NYSDOT contract D265753 bid tabulation
HIGHWAY/BRIDGE BINGHAMTON GATEWAY PROJECT -NY 363. Let by New York State DOT on May 7, 2026, Broome, Region 09. 2 bids received; low bid $46,620,502 by Lancaster Development and Tully Construction Co LLC.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 424
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lancaster Development and Tully Construction Co LLC | $46,620,502 | Low |
| 2 | Bothar Construction LLC | $49,522,770 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lancaster Development and Tully Construction Co LLC | 2. Bothar Construction LLC |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 7.39 | $5,000.00 | $15,000 |
| 2 | (202.120001) | LS | 1 | $118,000 | $204,391 |
| 3 | Removal of Substructures (202.19) | CY | 630 | $177.00 | $191.00 |
| 4 | Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202) | SF | 7,741 | $45.10 | $27.00 |
| 5 | (203.01990006) | 210 | $119.00 | $127.80 | |
| 6 | Unclassified Excavation and Disposal (203.02) | CY | 51,202 | $33.00 | $49.15 |
| 7 | Embankment In Place (203.03) | CY | 87,172.59 | $0.01 | $49.85 |
| 8 | Select Granular Fill (203.07) | CY | 4,170 | $143.00 | $77.20 |
| 9 | Select Structural Fill (203.21) | CY | 99 | $179.00 | $100.50 |
| 10 | Controlled Low Strength Material (CLSM) (204.01) | CY | 208 | $637.00 | $638.40 |
| 11 | Structure Excavation (206.01) | CY | 12,684 | $38.10 | $55.85 |
| 12 | Trench and Culvert Excavation (206.0201) | CY | 14,153 | $56.90 | $55.35 |
| 13 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 12,489 | $52.00 | $88.55 |
| 14 | Geotextile Bedding (207.20) | SY | 125 | $4.40 | $21.35 |
| 15 | Geotextile Drainage (207.22) | SY | 2,322 | $5.75 | $3.50 |
| 16 | Prefabricated Composite Structural Drain (207.26) | SY | 103 | $31.80 | $24.50 |
| 17 | (208.01000409) | 1,145 | $118.00 | $96.00 | |
| 18 | Mulch – Temporary (209.100101) | SY | 232 | $4.60 | $7.65 |
| 19 | Seed and Mulch – Temporary (209.1003) | SY | 10,000 | $1.75 | $1.55 |
| 20 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 491 | $19.60 | $32.45 |
| 21 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 748 | $12.00 | $3.75 |
| 22 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 41,086 | $1.60 | $2.00 |
| 23 | Stabilized Construction Access (209.22) | SY | 362 | $62.60 | $25.05 |
| 24 | (209.23010009) | 17,314 | $5.40 | $3.45 | |
| 25 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3314) | LS | 1 | $43,056 | $43,056 |
| 26 | (210.481201) | SF | 1,760 | $8.95 | $51.75 |
| 27 | (210.481202) | SF | 1,760 | $8.95 | $51.75 |
| 28 | Subbase Course, Optional Type (304.15) | CY | 16,424 | $90.90 | $66.55 |
| 29 | (404.0289) | TON | 2,472 | $135.00 | $124.30 |
| 30 | (404.0962) | TON | 1,267 | $200.00 | $170.00 |
| 31 | (404.1969) | TON | 2,110 | $151.00 | $148.50 |
| 32 | (404.2569) | TON | 3,766 | $135.00 | $140.10 |
| 33 | (404.4389) | TON | 256 | $140.00 | $138.20 |
| 34 | (404.4589) | TON | 638 | $119.00 | $131.50 |
| 35 | (407.01040009) | 3,036.95 | $16.50 | $7.50 | |
| 36 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 22,962 | $0.85 | $0.65 |
| 37 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 538.44 | $19.00 | $18.35 |
| 38 | Miscellaneous Cold Milling of Portland Cement Concrete (490.40) | SY | 546 | $5.00 | $29.50 |
| 39 | (502.0022) | 6,175 | $636.00 | $654.10 | |
| 40 | (502.0222) | 70 | $1,990.00 | $1,226.00 | |
| 41 | (502.9100) | 16,609 | $23.60 | $12.90 | |
| 42 | Longitudinal Joints (502.9110) | LF | 14,216 | $12.70 | $10.90 |
| 43 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 16,609 | $12.30 | $2.30 |
| 44 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 14,216 | $12.30 | $2.20 |
