post, 1.1 lb/ft (646.31) | EACH | 71 | $56.52 | $50.00 | $30.00 |
| 15 | Field Change Payment (FCP) (697.03) | DOL | 100,000 | $1.00 | $1.00 | $1.00 |
| 16 | Fuel Price Adjustment (698.05) | DOL | 676 | $1.00 | $1.00 | $1.00 |
| 17 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 18 | Mobilization (699.040001) | LS | 1 | $69,403 | $78,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 22, 2025. Compiled by Mirage Metrics.