BP Excavation LLC submitted 10 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 27 AUG 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
New York State DOT
Low bid volume
$9,354,353
Latest bid
27 AUG 2026
Data through
15 OCT 2026
10Bids
2Low bids
20Win rate, percent
+7.0%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
202211100%
2023100%
2024300%
20253133%
2026200%
BP Excavation LLC, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 027114%
Region 09200%
Region 0111100%
BP Excavation LLC, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1010 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1010 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1010 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1010 (100%)$1.00$1.00
Unclassified Excavation and Disposal203.02CY1010 (100%)$18.20$71.00
Office Technology and Supplies637.34DOL99 (100%)$1.00$1.00
Structure Excavation206.01CY108 (80%)$16.00$38.00
Type III Construction Barricades619.04EACH97 (78%)$50.00$115.00
Bedding Material, Type 1620.0801CY106 (60%)$91.50$120.00
404.0001TON66 (100%)$85.00$95.00
595.50000018105 (50%)$3.49$5.50
Box Beam Guide Railing End Assembly Type IIA606.120201EACH95 (56%)$2,200.00$2,345.00
BP Excavation LLC, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Slate Hill Constructors Inc85 of 8
Bothar Construction LLC82 of 8
Vector Construction Corp62 of 6
Maple Ridge Organics LLC33 of 3
Cci Companies Inc20 of 2
Peter Luizzi & Bros Contracting Inc21 of 2
Economy Paving Co Inc21 of 2
Rifenburg Contracting Corporation10 of 1
Kubricky Construction Corp10 of 1
James H Maloy Inc10 of 1
BP Excavation LLC, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
27 AUG 2026D265794Region 09Large Culvert Replacement.3 of 6$9,781,650+5.0%
05 MAR 2026D265635Region 02CULVERT REPAIR/REPLACEMENT PROJECT 253 of 6$3,723,428+7.0%
18 DEC 2025D265595Region 09LARGE CULVERT AND BRIDGE REPLACEMENT - NY Route 12 (SH 505)2 of 3$5,198,819+7.0%
11 SEP 2025D265554Region 02REPLACEMENT OF ROUTE 51 CULVERT OVER STEELE CREEK3 of 5$2,728,853+4.0%
27 MAR 2025D265397Region 02LARGE CULVERT REPLACEMENTS MULTI SITE - CONTRACT 11 of 3$5,745,408Low, 5.0% under the second
21 NOV 2024D265355Region 02CULVERT REPAIR AND REPLACEMENT PROJECT 24 ONEIDA COUNTY2 of 5$2,535,898+10%
24 OCT 2024D265330Region 02LARGE CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS4 of 5$3,749,494+6.0%
24 OCT 2024D265331Region 02LARGE CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS3 of 6$4,208,668+8.0%
30 NOV 2023D265131Region 02CULVERT REPAIR/REPLACEMENT PROJECT HERKIMER COUNTY5 of 9$1,090,125+11%
20 JAN 2022D264644Region 01NYSDOT Region-1, Culvert Replacement Various Locations.1 of 5$3,608,945Low, 6.0% under the second
BP Excavation LLC: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy