NYSDOT contract D265827 bid tabulation
CURVE WARNING SIGN UPGRADES ROCKLAND AND ORANGE COUNTIES. Let by New York State DOT on August 13, 2026, Orange, Rockland, Region 08. 7 bids received; low bid $544,239 by Road Safety Systems LLC.
- Owner
- New York State DOT
- Letting
- 13 AUG 2026
- Pay items
- 15
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Road Safety Systems LLC | $544,239 | Low |
| 2 | Power Line Constructors Inc | $638,504 | +17% |
| 3 | Ground Control Excavating Inc. | $762,148 | +40% |
| 4 | Elderlee Inc | $797,023 | +46% |
| 5 | Jorrey Excavating Inc | $806,773 | +48% |
| 6 | Westmoreland Construction Inc | $1,063,834 | +95% |
| 7 | J Fletcher Creamer & Son Inc | $1,165,740 | +114% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Road Safety Systems LLC | 2. Power Line Constructors Inc | 3. Ground Control Excavating Inc. | 4. Elderlee Inc | 5. Jorrey Excavating Inc | 6. Westmoreland Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $4,000.00 | $14,896 | $25,000 | $5,000.00 | $80,000 | $2,500.00 |
| 2 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $60,415 | $130,455 | $135,000 | $127,700 | $102,000 | $155,000 |
| 3 | Survey Operations (625.01) | LS | 1 | $21,942 | $10,286 | $30,000 | $12,000 | $5,000.00 | $25,000 |
| 4 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 20 | $4,400.00 | $3,465.00 | $3,500.00 | $5,500.00 | $3,000.00 | $5,000.00 |
| 5 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 6 | (637.41000115) | 20 | $250.00 | $189.00 | $400.00 | $100.00 | $350.00 | $150.00 | |
| 7 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 3,453 | $50.00 | $42.16 | $65.00 | $51.00 | $115.00 | $80.00 |
| 8 | Type A Sign Posts (645.81) | EACH | 521 | $230.00 | $255.00 | $210.00 | $310.00 | $150.00 | $614.00 |
| 9 | Breakaway Wooden Sign Posts (645.82) | EACH | 50 | $1.00 | $843.00 | $1,500.00 | $2,370.00 | $200.00 | $1,250.00 |
| 10 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 228 | $40.00 | $118.00 | $60.00 | $50.00 | $1.00 | $175.00 |
| 11 | Field Change Payment (FCP) (697.03) | DOL | 40,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 12 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 13 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | Mobilization (699.040001) | LS | 1 | $20,932 | $20,000 | $29,313 | $30,510 | $25,000 | $37,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 13, 2026. Compiled by Mirage Metrics.