| 45 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 1 | $2.03 | $2.03 |
| 46 | Production Grinding – New PCC Pavement with Slurry Removal (505.0202) | SY | 24,700 | $40.00 | $15.50 |
| 47 | (553.04010109) | LS | 1 | $5,000.00 | $66,464 |
| 48 | (554.3001) | SF | 4,420.61 | $77.90 | $91.10 |
| 49 | Fill Type Retaining Wall (0 – 6 ft.) (554.40) | SF | 1,290 | $198.00 | $207.70 |
| 50 | Fill Type Retaining Wall (Greater than 6 ft. – 12 ft.) (554.41) | SF | 4,453 | $189.00 | $195.20 |
| 51 | Fill Type Retaining Wall (Greater than 12 ft. – 18 ft.) (554.42) | SF | 3,389 | $167.00 | $176.80 |
| 52 | Fill Type Retaining Wall (Greater than 18 ft. – 24 ft.) (554.43) | SF | 1,065 | $163.00 | $176.90 |
| 53 | Footing Concrete, Performance (555.0011) | CY | 23 | $1,750.00 | $1,507.00 |
| 54 | Concrete for Structures, Performance (555.0021) | CY | 292 | $2,640.00 | $2,302.00 |
| 55 | (555.72940001) | 9,665 | $20.00 | $0.90 | |
| 56 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $11.50 | $11.50 |
| 57 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.75 | $6.75 |
| 58 | Uncoated Steel Fabric Reinforcement for Structures (556.0101) | SY | 26 | $121.00 | $77.40 |
| 59 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 11,672 | $5.50 | $2.20 |
| 60 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 36,988 | $3.15 | $2.85 |
| 61 | Stud Shear Connectors for Bridges (556.03) | EACH | 3,568 | $6.90 | $7.35 |
| 62 | (557.1013) | SY | 248 | $1,040.00 | $738.60 |
| 63 | (557.1113) | SY | 882 | $814.00 | $587.60 |
| 64 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 1,130 | $16.90 | $5.65 |
| 65 | (557.60010004) | 995 | $26.40 | $51.50 | |
| 66 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $15.80 | $15.80 |
| 67 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 995 | $26.60 | $27.65 |
| 68 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 8,978 | $1.45 | $2.65 |
| 69 | Protective Sealing of New Structural Concrete (559.02) | SF | 3,284 | $4.75 | $2.60 |
| 70 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 4,747 | $2.35 | $5.30 |
| 71 | (559.23010008) | 213 | $21.80 | $17.80 | |
| 72 | (559.91100010) | 14,005 | $3.00 | $1.30 | |
| 73 | (560.10070008) | 807 | $2.95 | $15.20 | |
| 74 | (560.80010011) | 2,301 | $17.80 | $45.25 | |
| 75 | (564.0501) | LS | 1 | $105,000 | $92,062 |
| 76 | (564.11000010) | 44 | $2,360.00 | $2,192.00 | |
| 77 | (564.47040007) | 26 | $5,890.00 | $3,271.00 | |
| 78 | (564.510001) | LB | 2,161 | $35.00 | $34.90 |
| 79 | Type E.B. Fixed Bearing (56 to 111 k) (565.2022) | EACH | 8 | $5,440.00 | $2,546.00 |
| 80 | Type E.B. Expansion Bearing (56 to 111 k) (565.2032) | EACH | 40 | $5,500.00 | $2,385.00 |
| 81 | Armorless Bridge Joint (567.60) | LF | 63 | $414.00 | $459.80 |
| 82 | Vertical Faced Concrete Parapet (569.03) | LF | 204 | $1,050.00 | $3,617.00 |
| 83 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 300 | $458.00 | $448.20 |
| 84 | Single Slope (Full-Section) Concrete Bridge Barrier (569.05) | LF | 155 | $402.00 | $410.00 |
| 85 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $11.63 | $11.63 |
| 86 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,360.00 | $1,725.00 |
| 87 | Medical Testing (570.02) | DOL | 1,000 | $1.00 | $1.00 |
| 88 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 1,000 | $1.00 | $1.00 |
| 89 | Decontamination Facilities (570.04) | CALENDAR WEEK | 4 | $589.00 | $115.00 |
| 90 | (570.150001) | LS | 1 | $1.00 | $142,600 |
| 91 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 5,084 | $1.00 | $0.57 |
| 92 | (572.010001) | SF | 458 | $17.50 | $18.60 |
