NYSDOT contract D265753 bid tabulation

HIGHWAY/BRIDGE BINGHAMTON GATEWAY PROJECT -NY 363. Let by New York State DOT on May 7, 2026, Broome, Region 09. 2 bids received; low bid $46,620,502 by Lancaster Development and Tully Construction Co LLC.

Owner
New York State DOT
Letting
07 MAY 2026
Pay items
424
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lancaster Development and Tully Construction Co LLC$46,620,502Low
2Bothar Construction LLC$49,522,770+6.0%
NYSDOT contract D265753: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lancaster Development and Tully Construction Co LLC2. Bothar Construction LLC
1Clearing and Grubbing (201.07)ACRE7.39$5,000.00$15,000
2 (202.120001)LS1$118,000$204,391
3Removal of Substructures (202.19)CY630$177.00$191.00
4Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202)SF7,741$45.10$27.00
5 (203.01990006)210$119.00$127.80
6Unclassified Excavation and Disposal (203.02)CY51,202$33.00$49.15
7Embankment In Place (203.03)CY87,172.59$0.01$49.85
8Select Granular Fill (203.07)CY4,170$143.00$77.20
9Select Structural Fill (203.21)CY99$179.00$100.50
10Controlled Low Strength Material (CLSM) (204.01)CY208$637.00$638.40
11Structure Excavation (206.01)CY12,684$38.10$55.85
12Trench and Culvert Excavation (206.0201)CY14,153$56.90$55.35
13Conduit Excavation and Backfill including Surface Restoration (206.03)LF12,489$52.00$88.55
14Geotextile Bedding (207.20)SY125$4.40$21.35
15Geotextile Drainage (207.22)SY2,322$5.75$3.50
16Prefabricated Composite Structural Drain (207.26)SY103$31.80$24.50
17 (208.01000409)1,145$118.00$96.00
18Mulch – Temporary (209.100101)SY232$4.60$7.65
19Seed and Mulch – Temporary (209.1003)SY10,000$1.75$1.55
20Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703)LF491$19.60$32.45
21Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901)SY748$12.00$3.75
22Soil Stabilizers, Class IV Type A (209.2101)SY41,086$1.60$2.00
23Stabilized Construction Access (209.22)SY362$62.60$25.05
24 (209.23010009)17,314$5.40$3.45
25Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3314)LS1$43,056$43,056
26 (210.481201)SF1,760$8.95$51.75
27 (210.481202)SF1,760$8.95$51.75
28Subbase Course, Optional Type (304.15)CY16,424$90.90$66.55
29 (404.0289)TON2,472$135.00$124.30
30 (404.0962)TON1,267$200.00$170.00
31 (404.1969)TON2,110$151.00$148.50
32 (404.2569)TON3,766$135.00$140.10
33 (404.4389)TON256$140.00$138.20
34 (404.4589)TON638$119.00$131.50
35 (407.01040009)3,036.95$16.50$7.50
36Asphalt Pavement Joint Adhesive (418.7603)LF22,962$0.85$0.65
37Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY538.44$19.00$18.35
38Miscellaneous Cold Milling of Portland Cement Concrete (490.40)SY546$5.00$29.50
39 (502.0022)6,175$636.00$654.10
40 (502.0222)70$1,990.00$1,226.00
41 (502.9100)16,609$23.60$12.90
42Longitudinal Joints (502.9110)LF14,216$12.70$10.90
43Sealing Transverse Joints- Highway Joint Sealant (502.9210)LF16,609$12.30$2.30
44Sealing Longitudinal Joints-Highway Joint Sealant (502.9310)LF14,216$12.30$2.20
45Performance Concrete Quality Adjustment - PCC Pavement (502.99)QUALITY UNIT1$2.03$2.03
46Production Grinding – New PCC Pavement with Slurry Removal (505.0202)SY24,700$40.00$15.50
47 (553.04010109)LS1$5,000.00$66,464
