NYSDOT contract D265794 bid tabulation
Large Culvert Replacement. Let by New York State DOT on August 27, 2026, Broome, Chenango, Delaware, Sullivan, Region 09. 6 bids received; low bid $9,323,525 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 27 AUG 2026
- Pay items
- 144
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $9,323,525 | Low |
| 2 | Economy Paving Co Inc | $9,699,997 | +4.0% |
| 3 | BP Excavation LLC | $9,781,650 | +5.0% |
| 4 | Vector Construction Corp | $10,355,970 | +11% |
| 5 | Maple Ridge Civil LLC | $10,525,000 | +13% |
| 6 | Lancaster Development and Tully Construction Co LLC | $12,822,851 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. Economy Paving Co Inc | 3. BP Excavation LLC | 4. Vector Construction Corp | 5. Maple Ridge Civil LLC | 6. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 1.50 | $32,000 | $1,000.00 | $81,000 | $30,000 | $19,000 | $10,000 |
| 2 | (203.01990006) | 729 | $105.00 | $105.00 | $76.00 | $60.00 | $115.00 | $110.00 | |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 1,637 | $24.80 | $35.00 | $21.00 | $45.00 | $28.00 | $83.80 |
| 4 | Embankment In Place (203.03) | CY | 9,364 | $37.00 | $25.00 | $25.00 | $30.00 | $57.00 | $33.30 |
| 5 | Select Granular Fill (203.07) | CY | 1,609 | $77.65 | $75.00 | $64.00 | $65.00 | $58.00 | $116.00 |
| 6 | (203.24010017) | 156 | $42.00 | $30.00 | $85.00 | $90.00 | $130.00 | $160.00 | |
| 7 | (203.51990006) | 251 | $14.00 | $10.00 | $21.00 | $23.00 | $33.00 | $32.90 | |
| 8 | Structure Excavation (206.01) | CY | 12,242 | $37.50 | $25.00 | $28.00 | $35.00 | $30.00 | $46.30 |
| 9 | Trench and Culvert Excavation (206.0201) | CY | 327 | $14.00 | $10.00 | $42.00 | $45.00 | $38.00 | $108.00 |
| 10 | Geotextile Bedding (207.20) | SY | 1,504 | $4.00 | $3.20 | $5.50 | $6.00 | $5.50 | $6.50 |
| 11 | Geotextile Drainage (207.22) | SY | 100 | $10.00 | $10.00 | $18.00 | $12.00 | $4.50 | $6.35 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 776 | $17.00 | $7.75 | $21.00 | $19.00 | $15.00 | $46.40 |
| 13 | (208.01000809) | 84 | $110.00 | $100.00 | $150.00 | $100.00 | $71.00 | $213.00 | |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 3,598 | $4.50 | $1.50 | $4.00 | $1.00 | $0.85 | $2.20 |
| 15 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 7 | $1,000.00 | $500.00 | $700.00 | $225.00 | $1,150.00 | $1,840.00 |
| 16 | Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone – Permanent (209.110601) | EACH | 9 | $1,500.00 | $500.00 | $550.00 | $225.00 | $1,250.00 | $1,280.00 |
| 17 | Sediment Filter Log – Temporary, 12″, Type A (209.1311) | LF | 1,360 | $7.50 | $8.00 | $11.00 | $8.00 | $6.50 | $10.20 |
| 18 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 3,598 | $3.50 | $5.00 | $7.50 | $4.00 | $5.50 | $7.35 |
| 19 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 3,506 | $2.30 | $2.50 | $2.00 | $4.00 | $1.50 | $4.50 |
| 20 | Stabilized Construction Access (209.22) | SY | 1,071 | $21.40 | $10.00 | $36.00 | $30.00 | $8.00 | $88.00 |
| 21 | Subbase Course, Type 1 (304.11) | CY | 326 | $37.00 | $55.00 | $114.00 | $125.00 | $86.00 | $165.00 |
| 22 | Subbase Course, Optional Type (304.15) | CY | 967 | $77.00 | $95.00 | $79.00 | $110.00 | $78.00 | $158.00 |