| 93 | (573.010001) | LS | 1 | $1.00 | $335,292 |
| 94 | Removal of Structural Concrete (580.01) | CY | 140 | $1,670.00 | $1,521.00 |
| 95 | Removal and Replacement of Structural Concrete (582.0052) | SF | 130 | $388.00 | $303.40 |
| 96 | (585.01) | EACH | 16 | $1.00 | $4,700.00 |
| 97 | (585.02) | EACH | 32 | $1.00 | $5,690.00 |
| 98 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 204 | $136.00 | $113.60 |
| 99 | Bridge Railing Removal and Disposal (587.01) | LF | 19 | $54.40 | $25.40 |
| 100 | (589.010001) | LB | 6,880 | $3.55 | $1.05 |
| 101 | (589.520001) | EACH | 82 | $707.00 | $360.90 |
| 102 | (589.520002) | EACH | 48 | $707.00 | $338.90 |
| 103 | (595.50000018) | 354 | $81.70 | $7.60 | |
| 104 | (603.061610) | LF | 18 | $315.00 | $435.90 |
| 105 | (603.171116) | EACH | 1 | $768.00 | $1,455.00 |
| 106 | (603.171216) | EACH | 2 | $794.00 | $1,502.00 |
| 107 | (603.171416) | EACH | 3 | $1,020.00 | $2,042.00 |
| 108 | (603.6202) | LF | 408 | $113.00 | $120.30 |
| 109 | (603.6203) | LF | 720 | $135.00 | $127.40 |
| 110 | (603.6205) | LF | 24 | $214.00 | $164.50 |
| 111 | (603.7302) | EACH | 1 | $2,490.00 | $3,179.00 |
| 112 | (603.7303) | EACH | 1 | $2,620.00 | $3,325.00 |
| 113 | Concrete Collars (603.77) | EACH | 15 | $2,910.00 | $2,618.00 |
| 114 | (603.9815) | LF | 4,856.30 | $74.30 | $56.95 |
| 115 | (603.9818) | LF | 1,055.40 | $83.30 | $63.60 |
| 116 | (604.070401) | EACH | 7 | $5,940.00 | $889.60 |
| 117 | (604.070402) | EACH | 1 | $5,940.00 | $7,076.00 |
| 118 | (604.070403) | EACH | 1 | $5,940.00 | $7,076.00 |
| 119 | (604.070404) | EACH | 1 | $5,940.00 | $7,076.00 |
| 120 | (604.070405) | EACH | 1 | $5,940.00 | $7,076.00 |
| 121 | (604.07260011) | 23 | $1,540.00 | $1,934.00 | |
| 122 | (604.300103) | LF | 17 | $721.00 | $969.80 |
| 123 | (604.300611) | LF | 10.70 | $666.00 | $730.60 |
| 124 | (604.300711) | LF | 8.60 | $925.00 | $1,012.00 |
| 125 | (604.302016) | LF | 220 | $463.00 | $752.90 |
| 126 | (604.302091) | LF | 190 | $469.00 | $673.70 |
| 127 | (604.302122) | LF | 106.42 | $483.00 | $782.90 |
| 128 | (604.302192) | LF | 51.60 | $513.00 | $683.90 |
| 129 | (604.310211) | LF | 7.60 | $920.00 | $1,012.00 |
| 130 | (604.4060) | LF | 200 | $565.00 | $710.50 |
| 131 | Underdrain Filter, Type I (605.0901) | CY | 631.33 | $500.00 | $131.30 |
| 132 | Underdrain Filter, Type II (605.1001) | CY | 616 | $124.00 | $133.30 |
| 133 | (605.1502) | LF | 50 | $23.10 | $7.55 |
| 134 | (605.1602) | LF | 602 | $23.40 | $23.20 |
| 135 | (605.16020008) | 48 | $83.30 | $133.60 | |
| 136 | (605.1701) | LF | 17,061.97 | $4.25 | $2.25 |
| 137 | (605.1702) | LF | 48 | $28.90 | $6.30 |
| 138 | Box Beam Guide Railing (606.10) | LF | 4,083 | $56.60 | $55.20 |
| 139 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 781 | $70.70 | $69.00 |
| 140 | Box Beam Median Barrier (606.11) | LF | 542 | $76.60 | $74.75 |
| 141 | Box Beam End Piece (606.120101) | EACH | 1 | $990.00 | $966.00 |
| 142 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 6 | $5,010.00 | $4,887.50 |
| 143 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $2,590.00 | $2,530.00 |
| 144 | Box Beam Median Barrier End Assembly, Type A (606.1401) | EACH | 1 | $4,600.00 | $4,485.00 |
| 145 | Box Beam Median Barrier End Assembly, Type B (606.1402) | EACH | 1 | $3,930.00 | $3,829.50 |
| 146 | Single-Slope Concrete Median Barrier (Optional) (606.3041) | LF | 1,978 | $247.00 | $241.90 |
| 147 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 230 | $37.70 | $36.80 |
| 148 | Resetting Box Beam Median Barrier (New Posts) (606.5448) | LF | 202 | $44.80 | $43.70 |
| 149 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 113.30 | $12.10 | $4.90 |