48 (554.3001)SF4,420.61$77.90$91.10
49Fill Type Retaining Wall (0 – 6 ft.) (554.40)SF1,290$198.00$207.70
50Fill Type Retaining Wall (Greater than 6 ft. – 12 ft.) (554.41)SF4,453$189.00$195.20
51Fill Type Retaining Wall (Greater than 12 ft. – 18 ft.) (554.42)SF3,389$167.00$176.80
52Fill Type Retaining Wall (Greater than 18 ft. – 24 ft.) (554.43)SF1,065$163.00$176.90
53Footing Concrete, Performance (555.0011)CY23$1,750.00$1,507.00
54Concrete for Structures, Performance (555.0021)CY292$2,640.00$2,302.00
55 (555.72940001)9,665$20.00$0.90
56Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$11.50$11.50
57Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$6.75$6.75
58Uncoated Steel Fabric Reinforcement for Structures (556.0101)SY26$121.00$77.40
59Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB11,672$5.50$2.20
60Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB36,988$3.15$2.85
61Stud Shear Connectors for Bridges (556.03)EACH3,568$6.90$7.35
62 (557.1013)SY248$1,040.00$738.60
63 (557.1113)SY882$814.00$587.60
64Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY1,130$16.90$5.65
65 (557.60010004)995$26.40$51.50
66Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$15.80$15.80
67Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY995$26.60$27.65
68Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF8,978$1.45$2.65
69Protective Sealing of New Structural Concrete (559.02)SF3,284$4.75$2.60
70Protective Sealing of Concrete with Coating Type Protective Sealer (559.04)SQUAREFOOT4,747$2.35$5.30
71 (559.23010008)213$21.80$17.80
72 (559.91100010)14,005$3.00$1.30
73 (560.10070008)807$2.95$15.20
74 (560.80010011)2,301$17.80$45.25
75 (564.0501)LS1$105,000$92,062
76 (564.11000010)44$2,360.00$2,192.00
77 (564.47040007)26$5,890.00$3,271.00
78 (564.510001)LB2,161$35.00$34.90
79Type E.B. Fixed Bearing (56 to 111 k) (565.2022)EACH8$5,440.00$2,546.00
80Type E.B. Expansion Bearing (56 to 111 k) (565.2032)EACH40$5,500.00$2,385.00
81Armorless Bridge Joint (567.60)LF63$414.00$459.80
82Vertical Faced Concrete Parapet (569.03)LF204$1,050.00$3,617.00
83Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF300$458.00$448.20
84Single Slope (Full-Section) Concrete Bridge Barrier (569.05)LF155$402.00$410.00
85Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$11.63$11.63
86Lead-Exposure Control Plan (570.01)LS1$2,360.00$1,725.00
87Medical Testing (570.02)DOL1,000$1.00$1.00
88Personal-Exposure-Monitoring Sample Analysis (570.03)DOL1,000$1.00$1.00
89Decontamination Facilities (570.04)CALENDAR WEEK4$589.00$115.00
90 (570.150001)LS1$1.00$142,600
91Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB5,084$1.00$0.57
92 (572.010001)SF458$17.50$18.60
93 (573.010001)LS1$1.00$335,292
94Removal of Structural Concrete (580.01)CY140$1,670.00$1,521.00
95Removal and Replacement of Structural Concrete (582.0052)SF130$388.00$303.40
96 (585.01)EACH16$1.00$4,700.00
97 (585.02)EACH32$1.00$5,690.00
98Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH204$136.00$113.60
99Bridge Railing Removal and Disposal (587.01)LF19$54.40$25.40
100 (589.010001)LB6,880$3.55$1.05
101 (589.520001)EACH82$707.00$360.90
102 (589.520002)EACH48$707.00$338.90
103 (595.50000018)354$81.70$7.60