| 23 | (404.0189) | TON | 1,052 | $189.00 | $195.00 | $175.00 | $190.00 | $140.00 | $232.00 |
| 24 | (404.0982) | TON | 994 | $191.00 | $195.00 | $185.00 | $190.00 | $150.00 | $232.00 |
| 25 | (404.2589) | TON | 878 | $199.00 | $195.00 | $175.00 | $185.00 | $150.00 | $195.00 |
| 26 | (404.4489) | TON | 1,545 | $158.00 | $155.00 | $175.00 | $190.00 | $140.00 | $172.00 |
| 27 | (407.01040009) | 826 | $8.25 | $3.00 | $17.00 | $15.00 | $9.00 | $38.70 | |
| 28 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 8,215 | $1.35 | $0.50 | $15.00 | $15.00 | $0.55 | $2.40 |
| 29 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 8,890 | $10.35 | $7.50 | $9.00 | $8.00 | $7.50 | $16.90 |
| 30 | Interim Steel Sheeting (552.15) | SF | 14,809 | $55.00 | $45.00 | $61.00 | $37.00 | $57.00 | $74.10 |
| 31 | (553.030001) | EACH | 1 | $38,500 | $2,000.00 | $32,000 | $5,000.00 | $115,000 | $41,400 |
| 32 | (553.030002) | EACH | 1 | $15,800 | $2,000.00 | $32,000 | $20,000 | $115,000 | $41,400 |
| 33 | (553.030003) | EACH | 1 | $15,800 | $2,000.00 | $32,000 | $20,000 | $115,000 | $41,400 |
| 34 | (553.030004) | EACH | 1 | $18,800 | $2,000.00 | $50,000 | $40,000 | $115,000 | $41,400 |
| 35 | (553.030005) | EACH | 1 | $18,800 | $2,000.00 | $80,000 | $30,000 | $115,000 | $41,400 |
| 36 | (553.030006) | EACH | 1 | $28,300 | $2,000.00 | $50,000 | $30,000 | $115,000 | $41,400 |
| 37 | (554.3001) | SF | 1,970 | $47.75 | $10.00 | $20.00 | $80.00 | $58.00 | $128.00 |
| 38 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 36 | $350.75 | $300.00 | $310.00 | $310.00 | $345.00 | $562.00 |
| 39 | Transition Bridge Railing (568.70) | LF | 116 | $319.70 | $300.00 | $282.00 | $300.00 | $275.00 | $388.00 |
| 40 | (595.50000018) | 4,717 | $3.00 | $8.00 | $5.00 | $5.00 | $4.50 | $26.10 | |
| 41 | (603.63060515) | 58 | $1,998.65 | $5,000.00 | $2,274.00 | $2,900.00 | $1,800.00 | $2,700.00 | |
| 42 | (603.63100715) | 79 | $2,591.65 | $7,000.00 | $3,242.00 | $3,300.00 | $2,350.00 | $3,150.00 | |
| 43 | (603.63120715) | 57 | $2,954.35 | $6,000.00 | $3,580.00 | $4,000.00 | $2,600.00 | $3,770.00 | |
| 44 | (603.63140515) | 35 | $5,256.45 | $10,000 | $5,980.00 | $4,000.00 | $5,100.00 | $5,570.00 | |
| 45 | (603.63140815) | 88 | $3,302.75 | $6,500.00 | $4,096.00 | $4,300.00 | $3,100.00 | $4,180.00 | |
| 46 | (603.64140815) | 97 | $3,259.35 | $7,500.00 | $3,961.00 | $4,200.00 | $2,850.00 | $4,320.00 | |
| 47 | (603.67000001) | 505 | $1,733.85 | $850.00 | $1,651.00 | $1,100.00 | $1,400.00 | $2,170.00 | |
| 48 | (605.1602) | LF | 392 | $1.75 | $15.00 | $25.00 | $9.00 | $24.00 | $17.60 |
| 49 | Box Beam Guide Railing (606.10) | LF | 3,465 | $65.55 | $55.00 | $60.00 | $60.00 | $47.00 | $79.60 |
| 50 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 110 | $76.50 | $65.00 | $68.00 | $70.00 | $66.00 | $92.90 |
| 51 | (606.10010004) | 18 | $115.00 | $100.00 | $125.00 | $110.00 | $93.00 | $140.00 | |
| 52 | Box Beam End Piece (606.120101) | EACH | 1 | $948.75 | $900.00 | $900.00 | $1,000.00 | $760.00 | $1,150.00 |
| 53 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 3 | $6,325.00 | $6,000.00 | $5,800.00 | $6,500.00 | $4,400.00 | $7,680.00 |
