BP Excavation LLC: NYSDOT bid record
BP Excavation LLC submitted 10 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 27 AUG 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $9,354,353
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 3 | 1 | 33% |
| 2026 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 02 | 7 | 1 | 14% |
| Region 09 | 2 | 0 | 0% |
| Region 01 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 10 | 10 (100%) | $18.20 | $71.00 |
| Office Technology and Supplies | 637.34 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Structure Excavation | 206.01 | CY | 10 | 8 (80%) | $16.00 | $38.00 |
| Type III Construction Barricades | 619.04 | EACH | 9 | 7 (78%) | $50.00 | $115.00 |
| Bedding Material, Type 1 | 620.0801 | CY | 10 | 6 (60%) | $91.50 | $120.00 |
| 404.0001 | TON | 6 | 6 (100%) | $85.00 | $95.00 | |
| 595.50000018 | 10 | 5 (50%) | $3.49 | $5.50 | ||
| Box Beam Guide Railing End Assembly Type IIA | 606.120201 | EACH | 9 | 5 (56%) | $2,200.00 | $2,345.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Slate Hill Constructors Inc | 8 | 5 of 8 |
| Bothar Construction LLC | 8 | 2 of 8 |
| Vector Construction Corp | 6 | 2 of 6 |
| Maple Ridge Organics LLC | 3 | 3 of 3 |
| Cci Companies Inc | 2 | 0 of 2 |
| Peter Luizzi & Bros Contracting Inc | 2 | 1 of 2 |
| Economy Paving Co Inc | 2 | 1 of 2 |
| Rifenburg Contracting Corporation | 1 | 0 of 1 |
| Kubricky Construction Corp | 1 | 0 of 1 |
| James H Maloy Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265794 | Region 09 | Large Culvert Replacement. | 3 of 6 | $9,781,650 | +5.0% |
| 05 MAR 2026 | D265635 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT 25 | 3 of 6 | $3,723,428 | +7.0% |
| 18 DEC 2025 | D265595 | Region 09 | LARGE CULVERT AND BRIDGE REPLACEMENT - NY Route 12 (SH 505) | 2 of 3 | $5,198,819 | +7.0% |
| 11 SEP 2025 | D265554 | Region 02 | REPLACEMENT OF ROUTE 51 CULVERT OVER STEELE CREEK | 3 of 5 | $2,728,853 | +4.0% |
| 27 MAR 2025 | D265397 | Region 02 | LARGE CULVERT REPLACEMENTS MULTI SITE - CONTRACT 1 | 1 of 3 | $5,745,408 | Low, 5.0% under the second |
| 21 NOV 2024 | D265355 | Region 02 | CULVERT REPAIR AND REPLACEMENT PROJECT 24 ONEIDA COUNTY | 2 of 5 | $2,535,898 | +10% |
| 24 OCT 2024 | D265330 | Region 02 | LARGE CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS | 4 of 5 | $3,749,494 | +6.0% |
| 24 OCT 2024 | D265331 | Region 02 | LARGE CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS | 3 of 6 | $4,208,668 | +8.0% |
| 30 NOV 2023 | D265131 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT HERKIMER COUNTY | 5 of 9 | $1,090,125 | +11% |
| 20 JAN 2022 | D264644 | Region 01 | NYSDOT Region-1, Culvert Replacement Various Locations. | 1 of 5 | $3,608,945 | Low, 6.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.