104 (603.061610)LF18$315.00$435.90
105 (603.171116)EACH1$768.00$1,455.00
106 (603.171216)EACH2$794.00$1,502.00
107 (603.171416)EACH3$1,020.00$2,042.00
108 (603.6202)LF408$113.00$120.30
109 (603.6203)LF720$135.00$127.40
110 (603.6205)LF24$214.00$164.50
111 (603.7302)EACH1$2,490.00$3,179.00
112 (603.7303)EACH1$2,620.00$3,325.00
113Concrete Collars (603.77)EACH15$2,910.00$2,618.00
114 (603.9815)LF4,856.30$74.30$56.95
115 (603.9818)LF1,055.40$83.30$63.60
116 (604.070401)EACH7$5,940.00$889.60
117 (604.070402)EACH1$5,940.00$7,076.00
118 (604.070403)EACH1$5,940.00$7,076.00
119 (604.070404)EACH1$5,940.00$7,076.00
120 (604.070405)EACH1$5,940.00$7,076.00
121 (604.07260011)23$1,540.00$1,934.00
122 (604.300103)LF17$721.00$969.80
123 (604.300611)LF10.70$666.00$730.60
124 (604.300711)LF8.60$925.00$1,012.00
125 (604.302016)LF220$463.00$752.90
126 (604.302091)LF190$469.00$673.70
127 (604.302122)LF106.42$483.00$782.90
128 (604.302192)LF51.60$513.00$683.90
129 (604.310211)LF7.60$920.00$1,012.00
130 (604.4060)LF200$565.00$710.50
131Underdrain Filter, Type I (605.0901)CY631.33$500.00$131.30
132Underdrain Filter, Type II (605.1001)CY616$124.00$133.30
133 (605.1502)LF50$23.10$7.55
134 (605.1602)LF602$23.40$23.20
135 (605.16020008)48$83.30$133.60
136 (605.1701)LF17,061.97$4.25$2.25
137 (605.1702)LF48$28.90$6.30
138Box Beam Guide Railing (606.10)LF4,083$56.60$55.20
139Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF781$70.70$69.00
140Box Beam Median Barrier (606.11)LF542$76.60$74.75
141Box Beam End Piece (606.120101)EACH1$990.00$966.00
142Box Beam Guide Railing End Assembly Type I (606.120102)EACH6$5,010.00$4,887.50
143Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH1$2,590.00$2,530.00
144Box Beam Median Barrier End Assembly, Type A (606.1401)EACH1$4,600.00$4,485.00
145Box Beam Median Barrier End Assembly, Type B (606.1402)EACH1$3,930.00$3,829.50
146Single-Slope Concrete Median Barrier (Optional) (606.3041)LF1,978$247.00$241.90
147Resetting Box Beam Guide Railing (New Posts) (606.5348)LF230$37.70$36.80
148Resetting Box Beam Median Barrier (New Posts) (606.5448)LF202$44.80$43.70
149Removing and Disposing Corrugated Beam Guide Railing (606.71)LF113.30$12.10$4.90
150Removing and Disposing Box Beam Guide Railing (606.73)LF5,578.75$8.60$8.10
151Removing and Disposing Box Beam Median Barrier (606.74)LF190$9.00$8.10
152Removing and Disposing Concrete Barrier (606.75)LF1,439$23.80$11.40
153Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH2$856.00$884.70
154Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH11$747.00$884.70
155 (606.85020001)1$253.00$269.10
156Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001)EACH1$7,710.00$11,395
157 (607.3102)LF989$59.00$66.70
158 (607.41010010)2,089$8.75$8.90
159 (607.96000008)1,335$14.20$7.55
160Concrete Sidewalks and Driveways (608.0101)CY554$1,370.00$1,243.00
161 (608.01020005)312$1,660.00$1,467.00
162Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON1,730$150.00$148.40
163 (608.21000003)35$478.00$506.90
164Stone Curb – Near Vertical Face (NVF) (609.0212)LF17,120.77$76.70$58.45
165Stone Curb – Bridge (Type F1) (609.0302)LF21$123.00$97.75
166 (609.0401)LF128$122.00$100.20
167 (609.15100002)456$23.60$20.70
