Lancaster Development and Tully Construction Co LLC: NYSDOT bid record
Lancaster Development and Tully Construction Co LLC submitted 45 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 27 AUG 2026, and was the low bidder on 4 of them (9%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $241,623,923
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 15 | 0 | 0% |
| 2023 | 8 | 1 | 13% |
| 2024 | 6 | 0 | 0% |
| 2025 | 5 | 0 | 0% |
| 2026 | 11 | 3 | 27% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 29 | 3 | 10% |
| Region 03 | 5 | 1 | 20% |
| Region 08 | 4 | 0 | 0% |
| Region 02 | 3 | 0 | 0% |
| Region 01 | 2 | 0 | 0% |
| Region 07 | 1 | 0 | 0% |
| Region 06 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 45 | 45 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 45 | 45 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 45 | 45 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 45 | 45 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| 691.04000020 | 27 | 27 (100%) | $1.00 | $1.00 | ||
| Construction Testing supplies – Consumables | 637.36 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 20 | 20 (100%) | $75.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 17 | 17 (100%) | $75.00 | $85.00 |
| 407.01040009 | 22 | 12 (55%) | $3.20 | $7.50 | ||
| Rain Gauge | 637.26 | EACH | 14 | 12 (86%) | $75.40 | $200.00 |
| Longitudinal Joint Density Quality Adjustment to Asphalt Items | 404.000031 | QUALITY UNIT | 12 | 12 (100%) | $75.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bothar Construction LLC | 21 | 17 of 21 |
| Economy Paving Co Inc | 13 | 7 of 13 |
| Slate Hill Constructors Inc | 10 | 8 of 10 |
| Vector Construction Corp | 10 | 7 of 10 |
| Cobleskill Stone Products Inc. | 8 | 6 of 8 |
| Barrett Paving Materials Inc | 7 | 4 of 7 |
| Suit-Kote Corporation | 6 | 5 of 6 |
| R De Vincentis Construction Inc | 6 | 3 of 6 |
| Cci Companies Inc | 5 | 5 of 5 |
| Sealand Contractors Corp. | 5 | 1 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265794 | Region 09 | Large Culvert Replacement. | 6 of 6 | $12,822,851 | +38% |
| 27 AUG 2026 | D265810 | Region 09 | NY 201 Pavement Resurfacing, Flyover to Harry L. Drive | 3 of 3 | $13,434,308 | +36% |
| 30 JUL 2026 | D265702 | Region 03 | I-81 VIADUCT (COMMUNITY GRID) - CONTRACT 6A | 1 of 3 | $143,519,598 | Low, 38% under the second |
| 16 JUL 2026 | D265796 | Region 03 | I-81 OVER RT 11 NEDROW BRIDGE REPLACEMENT | 6 of 6 | $22,508,224 | +23% |
| 25 JUN 2026 | D265768 | Region 02 | BRIDGE PROJECT - North Genesee Street Gateway, City of Utica | 2 of 4 | $77,868,474 | +25% |
| 25 JUN 2026 | D265805 | Region 02 | ROUTE 5S & 30A MONTGOMERY COUNTY PAVING REHABILITATION | 4 of 4 | $5,769,549 | +16% |
| 07 MAY 2026 | D265753 | Region 09 | HIGHWAY/BRIDGE BINGHAMTON GATEWAY PROJECT -NY 363 | 1 of 2 | $46,620,502 | Low, 6.0% under the second |
| 07 MAY 2026 | D265797 | Region 09 | Rt17 ApproachSlabReplace, Tn of Union & Vestal, Broome Cnty | 1 of 3 | $4,586,239 | Low, 20% under the second |
| 26 MAR 2026 | D265744 | Region 09 | PAVEMENT MAINTENANCE - Various Locations. | 2 of 2 | $18,860,612 | +26% |
| 12 MAR 2026 | D265736 | Region 09 | I86 CRACK & SEAT, OWEGO TO APALACHIN | 2 of 2 | $57,990,239 | +9.0% |
| 05 FEB 2026 | D265682 | Region 09 | HIGHWAY MILL & FILL - I-81 Exit 13B to 21 | 2 of 4 | $21,177,450 | +14% |
| 07 AUG 2025 | D265555 | Region 06 | I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS | 3 of 6 | $5,504,704 | +9.0% |
| 10 JUL 2025 | D265389 | Region 09 | Large Culvert Rehabilitation Project. | 4 of 7 | $9,993,781 | +10% |
| 27 MAR 2025 | D265446 | Region 09 | I88 RESURFACING AND JOINT REPAIRS | 3 of 3 | $16,451,125 | +24% |
| 20 FEB 2025 | D265402 | Region 08 | REHAB/IMPROVEMENTS & CULVERT REPLACEMENTS- NYS Rts 94 & 17A | 3 of 5 | $34,399,347 | +13% |
| 23 JAN 2025 | D265369 | Region 09 | INTERSECTION RECONSTRUCTION - Routes 7 & 23 | 6 of 6 | $5,272,328 | +30% |
| 19 DEC 2024 | D265297 | Region 08 | HIGHWAY & BRIDGE RECONSTRUCTION - NY Route 17 at Exit 122 | 4 of 8 | $78,238,645 | +15% |
| 26 SEP 2024 | D265276 | Region 09 | Route 11 Retaining Wall, City of Binghamton | 2 of 4 | $7,562,300 | +10% |
| 12 SEP 2024 | D265304 | Region 03 | Rt 481 NB Off Ramp at Circle and Rt 481 Safety Improvements | 3 of 9 | $3,204,430 | +8.0% |
| 08 AUG 2024 | D265289 | Region 09 | I88 - REST AREA TRUCK PARKING EXPANSION | 3 of 3 | $2,693,196 | +17% |
| 29 FEB 2024 | D265195 | Region 09 | US RT11 - (COURT ST) Resurfacing, Binghamton | 3 of 4 | $4,972,678 | +26% |
| 08 FEB 2024 | D265154 | Region 09 | I-88 Crack and Seat, Exit 18 to 19, Otsego County | 3 of 3 | $31,669,844 | +45% |
| 26 OCT 2023 | D265091 | Region 09 | RT 17 APALACHIN TO BROOME COUNTY LINE, CRACK & SEAT | 1 of 4 | $46,897,583 | Low, 10% under the second |
| 24 AUG 2023 | D265070 | Region 09 | BRIDGE REHAB, I-81 OVER LOUGHLIN ROAD, PILE RETROFIT | 3 of 9 | $6,994,130 | +4.0% |
| 10 AUG 2023 | D265062 | Region 09 | PEDESTRIAN BRIDGE REMOVAL - Over I-81, Town of Dickinson. | 6 of 9 | $847,218 | +59% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.