| 150 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 5,578.75 | $8.60 | $8.10 |
| 151 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 190 | $9.00 | $8.10 |
| 152 | Removing and Disposing Concrete Barrier (606.75) | LF | 1,439 | $23.80 | $11.40 |
| 153 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 2 | $856.00 | $884.70 |
| 154 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 11 | $747.00 | $884.70 |
| 155 | (606.85020001) | 1 | $253.00 | $269.10 | |
| 156 | Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001) | EACH | 1 | $7,710.00 | $11,395 |
| 157 | (607.3102) | LF | 989 | $59.00 | $66.70 |
| 158 | (607.41010010) | 2,089 | $8.75 | $8.90 | |
| 159 | (607.96000008) | 1,335 | $14.20 | $7.55 | |
| 160 | Concrete Sidewalks and Driveways (608.0101) | CY | 554 | $1,370.00 | $1,243.00 |
| 161 | (608.01020005) | 312 | $1,660.00 | $1,467.00 | |
| 162 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 1,730 | $150.00 | $148.40 |
| 163 | (608.21000003) | 35 | $478.00 | $506.90 | |
| 164 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 17,120.77 | $76.70 | $58.45 |
| 165 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 21 | $123.00 | $97.75 |
| 166 | (609.0401) | LF | 128 | $122.00 | $100.20 |
| 167 | (609.15100002) | 456 | $23.60 | $20.70 | |
| 168 | Fertilizer (610.0501) | LB | 911 | $3.55 | $11.50 |
| 169 | Compost (610.10) | CY | 1,255 | $78.70 | $132.90 |
| 170 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 189 | $88.40 | $69.00 |
| 171 | Weed Removal (610.13) | SY | 77,771 | $0.59 | $0.86 |
| 172 | Topsoil - Roadside (610.1402) | CY | 7,514 | $112.00 | $71.35 |
| 173 | (610.15120208) | 6,109.90 | $0.96 | $4.15 | |
| 174 | Turf Establishment -Lawns (610.1602) | SY | 26,134 | $2.60 | $1.73 |
| 175 | Turf Establishment – Restoration/High Traffic (610.1603) | SY | 9,148 | $1.75 | $1.73 |
| 176 | Turf Establishment – Nurse Crops (610.1606) | SY | 2,475 | $2.05 | $1.38 |
| 177 | (610.16090824) | 10,257.56 | $1.75 | $1.73 | |
| 178 | (610.16091124) | 1,987 | $1.75 | $1.73 | |
| 179 | (610.16091324) | 9,422 | $1.75 | $1.73 | |
| 180 | (610.16091624) | 11,227 | $1.75 | $1.73 | |
| 181 | (610.16093024) | 2,705 | $1.75 | $1.73 | |
| 182 | (610.16093124) | 11,227 | $1.75 | $1.73 | |
| 183 | Wildflower Seeding (610.17) | SY | 11,408.25 | $2.35 | $2.30 |
| 184 | Watering Vegetation (610.19) | 1,000 GALLONS | 6,733 | $4.70 | $3.45 |
| 185 | Mowing (610.21) | SY | 899,144 | $0.01 | $0.57 |
| 186 | Mowing Limits Markers (610.22) | EACH | 20 | $236.00 | $115.00 |
| 187 | (611.0122) | EACH | 64 | $589.00 | $402.50 |
| 188 | (611.0151) | EACH | 130 | $943.00 | $517.50 |
| 189 | (611.0161) | EACH | 25 | $1,180.00 | $552.00 |
| 190 | (611.0201) | EACH | 33 | $943.00 | $517.50 |
| 191 | (611.0342) | EACH | 3 | $472.00 | $460.00 |
| 192 | (611.0351) | EACH | 104 | $648.00 | $575.00 |
| 193 | (611.0442) | EACH | 90 | $118.00 | $92.00 |
| 194 | (611.0552) | EACH | 180 | $236.00 | $92.00 |
| 195 | (611.0712) | EACH | 3,120 | $17.70 | $23.00 |
| 196 | (611.0741) | EACH | 892 | $70.70 | $23.00 |
| 197 | (611.19010024) | 219 | $35.40 | $11.50 | |
| 198 | (611.19020024) | 33 | $23.60 | $11.50 | |
| 199 | (611.19030024) | 107 | $17.70 | $11.50 | |
| 200 | (611.19040024) | 90 | $5.90 | $5.75 | |
| 201 | (611.19050024) | 182 | $11.80 | $5.75 | |
| 202 | (611.19070024) | 892 | $2.35 | $5.75 | |
| 203 | Improvement of Vegetated Areas (614.05) | SY | 976 | $2.00 | $4.25 |
| 204 | (614.060101) | EACH | 1 | $250.00 | $1,322.00 |
| 205 | (614.060104) | EACH | 4 | $350.00 | $1,469.00 |
| 206 | (614.060204) | EACH | 16 | $425.00 | $1,763.00 |
| 207 | (614.060302) | EACH | 1 | $550.00 | $3,918.00 |