168Fertilizer (610.0501)LB911$3.55$11.50
169Compost (610.10)CY1,255$78.70$132.90
170Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY189$88.40$69.00
171Weed Removal (610.13)SY77,771$0.59$0.86
172Topsoil - Roadside (610.1402)CY7,514$112.00$71.35
173 (610.15120208)6,109.90$0.96$4.15
174Turf Establishment -Lawns (610.1602)SY26,134$2.60$1.73
175Turf Establishment – Restoration/High Traffic (610.1603)SY9,148$1.75$1.73
176Turf Establishment – Nurse Crops (610.1606)SY2,475$2.05$1.38
177 (610.16090824)10,257.56$1.75$1.73
178 (610.16091124)1,987$1.75$1.73
179 (610.16091324)9,422$1.75$1.73
180 (610.16091624)11,227$1.75$1.73
181 (610.16093024)2,705$1.75$1.73
182 (610.16093124)11,227$1.75$1.73
183Wildflower Seeding (610.17)SY11,408.25$2.35$2.30
184Watering Vegetation (610.19)1,000 GALLONS6,733$4.70$3.45
185Mowing (610.21)SY899,144$0.01$0.57
186Mowing Limits Markers (610.22)EACH20$236.00$115.00
187 (611.0122)EACH64$589.00$402.50
188 (611.0151)EACH130$943.00$517.50
189 (611.0161)EACH25$1,180.00$552.00
190 (611.0201)EACH33$943.00$517.50
191 (611.0342)EACH3$472.00$460.00
192 (611.0351)EACH104$648.00$575.00
193 (611.0442)EACH90$118.00$92.00
194 (611.0552)EACH180$236.00$92.00
195 (611.0712)EACH3,120$17.70$23.00
196 (611.0741)EACH892$70.70$23.00
197 (611.19010024)219$35.40$11.50
198 (611.19020024)33$23.60$11.50
199 (611.19030024)107$17.70$11.50
200 (611.19040024)90$5.90$5.75
201 (611.19050024)182$11.80$5.75
202 (611.19070024)892$2.35$5.75
203Improvement of Vegetated Areas (614.05)SY976$2.00$4.25
204 (614.060101)EACH1$250.00$1,322.00
205 (614.060104)EACH4$350.00$1,469.00
206 (614.060204)EACH16$425.00$1,763.00
207 (614.060302)EACH1$550.00$3,918.00
208 (614.060304)EACH3$750.00$5,876.00
209 (614.060404)EACH6$950.00$8,814.00
210 (614.060504)EACH5$1,150.00$8,814.00
211Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH1$4,000.00$4,018.00
212 (615.01010110)6$2,540.00$2,524.00
213 (615.08010005)13$3,970.00$2,660.00
214 (615.27020010)2$1,980.00$822.20
215 (615.99060104)743$391.00$171.90
216 (615.99060204)10$1,670.00$1,057.00
217 (617.01010024)15,575$0.59$11.50
218 (617.01020024)950$2.35$5.75
219 (617.01030024)2,302$8.25$17.80
220 (617.10000024)2,302$32.70$142.80
221 (617.11000024)LS1$12,300$9,294.00
222Basic Work Zone Traffic Control (619.01)LS1$2,701,000$2,000,000
223Type III Construction Barricades (619.04)EACH67$114.00$104.00
224Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF7,000$7.65$7.48
225 (619.100101)LF79,338.67$0.36$0.35
226 (619.100104)LF32,440.22$6.55$6.35
227 (619.100204)EACH4$357.00$345.00
228 (619.110511)EACH1$28,300$35,293
229Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH19$619.00$546.25
230 (619.161401)EACH1$41,600$19,205
231Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713)LF1,363$33.00$75.10
232Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,886.50$33.90$112.90
233Temporary Concrete Barrier Face to Box Beam Transition (619.1722)EACH2$21,400$17,355
234Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH5$24,700$6,544.00
235Pavement Patching (Force Acount) (619.2601)DOL50,000$1.00$1.00
236Stone Filling (Light) (620.03)CY3$371.00$469.00
237Stone Filling (Medium) (620.04)CY54.78$206.00$504.70
