NYSDOT contract D265635 bid tabulation
CULVERT REPAIR/REPLACEMENT PROJECT 25. Let by New York State DOT on March 5, 2026, Herkimer, Madison, Oneida, Region 02. 6 bids received; low bid $3,470,000 by Maple Ridge Organics LLC.
- Owner
- New York State DOT
- Letting
- 05 MAR 2026
- Pay items
- 102
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Maple Ridge Organics LLC | $3,470,000 | Low |
| 2 | Mohawk Valley Materials Inc | $3,632,203 | +5.0% |
| 3 | BP Excavation LLC | $3,723,428 | +7.0% |
| 4 | Vector Construction Corp | $3,757,636 | +8.0% |
| 5 | Slate Hill Constructors Inc | $3,827,040 | +10% |
| 6 | Birdsall Excavation and Construction LLC | $3,872,718 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Maple Ridge Organics LLC | 2. Mohawk Valley Materials Inc | 3. BP Excavation LLC | 4. Vector Construction Corp | 5. Slate Hill Constructors Inc | 6. Birdsall Excavation and Construction LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $22,601 | $42,000 | $40,000 | $40,000 | $50,000 |
| 2 | (203.01990006) | 25 | $120.00 | $132.17 | $64.00 | $111.00 | $170.00 | $80.00 | |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 3,301 | $30.00 | $44.19 | $23.00 | $30.00 | $45.00 | $45.00 |
| 4 | Embankment In Place (203.03) | CY | 2,718 | $55.00 | $43.11 | $55.00 | $26.50 | $50.00 | $55.00 |
| 5 | Select Granular Fill (203.07) | CY | 47 | $85.00 | $73.74 | $67.00 | $85.00 | $90.00 | $50.00 |
| 6 | Select Structural Fill (203.21) | CY | 564 | $80.00 | $87.60 | $63.00 | $85.00 | $115.00 | $90.00 |
| 7 | (203.24010017) | 6 | $175.00 | $47.79 | $115.00 | $130.00 | $250.00 | $80.00 | |
| 8 | Sand Backfill (203.25) | CY | 51 | $130.00 | $97.79 | $64.00 | $100.00 | $105.00 | $40.00 |
| 9 | (203.51990006) | 50 | $30.00 | $14.42 | $21.00 | $22.50 | $23.00 | $25.00 | |
| 10 | Structure Excavation (206.01) | CY | 3,378 | $45.00 | $18.30 | $22.00 | $40.00 | $45.00 | $35.00 |
| 11 | Trench and Culvert Excavation (206.0201) | CY | 308 | $45.00 | $20.87 | $35.00 | $29.00 | $60.00 | $50.00 |
| 12 | (206.04000001) | 1 | $545.00 | $3,923.60 | $1,000.00 | $1,000.00 | $1,000.00 | $650.00 | |
| 13 | Geotextile Bedding (207.20) | SY | 536 | $5.50 | $8.96 | $9.00 | $11.25 | $10.00 | $3.50 |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 4,873 | $1.00 | $2.04 | $2.00 | $4.00 | $2.00 | $7.00 |
| 15 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 3,096 | $4.00 | $10.03 | $6.00 | $4.50 | $6.00 | $9.00 |
| 16 | (209.23010009) | 1,695 | $6.50 | $8.71 | $15.00 | $7.50 | $10.00 | $18.00 | |
| 17 | Subbase Course, Type 2 (304.12) | CY | 1,656 | $80.00 | $81.14 | $86.00 | $85.00 | $100.00 | $75.00 |
| 18 | (404.0189) | TON | 33 | $145.00 | $140.73 | $190.00 | $195.00 | $200.00 | $290.00 |
| 19 | (404.0982) | TON | 618 | $140.00 | $136.18 | $165.00 | $170.00 | $175.00 | $225.00 |
| 20 | (404.2589) | TON | 1,229 | $120.00 | $118.45 | $145.00 | $150.00 | $155.00 | $200.00 |
| 21 | Straight Tack Coat (407.0103) | GAL | 555 | $7.50 | $7.04 | $11.30 | $11.50 | $12.00 | $30.00 |
| 22 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,028 | $1.00 | $1.29 | $1.54 | $2.00 | $2.00 | $5.50 |
| 23 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,307 | $6.50 | $6.53 | $8.00 | $9.00 | $10.00 | $25.00 |
| 24 | Interim Steel Sheeting (552.15) | SF | 3,125 | $100.00 | $95.69 | $86.00 | $65.00 | $65.00 | $75.00 |
| 25 | Shields and Shoring (552.17) | SF | 552 | $2.50 | $21.25 | $8.00 | $1.00 | $1.00 | $40.00 |
| 26 | (552.230101) | SF | 281 | $15.00 | $97.77 | $9.00 | $45.00 | $32.00 | $95.00 |
| 27 | (553.020001) | EACH | 1 | $20,000 | $23,315 | $35,000 | $55,000 | $1.00 | $25,000 |
| 28 | (553.020002) | EACH | 1 | $20,000 | $25,568 | $30,000 | $20,000 | $1.00 | $25,000 |
| 29 | (553.020003) | EACH | 1 | $20,000 | $18,336 | $20,000 | $50,000 | $1.00 | $25,000 |
| 30 | (553.020004) | EACH | 1 | $20,000 | $22,888 | $20,000 | $20,000 | $1.00 | $25,000 |
