Elderlee Inc submitted 60 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 15 OCT 2026, and was the low bidder on 35 of them (58%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $111,084,947
- Latest bid
- 15 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 17 | 8 | 47% |
| 2023 | 8 | 5 | 63% |
| 2024 | 7 | 5 | 71% |
| 2025 | 14 | 10 | 71% |
| 2026 | 14 | 7 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 11 | 8 | 73% |
| Region 05 | 7 | 2 | 29% |
| Region 01 | 7 | 3 | 43% |
| Region 08 | 7 | 2 | 29% |
| Region 03 | 7 | 6 | 86% |
| Region 06 | 6 | 4 | 67% |
| Region 02 | 5 | 4 | 80% |
| Region 07 | 3 | 2 | 67% |
| Region 01, 02, 07 | 2 | 2 | 100% |
| Region 04, 05, 06 | 2 | 0 | 0% |
| Region 04 | 2 | 1 | 50% |
| Region 03, 09 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 48 | 48 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 39 | 39 (100%) | $1.00 | $1.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 43 | 34 (79%) | $65.00 | $85.00 |
| Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel | 646.23 | EACH | 33 | 24 (73%) | $18.00 | $25.00 |
| Box Beam End Assembly Type III | 606.1203 | EACH | 28 | 24 (86%) | $5,000.00 | $7,000.00 |
| Removing and Disposing Box Beam Guide Rail Turned-Down Terminal | 606.7920 | EACH | 27 | 23 (85%) | $50.00 | $200.00 |
| Box Beam Guide Railing | 606.10 | LF | 33 | 20 (61%) | $48.00 | $55.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 27 | 17 (63%) | $35.00 | $45.44 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emi Guide Rail LLC | 22 | 9 of 22 |
| Power Line Constructors Inc | 8 | 2 of 8 |
| Road Safety Systems LLC | 8 | 3 of 8 |
| Mohegan Associates Inc | 7 | 3 of 7 |
| US Traffic Control Inc | 6 | 2 of 6 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 5 | 2 of 5 |
| Economy Paving Co Inc | 5 | 0 of 5 |
| J Fletcher Creamer & Son Inc | 5 | 1 of 5 |
| Cold Spring Construction Company | 5 | 1 of 5 |
| Union Concrete & Construction Corp | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2026 | D265838 | Region 05 | Guiderail Replacement Project; US-62 | 3 of 3 | $2,214,849 | +66% |
| 27 AUG 2026 | D265825 | Region 01 | Guide Rail Replacement SFY26 | 2 of 3 | $2,915,655 | +12% |
| 13 AUG 2026 | D265827 | Region 08 | CURVE WARNING SIGN UPGRADES ROCKLAND AND ORANGE COUNTIES | 4 of 7 | $797,023 | +46% |
| 30 JUL 2026 | D265824 | Region 08 | I-684 SAFETY GUIDERAIL TERMNAL REPLACEMENTS | 3 of 3 | $751,871 | +85% |
| 04 JUN 2026 | D265793 | Region 05 | Replacement of Overhead Sign & Ground Mounted Signs | 1 of 3 | $1,254,756 | Low, 8.0% under the second |
| 16 APR 2026 | D265765 | Region 09 | HIGHWAY SIGN INSTALLATION - Various Locations | 1 of 6 | $2,715,555 | Low, 2.0% under the second |
| 09 APR 2026 | D265760 | Region 03 | Regional SAFETAP Project | 1 of 2 | $2,977,542 | Low, 0.0% under the second |
| 26 MAR 2026 | D265718 | Region 07 | GUIDE RAIL REPLACEMENT | 1 of 2 | $5,963,313 | Low, 43% under the second |
| 26 FEB 2026 | D265675 | Region 09 | Overhead Sign Structure Replacement | 1 of 3 | $2,046,760 | Low, 17% under the second |
| 26 FEB 2026 | D265703 | Region 09 | 2026 Guiderail Requirements Contract | 2 of 3 | $2,216,260 | +1.0% |
| 26 FEB 2026 | D265707 | Region 09 | Sign Requirements Contract 25/26, Region 9 | 1 of 2 | $552,948 | Low, 6.0% under the second |
| 05 FEB 2026 | D265687 | Region 03 | Ground Mounted Sign Replacement Project, Various locations | 4 of 6 | $721,949 | +48% |
| 05 FEB 2026 | D265706 | Region 06 | Guiderail Repair/Replace, various locations | 2 of 2 | $592,388 | +15% |
| 22 JAN 2026 | D265683 | Region 09 | Bridge Rail Replacement, Regionwide | 1 of 1 | $1,305,348 | Low |
| 11 SEP 2025 | D265541 | Region 01 | GUIDE RAIL REPLACEMENT SFY 25 | 1 of 3 | $3,039,000 | Low, 7.0% under the second |
| 10 JUL 2025 | D265538 | Region 07 | CURVE WARNING SIGN UPGRADES - I-81 & I-87 | 2 of 5 | $707,410 | +5.0% |
| 05 JUN 2025 | D265508 | Region 03 | Sign Requirements Contract, Upstate Central | 1 of 1 | $2,965,985 | Low |
| 05 JUN 2025 | D265510 | Region 01, 02, 07 | Sign Requirements Contract, Upstate East | 1 of 2 | $2,751,980 | Low, 14% under the second |
| 05 JUN 2025 | D265511 | Region 04, 05, 06 | Sign Requirements Contract, Upstate West, Regions 4, 5 & 6 | 2 of 2 | $2,786,975 | +1.0% |
| 22 MAY 2025 | D265499 | Region 08 | Guiderail Replacement: Interstate 84 | 2 of 3 | $2,045,177 | +13% |
| 08 MAY 2025 | D265483 | Region 05 | REPLACEMENT OF OVERHEAD SIGNS & GROUND MOUNTED SIGNS | 4 of 4 | $1,916,623 | +10% |
| 08 MAY 2025 | D265486 | Region 03 | Regional SAFETAP Project | 1 of 2 | $7,547,544 | Low, 32% under the second |
| 27 MAR 2025 | D265457 | Region 07 | Guide Rail Replacement in St. Lawrence County | 1 of 1 | $2,658,454 | Low |
| 13 MAR 2025 | D265441 | Region 03 | Ground Mounted Sign Replacement Project - Rtes 34 & 96 | 1 of 2 | $399,968 | Low, 88% under the second |
| 13 MAR 2025 | D265455 | Region 04 | Guiderail Requirements, Regionwide | 1 of 1 | $4,000,000 | Low |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.