238Bedding Material, Type 2 (620.0802)CY8.76$317.00$461.50
239Cleaning Closed Drainage Systems (621.03)LF1,059$17.60$8.80
240Cleaning Drainage Structures (621.04)EACH11$767.00$345.00
241Crushed Stone (In-Place Measure) (623.12)CY6$198.00$478.40
242Survey Operations (625.01)LS1$877,221$562,542
243 (625.130001)EACH1$151,000$46,177
244 (625.130002)EACH1$151,000$46,177
245 (625.130003)EACH1$151,000$46,177
246 (625.150001)EACH1$177,000$91,235
247 (627.50140008)1,210$14.00$10.10
248 (634.10010015)LS1$10,000$102,090
249Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF1,805$2.15$2.06
250Cleaning and Preparation of Pavement Surfaces-Letters (635.0203)EACH10$59.50$57.50
251Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303)EACH12$357.00$345.00
252Field Laboratory (637.01)EACH1$48,700$1,877.00
253Concrete Cylinder Curing Equipment (637.04)EACH1$3,950.00$4,380.00
254Engineer’s Field Office – Type 3 (637.13)MONTH31$8,820.00$3,129.00
255Rain Gauge (637.26)EACH1$70.70$250.30
256Office Technology and Supplies (637.34)DOL12,700$1.00$1.00
257Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00
258 (637.41000115)31$140.00$121.10
259 (637.41000215)31$140.00$121.10
260 (637.41000315)31$140.00$121.10
261 (639.21010011)LS1$200,000$250,302
262 (642.31100024)20,000$1.20$1.15
263Anchor Bolts (644.11)LB5,247$9.45$9.20
264Drilled Shaft for Overhead Sign Structures (644.20)CY132$2,000.00$4,004.00
265 (644.433560)EACH1$206,000$201,250
266 (644.434560)EACH1$277,000$270,250
267Performance Concrete Quality Adjustment (644.99)QUALITY UNIT1$20.00$20.00
268Ground-Mounted Sign Panels without Z-bars (645.5101)SF97$64.90$63.25
269Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF491$46.00$44.85
270Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF74$44.80$43.70
271Overhead Sign Panels (645.61)SF1,020$49.50$48.30
272Type A Sign Posts (645.81)EACH94$200.00$195.50
273High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH2$1,360.00$1,322.50
274 (645.81090003)12$94.30$92.00
275Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH5$472.00$460.00
276Reference Marker Panel (646.21)EACH17$40.10$39.10
277Steel Post, 1.1 lb/ft (646.31)EACH13$64.90$63.25
278 (647.18010108)1$3,500.00$2,632.00
279Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20)EACH2$10,100$15,043
280Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21)EACH1$18,900$24,304
281Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25)EACH2$637.00$621.00
282Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH3$236.00$230.00
283Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH1$94.30$92.00
284Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH4$70.70$69.00
285Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52)EACH1$389.00$379.50
286Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53)EACH1$766.00$747.50
287Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH95$76.60$74.75
288Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH2$389.00$379.50
289Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH5$389.00$379.50
290 (647.83001002)7$25.90$25.30
291 (651.01010009)1$26,500$25,415
292Concrete Foundation for Impact Attenuators (654.05)CY7$5,270.00$1,744.00