| 54 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 15 | $2,875.00 | $3,000.00 | $2,600.00 | $3,000.00 | $2,150.00 | $3,490.00 |
| 55 | Box Beam End Assembly Type III (606.1203) | EACH | 2 | $9,200.00 | $8,000.00 | $8,500.00 | $9,000.00 | $6,150.00 | $11,200 |
| 56 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 1,399 | $7.70 | $5.00 | $6.00 | $8.00 | $4.50 | $7.00 |
| 57 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 10 | $900.00 | $100.00 | $175.00 | $130.00 | $36.00 | $209.00 |
| 58 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,138 | $7.75 | $5.00 | $4.00 | $8.00 | $5.00 | $4.55 |
| 59 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 515 | $4.00 | $5.00 | $6.00 | $8.00 | $8.00 | $7.00 |
| 60 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $900.00 | $100.00 | $850.00 | $130.00 | $650.00 | $1,080.00 |
| 61 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 8 | $900.00 | $100.00 | $200.00 | $130.00 | $170.00 | $209.00 |
| 62 | Right-of Way Fencing (607.19) | LF | 281 | $62.10 | $55.00 | $40.00 | $60.00 | $120.00 | $75.40 |
| 63 | (607.41010010) | 41 | $23.00 | $10.00 | $20.00 | $11.00 | $27.00 | $25.90 | |
| 64 | (607.99980007) | 281 | $23.00 | $5.00 | $25.00 | $5.00 | $52.00 | $27.90 | |
| 65 | Concrete Sidewalks and Driveways (608.0101) | CY | 3 | $2,200.00 | $2,000.00 | $4,000.00 | $1,600.00 | $2,500.00 | $1,500.00 |
| 66 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 142 | $205.00 | $300.00 | $500.00 | $550.00 | $225.00 | $370.00 |
| 67 | (610.10020309) | 92 | $105.00 | $65.00 | $90.00 | $80.00 | $175.00 | $323.00 | |
| 68 | Weed Removal (610.13) | SY | 9,154 | $0.65 | $0.50 | $2.00 | $0.50 | $3.00 | $0.73 |
| 69 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 1,105 | $63.00 | $5.00 | $32.00 | $70.00 | $43.00 | $178.00 |
| 70 | Topsoil – On-Site Wetland Materials (610.1406) | CY | 36 | $73.00 | $100.00 | $130.00 | $70.00 | $130.00 | $204.00 |
| 71 | (610.15120208) | 1,072 | $4.25 | $1.00 | $4.00 | $3.50 | $3.00 | $5.45 | |
| 72 | Turf Establishment - Roadside (610.1601) | SY | 8,197 | $1.75 | $1.50 | $3.00 | $1.60 | $1.50 | $3.75 |
| 73 | Turf Establishment -Lawns (610.1602) | SY | 1,511 | $1.75 | $1.50 | $8.00 | $1.60 | $2.00 | $5.05 |
| 74 | Watering Vegetation (610.19) | 1,000 GALLONS | 1,379 | $2.30 | $2.50 | $23.00 | $2.00 | $19.00 | $2.90 |
| 75 | Mowing (610.21) | SY | 9,154 | $0.60 | $0.50 | $0.75 | $0.50 | $1.00 | $0.73 |
| 76 | (611.0151) | EACH | 12 | $920.00 | $950.00 | $850.00 | $800.00 | $720.00 | $1,170.00 |
| 77 | (611.0292) | EACH | 35 | $805.00 | $750.00 | $800.00 | $700.00 | $530.00 | $1,020.00 |
| 78 | (611.0351) | EACH | 9 | $575.00 | $550.00 | $860.00 | $500.00 | $535.00 | $730.00 |
| 79 | (611.0451) | EACH | 141 | $138.00 | $125.00 | $100.00 | $120.00 | $74.00 | $175.00 |
| 80 | (611.19010024) | 12 | $23.00 | $25.00 | $250.00 | $20.00 | $100.00 | $29.20 | |
| 81 | (611.19020024) | 35 | $23.00 | $25.00 | $250.00 | $20.00 | $75.00 | $29.20 | |
| 82 | (611.19030024) | 9 | $23.00 | $25.00 | $275.00 | $20.00 | $110.00 | $29.20 | |
| 83 | (611.19040024) | 141 | $5.75 | $5.00 | $35.00 | $5.00 | $27.00 | $7.30 | |
| 84 | (613.04000001) | 636 | $108.00 | $20.00 | $45.00 | $46.00 | $105.00 | $150.00 | |