| 208 | (614.060304) | EACH | 3 | $750.00 | $5,876.00 |
| 209 | (614.060404) | EACH | 6 | $950.00 | $8,814.00 |
| 210 | (614.060504) | EACH | 5 | $1,150.00 | $8,814.00 |
| 211 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 1 | $4,000.00 | $4,018.00 |
| 212 | (615.01010110) | 6 | $2,540.00 | $2,524.00 | |
| 213 | (615.08010005) | 13 | $3,970.00 | $2,660.00 | |
| 214 | (615.27020010) | 2 | $1,980.00 | $822.20 | |
| 215 | (615.99060104) | 743 | $391.00 | $171.90 | |
| 216 | (615.99060204) | 10 | $1,670.00 | $1,057.00 | |
| 217 | (617.01010024) | 15,575 | $0.59 | $11.50 | |
| 218 | (617.01020024) | 950 | $2.35 | $5.75 | |
| 219 | (617.01030024) | 2,302 | $8.25 | $17.80 | |
| 220 | (617.10000024) | 2,302 | $32.70 | $142.80 | |
| 221 | (617.11000024) | LS | 1 | $12,300 | $9,294.00 |
| 222 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $2,701,000 | $2,000,000 |
| 223 | Type III Construction Barricades (619.04) | EACH | 67 | $114.00 | $104.00 |
| 224 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 7,000 | $7.65 | $7.48 |
| 225 | (619.100101) | LF | 79,338.67 | $0.36 | $0.35 |
| 226 | (619.100104) | LF | 32,440.22 | $6.55 | $6.35 |
| 227 | (619.100204) | EACH | 4 | $357.00 | $345.00 |
| 228 | (619.110511) | EACH | 1 | $28,300 | $35,293 |
| 229 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 19 | $619.00 | $546.25 |
| 230 | (619.161401) | EACH | 1 | $41,600 | $19,205 |
| 231 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 1,363 | $33.00 | $75.10 |
| 232 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,886.50 | $33.90 | $112.90 |
| 233 | Temporary Concrete Barrier Face to Box Beam Transition (619.1722) | EACH | 2 | $21,400 | $17,355 |
| 234 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 5 | $24,700 | $6,544.00 |
| 235 | Pavement Patching (Force Acount) (619.2601) | DOL | 50,000 | $1.00 | $1.00 |
| 236 | Stone Filling (Light) (620.03) | CY | 3 | $371.00 | $469.00 |
| 237 | Stone Filling (Medium) (620.04) | CY | 54.78 | $206.00 | $504.70 |
| 238 | Bedding Material, Type 2 (620.0802) | CY | 8.76 | $317.00 | $461.50 |
| 239 | Cleaning Closed Drainage Systems (621.03) | LF | 1,059 | $17.60 | $8.80 |
| 240 | Cleaning Drainage Structures (621.04) | EACH | 11 | $767.00 | $345.00 |
| 241 | Crushed Stone (In-Place Measure) (623.12) | CY | 6 | $198.00 | $478.40 |
| 242 | Survey Operations (625.01) | LS | 1 | $877,221 | $562,542 |
| 243 | (625.130001) | EACH | 1 | $151,000 | $46,177 |
| 244 | (625.130002) | EACH | 1 | $151,000 | $46,177 |
| 245 | (625.130003) | EACH | 1 | $151,000 | $46,177 |
| 246 | (625.150001) | EACH | 1 | $177,000 | $91,235 |
| 247 | (627.50140008) | 1,210 | $14.00 | $10.10 | |
| 248 | (634.10010015) | LS | 1 | $10,000 | $102,090 |
| 249 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 1,805 | $2.15 | $2.06 |
| 250 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 10 | $59.50 | $57.50 |
| 251 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 12 | $357.00 | $345.00 |
| 252 | Field Laboratory (637.01) | EACH | 1 | $48,700 | $1,877.00 |
| 253 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,950.00 | $4,380.00 |
| 254 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 31 | $8,820.00 | $3,129.00 |
| 255 | Rain Gauge (637.26) | EACH | 1 | $70.70 | $250.30 |
| 256 | Office Technology and Supplies (637.34) | DOL | 12,700 | $1.00 | $1.00 |
| 257 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 258 | (637.41000115) | 31 | $140.00 | $121.10 | |
| 259 | (637.41000215) | 31 | $140.00 | $121.10 | |
| 260 | (637.41000315) | 31 | $140.00 | $121.10 | |
| 261 | (639.21010011) | LS | 1 | $200,000 | $250,302 |