293Expendable Impact Attenuator , TL 3, ≤ 2 ft Obstruction Width (654.5030)EACH4$24,000$27,179
294Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902)EACH32$1,910.00$2,028.00
295Parallel Bar Frame 12 PCB & Parallel Bar Grate 12 PCB (655.0903)EACH7$2,120.00$2,160.00
296Welded Frame & Reticuline Grate 3 (655.1103)EACH3$924.00$1,551.00
297Welded Frame & Reticuline Grate 11 (655.1111)EACH3$1,740.00$1,993.00
298Welded Frame & Reticuline Grate 16 (655.1116)EACH36$2,080.00$1,894.00
299Welded Frame & Reticuline Grate 22 (655.1122)EACH18$1,220.00$2,079.00
300Manhole Frame & Cover (655.1202)EACH24$1,480.00$1,521.00
301 (660.65000101)14$4,440.00$843.90
302 (662.60000108)1,000$1.00$1.00
303 (662.60000208)1,000$1.00$1.00
304 (662.60010004)2,000$1.00$1.00
305 (663.0110)LF183$150.00$177.00
306 (663.0112)LF78$300.00$217.30
307 (663.1110)EACH1$6,910.00$6,797.00
308 (663.1112)EACH1$7,870.00$7,561.00
309Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB1,878$16.40$5.70
310 (663.2110)EACH8$414.00$796.60
311 (663.2112)EACH2$431.00$796.60
312Adjust Existing Valve Box Elevation (663.33)EACH7$1,120.00$504.90
313Remove and Dispose of Existing Water Valve & Valve Box (663.42)EACH2$249.00$717.80
314 (670.00100105)6$18,400$12,305
315 (670.01009009)9$19,200$18,285
316 (670.01009709)43$26,200$23,886
317 (670.01015809)37$1,550.00$2,461.00
318 (670.0106)EACH15$3,340.00$4,450.50
319 (670.0107)EACH73$3,470.00$4,588.50
320 (670.03020008)39$1,490.00$736.00
321 (670.1110)EACH6$2,850.00$3,105.00
322 (670.1117)EACH9$3,220.00$3,346.50
323 (670.1125)EACH43$3,530.00$3,611.00
324 (670.1126)EACH4$3,590.00$3,645.50
325 (670.1130)EACH30$3,950.00$4,341.25
326 (670.1204)EACH9$1,450.00$655.50
327 (670.1208)EACH43$1,490.00$778.55
328 (670.1308)EACH37$1,980.00$1,315.60
329Breakaway Transformer Base (Aluminum) (670.19)EACH29$1,160.00$1,258.10
330 (670.2002)LF25$49.50$24.15
331 (670.20170111)25$130.00$85.10
332 (670.2303)LF332$87.90$77.05
333 (670.2306)LF2,032$142.00$127.65
334 (670.2601)LF242$27.20$10.35
335 (670.2602)LF20,276$31.00$14.95
336 (670.30010109)9$3,710.00$3,272.90
337Pullboxes over 10 to 15 cubic feet, inside volume (Lighting) (670.3020)EACH50$3,220.00$2,978.50
338Cast Iron Junction Boxes (670.40)EACH9$5,880.00$2,814.05
339 (670.41090611)1$1,240.00$2,119.45
340 (670.50030104)12$32,100$31,020
341 (670.50110310)8$1,610.00$3,193.55
342 (670.53070104)1$18,000$3,602.95
343Photoelectric Controls (670.60)EACH2$557.00$195.50
344 (670.7004)LF23,344$4.65$4.60
345 (670.7006)LF20$32.20$2.30
346Ground Wire No. 6 AWG. (670.7501)LF11,672$4.65$4.60
347 (670.75010025)50$14.90$4.60
348 (670.75030025)20$17.30$2.30
349 (670.81200010)4$891.00$767.05
350Remove Lamppost Foundation (670.82)EACH43$627.00$316.25
351Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$12.46$12.46
352 (671.00010011)LS1$9,410.00$15,857
353 (680.05010007)3$39,900$36,110
354 (680.05020007)3$8,420.00$5,514.25
355 (680.10010001)9$1,860.00$6,024.85
356 (680.10020001)2$3,710.00$1,819.30
357 (680.10040001)15$396.00$1,186.80
358Pole Excavation and Concrete Foundation (680.5001)CY45$4,430.00$4,363.10
359Concrete Base for Controller Cabinet (680.5002)EACH3$4,210.00$4,163.00
360Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH1$3,340.00$1,719.25