| 85 | (614.060204) | EACH | 5 | $900.00 | $50.00 | $225.00 | $400.00 | $650.00 | $1,260.00 |
| 86 | (614.060304) | EACH | 2 | $2,500.00 | $100.00 | $275.00 | $600.00 | $850.00 | $1,820.00 |
| 87 | (614.060404) | EACH | 3 | $2,500.00 | $150.00 | $400.00 | $1,200.00 | $1,500.00 | $2,230.00 |
| 88 | (614.060504) | EACH | 1 | $9,500.00 | $250.00 | $600.00 | $1,600.00 | $2,500.00 | $3,630.00 |
| 89 | (616.08000024) | 30 | $23.00 | $25.00 | $100.00 | $20.00 | $13.00 | $29.20 | |
| 90 | (617.10000024) | 118 | $75.00 | $10.00 | $58.00 | $65.00 | $59.00 | $201.00 | |
| 91 | (617.11000024) | LS | 1 | $3,500.00 | $1,000.00 | $5,000.00 | $2,000.00 | $865.00 | $3,740.00 |
| 92 | (617.11100009) | LS | 1 | $3,500.00 | $1,000.00 | $10,000 | $1,500.00 | $865.00 | $3,600.00 |
| 93 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $530,000 | $990,000 | $188,550 | $1,580,000 | $1,085,000 | $510,000 |
| 94 | Type III Construction Barricades (619.04) | EACH | 84 | $115.00 | $10.00 | $100.00 | $160.00 | $170.00 | $138.00 |
| 95 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 8,599 | $7.50 | $6.50 | $7.00 | $6.50 | $6.50 | $9.10 |
| 96 | (619.100104) | LF | 22,000 | $6.35 | $5.50 | $6.00 | $5.50 | $5.50 | $7.70 |
| 97 | (619.111113) | EACH | 14 | $5,135.00 | $1,500.00 | $3,500.00 | $8,000.00 | $6,200.00 | $10,300 |
| 98 | (619.130101) | EACH | 1 | $81,650 | $75,000 | $155,000 | $130,000 | $80,000 | $80,300 |
| 99 | (619.130102) | EACH | 1 | $139,150 | $125,000 | $215,000 | $180,000 | $80,000 | $155,000 |
| 100 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 1,840 | $40.75 | $60.00 | $90.00 | $35.00 | $58.00 | $77.20 |
| 101 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 3,560 | $62.50 | $60.00 | $90.00 | $40.00 | $70.00 | $87.50 |
| 102 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 131 | $60.00 | $10.00 | $50.00 | $22.00 | $30.00 | $117.00 |
| 103 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 33 | $2,200.00 | $3,000.00 | $7,800.00 | $9,000.00 | $4,750.00 | $16,800 |
| 104 | Temporary Rumble Strips (619.22) | LF | 1,150 | $24.15 | $5.00 | $22.00 | $21.00 | $21.00 | $21.40 |
| 105 | Mailboxes (619.27) | EACH | 11 | $300.00 | $600.00 | $225.00 | $280.00 | $345.00 | $597.00 |
| 106 | Stone Filling (Heavy) (620.05) | CY | 456 | $196.00 | $135.00 | $150.00 | $150.00 | $155.00 | $228.00 |
| 107 | Bedding Material, Type 1 (620.0801) | CY | 104 | $144.75 | $115.00 | $90.00 | $100.00 | $115.00 | $217.00 |
| 108 | Bedding Material, Type 2 (620.0802) | CY | 104 | $143.00 | $115.00 | $90.00 | $100.00 | $110.00 | $217.00 |
| 109 | (620.14020009) | 553 | $245.75 | $155.00 | $180.00 | $175.00 | $210.00 | $209.00 | |
| 110 | (621.05020004) | 6,311 | $5.10 | $1.00 | $8.00 | $5.00 | $5.50 | $9.45 | |
| 111 | Crushed Stone (In-Place Measure) (623.12) | CY | 294 | $137.20 | $95.00 | $122.00 | $150.00 | $160.00 | $224.00 |
| 112 | (623.12110001) | 18 | $139.00 | $125.00 | $235.00 | $150.00 | $250.00 | $159.00 | |
| 113 | (623.12120001) | 28 | $139.00 | $125.00 | $235.00 | $150.00 | $235.00 | $161.00 | |
| 114 | Survey Operations (625.01) | LS | 1 | $275,000 | $100,000 | $145,335 | $200,000 | $690,000 | $339,989 |