| 262 | (642.31100024) | 20,000 | $1.20 | $1.15 | |
| 263 | Anchor Bolts (644.11) | LB | 5,247 | $9.45 | $9.20 |
| 264 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 132 | $2,000.00 | $4,004.00 |
| 265 | (644.433560) | EACH | 1 | $206,000 | $201,250 |
| 266 | (644.434560) | EACH | 1 | $277,000 | $270,250 |
| 267 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $20.00 | $20.00 |
| 268 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 97 | $64.90 | $63.25 |
| 269 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 491 | $46.00 | $44.85 |
| 270 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 74 | $44.80 | $43.70 |
| 271 | Overhead Sign Panels (645.61) | SF | 1,020 | $49.50 | $48.30 |
| 272 | Type A Sign Posts (645.81) | EACH | 94 | $200.00 | $195.50 |
| 273 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 2 | $1,360.00 | $1,322.50 |
| 274 | (645.81090003) | 12 | $94.30 | $92.00 | |
| 275 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 5 | $472.00 | $460.00 |
| 276 | Reference Marker Panel (646.21) | EACH | 17 | $40.10 | $39.10 |
| 277 | Steel Post, 1.1 lb/ft (646.31) | EACH | 13 | $64.90 | $63.25 |
| 278 | (647.18010108) | 1 | $3,500.00 | $2,632.00 | |
| 279 | Removal of Cantilever Overhead Sign Panel(s), Structure, and Foundations (647.20) | EACH | 2 | $10,100 | $15,043 |
| 280 | Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21) | EACH | 1 | $18,900 | $24,304 |
| 281 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 2 | $637.00 | $621.00 |
| 282 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $236.00 | $230.00 |
| 283 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 1 | $94.30 | $92.00 |
| 284 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 4 | $70.70 | $69.00 |
| 285 | Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52) | EACH | 1 | $389.00 | $379.50 |
| 286 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 1 | $766.00 | $747.50 |
| 287 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 95 | $76.60 | $74.75 |
| 288 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $389.00 | $379.50 |
| 289 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 5 | $389.00 | $379.50 |
| 290 | (647.83001002) | 7 | $25.90 | $25.30 | |
| 291 | (651.01010009) | 1 | $26,500 | $25,415 | |
| 292 | Concrete Foundation for Impact Attenuators (654.05) | CY | 7 | $5,270.00 | $1,744.00 |
| 293 | Expendable Impact Attenuator , TL 3, ≤ 2 ft Obstruction Width (654.5030) | EACH | 4 | $24,000 | $27,179 |
| 294 | Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902) | EACH | 32 | $1,910.00 | $2,028.00 |
| 295 | Parallel Bar Frame 12 PCB & Parallel Bar Grate 12 PCB (655.0903) | EACH | 7 | $2,120.00 | $2,160.00 |
| 296 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 3 | $924.00 | $1,551.00 |
| 297 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 3 | $1,740.00 | $1,993.00 |
| 298 | Welded Frame & Reticuline Grate 16 (655.1116) | EACH | 36 | $2,080.00 | $1,894.00 |
| 299 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 18 | $1,220.00 | $2,079.00 |
| 300 | Manhole Frame & Cover (655.1202) | EACH | 24 | $1,480.00 | $1,521.00 |
| 301 | (660.65000101) | 14 | $4,440.00 | $843.90 | |
| 302 | (662.60000108) | 1,000 | $1.00 | $1.00 | |
| 303 | (662.60000208) | 1,000 | $1.00 | $1.00 | |
| 304 | (662.60010004) | 2,000 | $1.00 | $1.00 | |
| 305 | (663.0110) | LF | 183 | $150.00 | $177.00 |
| 306 | (663.0112) | LF | 78 | $300.00 | $217.30 |
| 307 | (663.1110) | EACH | 1 | $6,910.00 | $6,797.00 |
| 308 | (663.1112) | EACH | 1 | $7,870.00 | $7,561.00 |
| 309 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 1,878 | $16.40 | $5.70 |
