NYSDOT contract D265797 bid tabulation
Rt17 ApproachSlabReplace, Tn of Union & Vestal, Broome Cnty. Let by New York State DOT on May 7, 2026, Broome, Region 09. 3 bids received; low bid $4,586,239 by Lancaster Development and Tully Construction Co LLC.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 68
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lancaster Development and Tully Construction Co LLC | $4,586,239 | Low |
| 2 | R De Vincentis Construction Inc | $5,520,000 | +20% |
| 3 | Economy Paving Co Inc | $5,715,756 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lancaster Development and Tully Construction Co LLC | 2. R De Vincentis Construction Inc | 3. Economy Paving Co Inc |
|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 951 | $75.00 | $23.00 | $55.00 |
| 2 | Embankment In Place (203.03) | CY | 84 | $77.80 | $26.00 | $10.00 |
| 3 | (203.24010017) | 38 | $104.00 | $122.00 | $10.00 | |
| 4 | Seed – Temporary (209.100102) | SY | 269 | $1.60 | $6.00 | $5.00 |
| 5 | Sediment Filter Log – Temporary, 12″, Type A (209.1311) | LF | 5,820 | $6.75 | $10.00 | $5.15 |
| 6 | Drainage Structure Inlet Protection, Fiber Roll – Temporary, 12", (209.171010) | LF | 106 | $9.20 | $36.00 | $10.00 |
| 7 | (304.00010018) | 12,603 | $1.05 | $4.00 | $0.10 | |
| 8 | Subbase Course, Optional Type (304.15) | CY | 1,030 | $120.00 | $112.00 | $125.00 |
| 9 | (404.0982) | TON | 1,100 | $125.00 | $230.00 | $145.00 |
| 10 | (404.1289) | TON | 130 | $209.00 | $290.00 | $145.00 |
| 11 | (404.2589) | TON | 519 | $146.00 | $206.00 | $145.00 |
| 12 | (404.4489) | TON | 982 | $135.00 | $206.00 | $145.00 |
| 13 | (407.01040009) | 820 | $11.90 | $11.00 | $3.65 | |
| 14 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 8,005 | $0.10 | $5.00 | $0.35 |
| 15 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 2,632 | $7.00 | $15.00 | $19.01 |
| 16 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,488 | $12.00 | $22.00 | $25.00 |
| 17 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 2,703 | $2.95 | $9.00 | $1.15 |
| 18 | (557.05013011) | 2,574 | $254.00 | $165.00 | $235.00 | |
| 19 | (557.1012) | SY | 250 | $815.00 | $620.00 | $2,225.00 |
| 20 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $9.47 | $9.47 | $9.47 |
| 21 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 250 | $108.00 | $129.00 | $120.00 |
| 22 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,240 | $4.40 | $1.75 | $1.75 |
| 23 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 64,381 | $0.91 | $1.75 | $0.75 |
| 24 | Armorless Bridge Joint (567.60) | LF | 839 | $438.00 | $485.00 | $525.00 |
| 25 | Reinforcing Bar Exposure (579.02) | SF | 4,119 | $49.10 | $75.00 | $40.00 |
| 26 | Removal of Structural Concrete (580.01) | CY | 77 | $4,160.00 | $6,300.00 | $5,500.00 |
| 27 | Removal of Concrete Approach Slab (580.04) | SF | 4,480 | $2.25 | $15.00 | $20.00 |
| 28 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 1,408 | $75.60 | $40.00 | $30.00 |
| 29 | (604.070401) | EACH | 4 | $3,280.00 | $7,000.00 | $3,500.00 |
| 30 | Box Beam Guide Railing (606.10) | LF | 40 | $84.20 | $82.00 | $75.00 |
| 31 | Box Beam Median Barrier (606.11) | LF | 792 | $110.00 | $107.00 | $95.00 |
| 32 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 40 | $5.90 | $7.00 | $10.00 |
| 33 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 792 | $5.90 | $7.00 | $10.00 |
| 34 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 3 | $650.00 | $300.00 | $500.00 |
| 35 | Stone Curb – Bridge (Type A) (609.0301) | LF | 20 | $223.00 | $195.00 | $215.00 |
| 36 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 80 | $256.00 | $90.00 | $215.00 |
| 37 | Resetting Existing Curb (609.15) | LF | 80 | $251.00 | $130.00 | $150.00 |
| 38 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 388 | $75.90 | $112.00 | $10.00 |
| 39 | Turf Establishment – Performance (610.1605) | SY | 7,260 | $16.90 | $3.50 | $2.00 |
| 40 | (617.11000024) | LS | 1 | $1,400.00 | $6,000.00 | $100.00 |
| 41 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $153,000 | $400,000 | $865,000 |
| 42 | Type III Construction Barricades (619.04) | EACH | 72 | $117.00 | $340.00 | $250.00 |
| 43 | (619.080101) | LF | 49,789 | $0.93 | $1.80 | $0.75 |
| 44 | (619.080102) | LF | 17,630 | $1.20 | $1.95 | $1.00 |
| 45 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 9,215 | $7.65 | $4.90 | $7.50 |
| 46 | (619.10010125) | 49,789 | $0.46 | $0.65 | $0.50 | |
| 47 | (619.100103) | LF | 9,224 | $6.50 | $4.50 | $5.50 |
| 48 | (619.100203) | EACH | 6 | $589.00 | $600.00 | $500.00 |
| 49 | (619.110511) | EACH | 6 | $4,660.00 | $17,500 | $15,000 |
| 50 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 8,214 | $70.30 | $73.00 | $55.00 |
| 51 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 4 | $13,800 | $7,000.00 | $10,000 |
| 52 | Temporary Sand Barrel Module (619.21) | EACH | 4 | $1,220.00 | $4,500.00 | $500.00 |
| 53 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $34,000 | $316,000 | $250,000 |
| 54 | Survey Operations (625.01) | LS | 1 | $48,188 | $23,000 | $30,000 |
| 55 | (627.50140008) | 6,608 | $4.25 | $5.00 | $0.50 | |
| 56 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,800.00 | $6,000.00 | $10,000 |
| 57 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 6 | $8,290.00 | $2,900.00 | $4,000.00 |
| 58 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 59 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 8,384 | $1.45 | $3.00 | $3.00 |
| 60 | Welded Frame & Rectangular Grate 6 (655.1006) | EACH | 4 | $1,700.00 | $2,000.00 | $1,000.00 |
| 61 | (685.16010009) | 3,750 | $1.75 | $1.75 | $1.50 | |
| 62 | (685.16010014) | 11,126 | $3.55 | $1.75 | $3.50 | |
| 63 | (685.17010014) | 9,993 | $3.55 | $1.75 | $5.00 | |
| 64 | Field Change Payment (FCP) (697.03) | DOL | 137,000 | $1.00 | $1.00 | $1.00 |
| 65 | Asphalt Price Adjustment (698.04) | DOL | 749.88 | $1.00 | $1.00 | $1.00 |
| 66 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 67 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 68 | Mobilization (699.040001) | LS | 1 | $175,970 | $211,493 | $200,302 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.