| 115 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 4 | $1,690.00 | $5,000.00 | $6,800.00 | $1,100.00 | $1,000.00 | $1,240.00 |
| 116 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 2 | $941.00 | $3,000.00 | $3,100.00 | $400.00 | $400.00 | $819.00 |
| 117 | Permanent Survey Markers (625.06) | EACH | 10 | $4,670.00 | $4,000.00 | $5,000.00 | $900.00 | $2,000.00 | $3,320.00 |
| 118 | (627.50140008) | 1,598 | $8.15 | $1.00 | $5.00 | $5.20 | $2.00 | $15.30 | |
| 119 | (634.99010017) | LS | 1 | $12,600 | $5,000.00 | $20,000 | $4,000.00 | $10,000 | $26,100 |
| 120 | (634.99020017) | LS | 1 | $3,300.00 | $2,500.00 | $10,000 | $1,100.00 | $5,000.00 | $9,250.00 |
| 121 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,800.00 | $6,000.00 | $1,500.00 | $5,000.00 | $5,550.00 | $7,840.00 |
| 122 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 26 | $2,500.00 | $3,000.00 | $2,400.00 | $2,500.00 | $3,000.00 | $8,140.00 |
| 123 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Construction Testing supplies – Consumables (637.36) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | (637.41000115) | 26 | $145.00 | $100.00 | $150.00 | $70.00 | $300.00 | $166.00 | |
| 126 | (637.41000215) | 26 | $145.00 | $100.00 | $150.00 | $70.00 | $300.00 | $166.00 | |
| 127 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 3,587 | $0.70 | $0.65 | $1.50 | $1.40 | $0.60 | $0.82 |
| 128 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,757 | $0.70 | $0.65 | $2.00 | $1.40 | $0.60 | $0.82 |
| 129 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 83 | $48.30 | $45.00 | $45.00 | $45.00 | $30.00 | $58.70 |
| 130 | Type A Sign Posts (645.81) | EACH | 10 | $276.00 | $245.00 | $250.00 | $250.00 | $79.00 | $335.00 |
| 131 | Reference Marker Panel (646.21) | EACH | 7 | $51.75 | $45.00 | $50.00 | $45.00 | $28.00 | $62.80 |
| 132 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 30 | $33.35 | $35.00 | $35.00 | $30.00 | $13.00 | $40.50 |
| 133 | Steel Post, 2.0 lb/ft (646.32) | EACH | 33 | $96.60 | $95.00 | $90.00 | $85.00 | $50.00 | $117.00 |
| 134 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 9 | $57.50 | $50.00 | $55.00 | $40.00 | $10.00 | $69.80 |
| 135 | (647.83001002) | 28 | $11.50 | $10.00 | $15.00 | $12.00 | $10.00 | $14.00 | |
| 136 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 1,515 | $2.50 | $8.50 | $2.00 | $6.00 | $2.00 | $9.80 |
| 137 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 4,474 | $2.05 | $3.75 | $8.00 | $7.00 | $2.00 | $2.50 |
| 138 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 379 | $2.05 | $3.75 | $9.00 | $7.00 | $1.00 | $2.50 |
| 139 | (691.04000020) | 110,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 140 | Field Change Payment (FCP) (697.03) | DOL | 450,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 141 | Asphalt Price Adjustment (698.04) | DOL | 1,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 142 | Fuel Price Adjustment (698.05) | DOL | 1,700 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 143 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 144 | Mobilization (699.040001) | LS | 1 | $300,115 | $370,554 | $375,000 | $396,000 | $401,287 | $492,001 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way