| 310 | (663.2110) | EACH | 8 | $414.00 | $796.60 |
| 311 | (663.2112) | EACH | 2 | $431.00 | $796.60 |
| 312 | Adjust Existing Valve Box Elevation (663.33) | EACH | 7 | $1,120.00 | $504.90 |
| 313 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 2 | $249.00 | $717.80 |
| 314 | (670.00100105) | 6 | $18,400 | $12,305 | |
| 315 | (670.01009009) | 9 | $19,200 | $18,285 | |
| 316 | (670.01009709) | 43 | $26,200 | $23,886 | |
| 317 | (670.01015809) | 37 | $1,550.00 | $2,461.00 | |
| 318 | (670.0106) | EACH | 15 | $3,340.00 | $4,450.50 |
| 319 | (670.0107) | EACH | 73 | $3,470.00 | $4,588.50 |
| 320 | (670.03020008) | 39 | $1,490.00 | $736.00 | |
| 321 | (670.1110) | EACH | 6 | $2,850.00 | $3,105.00 |
| 322 | (670.1117) | EACH | 9 | $3,220.00 | $3,346.50 |
| 323 | (670.1125) | EACH | 43 | $3,530.00 | $3,611.00 |
| 324 | (670.1126) | EACH | 4 | $3,590.00 | $3,645.50 |
| 325 | (670.1130) | EACH | 30 | $3,950.00 | $4,341.25 |
| 326 | (670.1204) | EACH | 9 | $1,450.00 | $655.50 |
| 327 | (670.1208) | EACH | 43 | $1,490.00 | $778.55 |
| 328 | (670.1308) | EACH | 37 | $1,980.00 | $1,315.60 |
| 329 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 29 | $1,160.00 | $1,258.10 |
| 330 | (670.2002) | LF | 25 | $49.50 | $24.15 |
| 331 | (670.20170111) | 25 | $130.00 | $85.10 | |
| 332 | (670.2303) | LF | 332 | $87.90 | $77.05 |
| 333 | (670.2306) | LF | 2,032 | $142.00 | $127.65 |
| 334 | (670.2601) | LF | 242 | $27.20 | $10.35 |
| 335 | (670.2602) | LF | 20,276 | $31.00 | $14.95 |
| 336 | (670.30010109) | 9 | $3,710.00 | $3,272.90 | |
| 337 | Pullboxes over 10 to 15 cubic feet, inside volume (Lighting) (670.3020) | EACH | 50 | $3,220.00 | $2,978.50 |
| 338 | Cast Iron Junction Boxes (670.40) | EACH | 9 | $5,880.00 | $2,814.05 |
| 339 | (670.41090611) | 1 | $1,240.00 | $2,119.45 | |
| 340 | (670.50030104) | 12 | $32,100 | $31,020 | |
| 341 | (670.50110310) | 8 | $1,610.00 | $3,193.55 | |
| 342 | (670.53070104) | 1 | $18,000 | $3,602.95 | |
| 343 | Photoelectric Controls (670.60) | EACH | 2 | $557.00 | $195.50 |
| 344 | (670.7004) | LF | 23,344 | $4.65 | $4.60 |
| 345 | (670.7006) | LF | 20 | $32.20 | $2.30 |
| 346 | Ground Wire No. 6 AWG. (670.7501) | LF | 11,672 | $4.65 | $4.60 |
| 347 | (670.75010025) | 50 | $14.90 | $4.60 | |
| 348 | (670.75030025) | 20 | $17.30 | $2.30 | |
| 349 | (670.81200010) | 4 | $891.00 | $767.05 | |
| 350 | Remove Lamppost Foundation (670.82) | EACH | 43 | $627.00 | $316.25 |
| 351 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $12.46 | $12.46 |
| 352 | (671.00010011) | LS | 1 | $9,410.00 | $15,857 |
| 353 | (680.05010007) | 3 | $39,900 | $36,110 | |
| 354 | (680.05020007) | 3 | $8,420.00 | $5,514.25 | |
| 355 | (680.10010001) | 9 | $1,860.00 | $6,024.85 | |
| 356 | (680.10020001) | 2 | $3,710.00 | $1,819.30 | |
| 357 | (680.10040001) | 15 | $396.00 | $1,186.80 | |
| 358 | Pole Excavation and Concrete Foundation (680.5001) | CY | 45 | $4,430.00 | $4,363.10 |
| 359 | Concrete Base for Controller Cabinet (680.5002) | EACH | 3 | $4,210.00 | $4,163.00 |
| 360 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $3,340.00 | $1,719.25 |
| 361 | (680.50500005) | 12 | $314.00 | $571.55 | |
| 362 | (680.510301) | EACH | 13 | $3,530.00 | $2,766.90 |
| 363 | (680.510401) | EACH | 3 | $3,900.00 | $2,840.50 |
| 364 | (680.510501) | EACH | 17 | $3,470.00 | $2,541.50 |
| 365 | (680.51200011) | 3 | $5,820.00 | $6,132.95 | |
| 366 | (680.520106) | LF | 331 | $38.40 | $35.65 |
| 367 | (680.520108) | LF | 1,526 | $71.80 | $59.80 |
| 368 | (680.520110) | LF | 30 | $83.00 | $75.90 |
| 369 | (680.56050008) | 1 | $5,080.00 | $3,734.05 | |
| 370 | (680.590430) | EACH | 7 | $28,500 | $38,818 |