361 (680.50500005)12$314.00$571.55
362 (680.510301)EACH13$3,530.00$2,766.90
363 (680.510401)EACH3$3,900.00$2,840.50
364 (680.510501)EACH17$3,470.00$2,541.50
365 (680.51200011)3$5,820.00$6,132.95
366 (680.520106)LF331$38.40$35.65
367 (680.520108)LF1,526$71.80$59.80
368 (680.520110)LF30$83.00$75.90
369 (680.56050008)1$5,080.00$3,734.05
370 (680.590430)EACH7$28,500$38,818
371 (680.590431)EACH1$28,800$40,408
372 (680.670801)EACH10$2,600.00$2,576.00
373 (680.6712)EACH11$3,010.00$3,116.50
374 (680.6806)EACH2$3,470.00$2,005.60
375Dual Span Wire Assembly with Upper Tether Wire (680.7002)EACH6$3,340.00$5,456.75
376 (680.730214)LF120$6.40$3.45
377 (680.730514)LF3,044$6.45$4.60
378 (680.730714)LF3,069$7.60$5.75
379 (680.77000105)1$11,800$7,705.00
380 (680.77000205)1$11,800$7,705.00
381 (680.77000305)1$28,100$16,215
382 (680.79000105)1$19,200$9,752.00
383 (680.79010008)LS1$19,200$6,628.60
384 (680.791634)EACH1$50,300$43,005
385 (680.80324515)2$4,330.00$4,272.25
386 (680.80324603)2$2,350.00$1,943.50
387Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH37$119.00$51.75
388Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH37$254.00$295.55
389Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH11$916.00$851.00
390Pedestrian Signal Section - Polycarbonate, Type I, for 16-inch by 18-inch LED module (680.813109)EACH11$322.00$343.85
391Pedestrian Signal Bracket Mount Assembly (680.8141)EACH2$848.00$649.75
392Pedestrian Signal Post Top Mount Assembly (680.8142)EACH11$384.00$448.50
393Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002)EACH12$365.00$292.10
394 (680.8151)EACH12$1,840.00$1,560.55
395 (680.8152)EACH1$1,840.00$5,646.50
396Backplates for Traffic Signal Heads (680.8199)EACH17$303.00$470.35
397 (680.8204)EACH9$1,240.00$1,238.55
398 (680.8205)EACH6$1,270.00$1,138.50
399 (680.8207)EACH1$1,300.00$2,336.80
400 (680.8210)EACH9$1,240.00$1,311.00
401Breakaway Transformer Base (680.8223)EACH13$1,360.00$1,117.80
402 (680.82250101)1$16.10$103.50
403 (680.82250801)15$681.00$517.50
404 (680.82540009)150$16.10$4.60
405Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH2$898.00$770.50
406 (680.950106)LF499$6.00$5.75
407 (680.950306)LF50$18.30$10.35
408 (680.95110009)2$4,330.00$8,964.25
409Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$11.02$11.02
410 (680.99470025)1$21,800$10,885
411White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF30,867.50$1.20$1.15
412Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF17,806$1.20$1.15
413 (685.15000025)1,670$3.55$3.45
414White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF9,299$4.25$4.13
415White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH72$89.30$86.25
416White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH42$268.00$258.75
417 (690.11001505)LS1$25,800$14,659
418 (690.11002505)LS1$14,200$36,306
419 (691.04000020)170,000$1.00$1.00
420Field Change Payment (FCP) (697.03)DOL3,242,000$1.00$1.00
421Asphalt Price Adjustment (698.04)DOL8,752$1.00$1.00
422Fuel Price Adjustment (698.05)DOL6,570$1.00$1.00
423Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00
424Mobilization (699.040001)LS1$1,788,785$1,900,000
NYSDOT contract D265753: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy