NYSDOT contract D265486 bid tabulation

Regional SAFETAP Project. Let by New York State DOT on May 8, 2025, Onondaga, Region 03. 2 bids received; low bid $7,547,544 by Elderlee Inc.

Owner
New York State DOT
Letting
08 MAY 2025
Pay items
60
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Elderlee Inc$7,547,544Low
2Economy Paving Co Inc$9,996,660+32%
NYSDOT contract D265486: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Elderlee Inc2. Economy Paving Co Inc
1Embankment In Place (203.03)CY22$122.75$10.00
2Select Granular Fill (203.07)CY40$99.00$50.00
3 (203.24010017)2,445$53.00$105.00
4Trench and Culvert Excavation (206.0201)CY18$122.00$1.00
5Seed and Mulch – Temporary (209.1003)SY1,010$3.00$5.00
6 (404.1282)TON70$252.00$260.00
7 (404.2589)TON51$278.00$265.00
8Diluted Tack Coat (407.0102)GAL29$21.00$10.00
9Asphalt Pavement Joint Adhesive (418.7603)LF2,816$2.00$1.00
10Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,334$11.00$6.50
11 (603.051214)LF60$80.00$80.00
12 (603.171116)EACH1$820.00$1,015.00
13 (603.171316)EACH1$975.00$1,065.00
14 (603.9812)LF8$360.00$145.00
15 (604.070301)EACH1$3,100.00$1,000.00
16Box Beam Guide Railing (606.10)LF53,142$40.00$45.00
17Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF3,721$48.00$50.00
18Box Beam Guide Railing With Extra Long Posts (606.1001)LF145$55.00$50.00
19Box Beam Median Barrier (606.11)LF34,362$51.00$60.00
20Box Beam End Piece (606.120101)EACH42$715.00$600.00
21Box Beam Guide Railing End Assembly Type I (606.120102)EACH16$3,625.00$3,800.00
22Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103)EACH26$4,410.00$4,800.00
23Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH5$2,035.00$2,000.00
24Box Beam End Assembly Type III (606.1203)EACH2$4,900.00$6,000.00
25Box Beam Median Barrier End Assembly, Type A (606.1401)EACH2$2,300.00$2,500.00
26Box Beam Median Barrier End Assembly, Type C (606.1403)EACH6$5,600.00$6,500.00
27HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF8,669$27.00$30.00
28HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) (606.270101)LF278$29.00$30.00
29Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH7$1,980.00$2,500.00
30Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Buried in Back Slope (606.2704)EACH3$2,110.00$3,500.00
31Single-Slope Concrete Median Barrier (Optional) (606.3041)LF1,408$196.00$165.00
32Removing and Disposing Corrugated Beam Guide Railing (606.71)LF74,800$2.00$6.75
33Removing and Disposing Corrugated Beam Median Barrier (606.72)LF21,269$3.00$7.10
34Removing and Disposing Box Beam Guide Railing (606.73)LF175$3.00$14.00
35Removing and Disposing Concrete Barrier (606.75)LF1,405$43.00$40.00
36Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH109$100.00$530.00
37Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH1$30.00$500.00
38Removing and Disposing Box Beam Median Barrier End Assembly-Type C (606.7932)EACH6$50.00$500.00
39Transition Between Box Beam Median Barrier and Single Slope Concrete Median Barrier (606.8805)EACH2$24,000$10,000
40Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON2,751$168.00$215.00
41Turf Establishment – Performance (610.1605)SY18,704$13.00$4.00
42 (617.11000024)LS1$2,500.00$1,000.00
43Basic Work Zone Traffic Control (619.01)LS1$476,614$1,465,000
44Clean, Grade and Shape Existing Roadside Section (621.05)LF80$27.50$10.00
45 (621.05020004)65,213$3.60$7.30
46 (627.50140008)2,816$2.80$1.20
47Engineer’s Field Office – Type 2 (637.12)MONTH18$3,000.00$3,000.00
48Office Technology and Supplies (637.34)DOL1,000$1.00$1.00
49Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF2$42.00$75.00
50Type A Sign Posts (645.81)EACH2$140.00$250.00
51Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH4$10.00$15.00
52Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH485$15.00$20.00
53Steel Post, 1.1 lb/ft (646.31)EACH4$45.00$75.00
54Steel Post, 2.0 lb/ft (646.32)EACH426$60.00$80.00
55Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH2$55.00$150.00
56Field Change Payment (FCP) (697.03)DOL335,000$1.00$1.00
57Asphalt Price Adjustment (698.04)DOL200$1.00$1.00
58Fuel Price Adjustment (698.05)DOL200$1.00$1.00
59Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00
60Mobilization (699.040001)LS1$290,000$384,240
NYSDOT contract D265486: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of May 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy