Economy Paving Co Inc submitted 81 bids on New York State DOT contracts in the data, from 03 FEB 2022 to 17 SEP 2026, and was the low bidder on 18 of them (22%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $106,040,618
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 18 | 3 | 17% |
| 2023 | 18 | 6 | 33% |
| 2024 | 19 | 3 | 16% |
| 2025 | 16 | 5 | 31% |
| 2026 | 10 | 1 | 10% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 32 | 4 | 13% |
| Region 03 | 23 | 6 | 26% |
| Region 06 | 19 | 7 | 37% |
| Region 02 | 4 | 0 | 0% |
| Region 07 | 2 | 0 | 0% |
| Region 04 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 73 | 73 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 72 | 72 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 71 | 71 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 70 | 70 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 69 | 69 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 44 | 37 (84%) | $0.35 | $1.00 |
| 627.50140008 | 32 | 28 (88%) | $1.00 | $6.00 | ||
| Epoxy-Coated Bar Reinforcement for Structures | 556.0202 | LB | 33 | 27 (82%) | $1.55 | $3.25 |
| Embankment In Place | 203.03 | CY | 38 | 23 (61%) | $20.00 | $43.11 |
| Unclassified Excavation and Disposal | 203.02 | CY | 46 | 22 (48%) | $31.25 | $71.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 22 | 22 (100%) | $75.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vector Construction Corp | 38 | 18 of 38 |
| Slate Hill Constructors Inc | 37 | 11 of 37 |
| Bothar Construction LLC | 32 | 19 of 32 |
| R De Vincentis Construction Inc | 21 | 14 of 21 |
| Cold Spring Construction Company | 13 | 4 of 13 |
| Lancaster Development and Tully Construction Co LLC | 13 | 6 of 13 |
| The L C Whitford Co Inc | 10 | 2 of 10 |
| Tioga Construction Company Inc | 10 | 4 of 10 |
| Sealand Contractors Corp. | 8 | 0 of 8 |
| Power Line Constructors Inc | 6 | 4 of 6 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265806 | Region 09 | RT 23 bridge replacement over Canasawacta Creek | 5 of 7 | $5,186,158 | +14% |
| 27 AUG 2026 | D265794 | Region 09 | Large Culvert Replacement. | 2 of 6 | $9,699,997 | +4.0% |
| 16 JUL 2026 | D265796 | Region 03 | I-81 OVER RT 11 NEDROW BRIDGE REPLACEMENT | 2 of 6 | $18,545,642 | +1.0% |
| 07 MAY 2026 | D265797 | Region 09 | Rt17 ApproachSlabReplace, Tn of Union & Vestal, Broome Cnty | 3 of 3 | $5,715,756 | +25% |
| 16 APR 2026 | D265765 | Region 09 | HIGHWAY SIGN INSTALLATION - Various Locations | 6 of 6 | $4,888,888 | +80% |
| 09 APR 2026 | D265723 | Region 03 | Regional Deck and Joint Repair Project | 1 of 2 | $2,666,666 | Low, 7.0% under the second |
| 12 MAR 2026 | D265700 | Region 09 | Rehabilitation of I-86 Bridges over ICRR | 3 of 4 | $7,997,098 | +18% |
| 26 FEB 2026 | D265675 | Region 09 | Overhead Sign Structure Replacement | 2 of 3 | $2,398,983 | +17% |
| 22 JAN 2026 | D265629 | Region 09 | BRIDGE DECK REPLACEMENT - NYS Route 434 Over Choconut Creek | 5 of 5 | $5,407,754 | +24% |
| 22 JAN 2026 | D265674 | Region 09 | RETAINING WALL IMPROVEMENT - NY Route 52 | 3 of 5 | $3,886,334 | +13% |
| 20 NOV 2025 | D265586 | Region 04 | BRIDGE DECK REPLACEMENT - Route 14 over CSX | 1 of 2 | $6,828,827 | Low, 17% under the second |
| 25 SEP 2025 | D265574 | Region 03 | Regional Signal Project | 1 of 5 | $2,778,278 | Low, 2.0% under the second |
| 11 SEP 2025 | D265517 | Region 09 | BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek | 3 of 5 | $4,497,779 | +12% |
| 07 AUG 2025 | D265493 | Region 03 | Route 221 Over Big Brook Bridge Replacement | 3 of 6 | $2,696,697 | +5.0% |
| 07 AUG 2025 | D265555 | Region 06 | I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS | 1 of 6 | $5,045,496 | Low, 4.0% under the second |
| 10 JUL 2025 | D265389 | Region 09 | Large Culvert Rehabilitation Project. | 3 of 7 | $9,975,954 | +10% |
| 26 JUN 2025 | D265474 | Region 03 | Large Culvert Rehabilitation Project | 1 of 4 | $3,975,954 | Low, 19% under the second |
| 08 MAY 2025 | D265486 | Region 03 | Regional SAFETAP Project | 2 of 2 | $9,996,660 | +32% |
| 27 MAR 2025 | D265475 | Region 06 | BRIDGE REPLACEMENT - NY Rt 14 | 2 of 2 | $13,735,195 | +17% |
| 13 MAR 2025 | D265467 | Region 06 | CONCRETE & CULVERT REHABILITATION - I-86 & NY Rt 352 | 1 of 2 | $6,699,697 | Low, 0.0% under the second |
| 27 FEB 2025 | D265423 | Region 03 | Highway Reconstruction Rt 370 Liverpool | 2 of 5 | $14,470,105 | +4.0% |
| 23 JAN 2025 | D265376 | Region 09 | JOC Bridge Maintenance, Broome County, 2025-2026 | 3 of 4 | $902,463 | +14% |
| 23 JAN 2025 | D265377 | Region 09 | JOC Bridge Maintenance, 2025-2026 | 3 of 3 | $919,818 | +12% |
| 23 JAN 2025 | D265378 | Region 09 | JOC Bridge Maintenance, 2025-2026 | 3 of 3 | $954,528 | +15% |
| 23 JAN 2025 | D265379 | Region 09 | JOC Bridge Maintenance 2025-2026, Chenango & Tioga Counties | 3 of 4 | $902,463 | +14% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.