| 371 | (680.590431) | EACH | 1 | $28,800 | $40,408 |
| 372 | (680.670801) | EACH | 10 | $2,600.00 | $2,576.00 |
| 373 | (680.6712) | EACH | 11 | $3,010.00 | $3,116.50 |
| 374 | (680.6806) | EACH | 2 | $3,470.00 | $2,005.60 |
| 375 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 6 | $3,340.00 | $5,456.75 |
| 376 | (680.730214) | LF | 120 | $6.40 | $3.45 |
| 377 | (680.730514) | LF | 3,044 | $6.45 | $4.60 |
| 378 | (680.730714) | LF | 3,069 | $7.60 | $5.75 |
| 379 | (680.77000105) | 1 | $11,800 | $7,705.00 | |
| 380 | (680.77000205) | 1 | $11,800 | $7,705.00 | |
| 381 | (680.77000305) | 1 | $28,100 | $16,215 | |
| 382 | (680.79000105) | 1 | $19,200 | $9,752.00 | |
| 383 | (680.79010008) | LS | 1 | $19,200 | $6,628.60 |
| 384 | (680.791634) | EACH | 1 | $50,300 | $43,005 |
| 385 | (680.80324515) | 2 | $4,330.00 | $4,272.25 | |
| 386 | (680.80324603) | 2 | $2,350.00 | $1,943.50 | |
| 387 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 37 | $119.00 | $51.75 |
| 388 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 37 | $254.00 | $295.55 |
| 389 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 11 | $916.00 | $851.00 |
| 390 | Pedestrian Signal Section - Polycarbonate, Type I, for 16-inch by 18-inch LED module (680.813109) | EACH | 11 | $322.00 | $343.85 |
| 391 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $848.00 | $649.75 |
| 392 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 11 | $384.00 | $448.50 |
| 393 | Pedestrian Signal Module - 16-inch x 18-inch, Bi-Modal Hand/Man Symbols with Countdown Timer, LED (680.815002) | EACH | 12 | $365.00 | $292.10 |
| 394 | (680.8151) | EACH | 12 | $1,840.00 | $1,560.55 |
| 395 | (680.8152) | EACH | 1 | $1,840.00 | $5,646.50 |
| 396 | Backplates for Traffic Signal Heads (680.8199) | EACH | 17 | $303.00 | $470.35 |
| 397 | (680.8204) | EACH | 9 | $1,240.00 | $1,238.55 |
| 398 | (680.8205) | EACH | 6 | $1,270.00 | $1,138.50 |
| 399 | (680.8207) | EACH | 1 | $1,300.00 | $2,336.80 |
| 400 | (680.8210) | EACH | 9 | $1,240.00 | $1,311.00 |
| 401 | Breakaway Transformer Base (680.8223) | EACH | 13 | $1,360.00 | $1,117.80 |
| 402 | (680.82250101) | 1 | $16.10 | $103.50 | |
| 403 | (680.82250801) | 15 | $681.00 | $517.50 | |
| 404 | (680.82540009) | 150 | $16.10 | $4.60 | |
| 405 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 2 | $898.00 | $770.50 |
| 406 | (680.950106) | LF | 499 | $6.00 | $5.75 |
| 407 | (680.950306) | LF | 50 | $18.30 | $10.35 |
| 408 | (680.95110009) | 2 | $4,330.00 | $8,964.25 | |
| 409 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $11.02 | $11.02 |
| 410 | (680.99470025) | 1 | $21,800 | $10,885 | |
| 411 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 30,867.50 | $1.20 | $1.15 |
| 412 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 17,806 | $1.20 | $1.15 |
| 413 | (685.15000025) | 1,670 | $3.55 | $3.45 | |
| 414 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 9,299 | $4.25 | $4.13 |
| 415 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 72 | $89.30 | $86.25 |
| 416 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 42 | $268.00 | $258.75 |
| 417 | (690.11001505) | LS | 1 | $25,800 | $14,659 |
| 418 | (690.11002505) | LS | 1 | $14,200 | $36,306 |
| 419 | (691.04000020) | 170,000 | $1.00 | $1.00 | |
| 420 | Field Change Payment (FCP) (697.03) | DOL | 3,242,000 | $1.00 | $1.00 |
| 421 | Asphalt Price Adjustment (698.04) | DOL | 8,752 | $1.00 | $1.00 |
| 422 | Fuel Price Adjustment (698.05) | DOL | 6,570 | $1.00 | $1.00 |
| 423 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 424 | Mobilization (699.040001) | LS | 1 | $1,788,785 | $1,900,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.