| 31 | (553.020005) | EACH | 1 | $20,000 | $25,866 | $35,000 | $50,000 | $1.00 | $25,000 |
| 32 | (553.020006) | EACH | 1 | $20,000 | $27,517 | $35,000 | $20,000 | $1.00 | $25,000 |
| 33 | Protective Sealing of New Structural Concrete (559.02) | SF | 604 | $2.00 | $13.24 | $1.00 | $0.75 | $8.00 | $2.00 |
| 34 | (595.50000018) | 4,397 | $5.50 | $4.47 | $3.00 | $4.00 | $5.50 | $7.00 | |
| 35 | (603.63080515) | 79 | $3,500.00 | $3,225.69 | $4,685.00 | $3,700.00 | $3,700.00 | $3,590.00 | |
| 36 | (603.64100715) | 68 | $3,700.00 | $3,648.71 | $4,600.00 | $4,600.00 | $3,800.00 | $3,975.00 | |
| 37 | (603.64160815) | 80 | $4,800.00 | $4,604.39 | $5,890.00 | $5,100.00 | $4,100.00 | $4,900.00 | |
| 38 | Box Beam Guide Railing (606.10) | LF | 1,773 | $65.00 | $62.15 | $54.00 | $55.00 | $58.00 | $66.00 |
| 39 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $5,200.00 | $5,042.89 | $4,600.00 | $5,000.00 | $5,000.00 | $4,730.00 |
| 40 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 5 | $2,800.00 | $2,697.36 | $2,200.00 | $2,200.00 | $2,500.00 | $2,530.00 |
| 41 | Box Beam End Assembly Type III (606.1203) | EACH | 3 | $7,300.00 | $7,036.60 | $7,000.00 | $7,000.00 | $6,500.00 | $6,600.00 |
| 42 | Removing and Disposing Cable Guide Railing (606.70) | LF | 449 | $7.50 | $19.09 | $5.00 | $5.00 | $13.00 | $3.00 |
| 43 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,250 | $6.00 | $19.19 | $6.00 | $5.50 | $9.00 | $5.00 |
| 44 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 2 | $480.00 | $606.13 | $1,500.00 | $425.00 | $850.00 | $280.00 |
| 45 | (607.95000008) | 1,170 | $5.00 | $14.97 | $9.00 | $5.00 | $15.00 | $15.00 | |
| 46 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 34 | $220.00 | $263.87 | $303.00 | $305.00 | $320.00 | $280.00 |
| 47 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 3 | $110.00 | $175.92 | $195.00 | $170.00 | $210.00 | $290.00 |
| 48 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 280 | $45.00 | $16.19 | $130.00 | $45.00 | $75.00 | $45.00 |
| 49 | Topsoil - Roadside (610.1402) | CY | 187 | $90.00 | $100.04 | $85.00 | $93.00 | $120.00 | $120.00 |
| 50 | Turf Establishment - Roadside (610.1601) | SY | 3,912 | $1.50 | $4.97 | $2.50 | $2.00 | $2.50 | $15.00 |
| 51 | Watering Vegetation (610.19) | 1,000 GALLONS | 1 | $20.00 | $1,172.77 | $1,000.00 | $1,000.00 | $105.00 | $500.00 |
| 52 | (611.0201) | EACH | 3 | $590.00 | $879.58 | $675.00 | $625.00 | $700.00 | $850.00 |
| 53 | (611.0422) | EACH | 15 | $85.00 | $117.27 | $109.00 | $125.00 | $115.00 | $185.00 |
| 54 | (611.19020024) | 3 | $225.00 | $117.27 | $210.00 | $175.00 | $230.00 | $275.00 | |
| 55 | (611.19040024) | 7 | $35.00 | $76.23 | $64.00 | $30.00 | $75.00 | $60.00 | |
| 56 | Rodent Guard (611.21) | EACH | 3 | $30.00 | $117.27 | $20.00 | $35.00 | $22.00 | $30.00 |
| 57 | (613.04000001) | 24 | $115.00 | $111.25 | $40.00 | $77.00 | $250.00 | $55.00 | |
| 58 | (616.15000024) | 600 | $20.00 | $17.59 | $30.00 | $65.00 | $28.00 | $65.00 | |
| 59 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $135,000 | $178,610 | $70,000 | $140,000 | $450,000 | $75,000 |
| 60 | Type III Construction Barricades (619.04) | EACH | 41 | $145.00 | $272.58 | $45.00 | $110.00 | $50.00 | $200.00 |
| 61 | (619.06010009) | 1 | $73,000 | $65,394 | $65,000 | $45,000 | $18,000 | $18,000 | |
| 62 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 1,745 | $8.50 | $8.21 | $7.00 | $7.00 | $8.00 | $1.75 |
| 63 | (619.100104) | LF | 3,100 | $6.50 | $6.45 | $5.50 | $5.50 | $6.00 | $5.00 |
| 64 | (619.110513) | EACH | 2 | $7,000.00 | $9,757.29 | $10,000 | $6,500.00 | $4,500.00 | $28,000 |
| 65 | (619.110613) | WEEK | 8 | $1,200.00 | $439.78 | $6,000.00 | $900.00 | $2,800.00 | $2,000.00 |
| 66 | (619.130201) | EACH | 2 | $20,000 | $30,785 | $15,000 | $95,000 | $35,000 | $32,000 |
| 67 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 760 | $60.00 | $111.14 | $80.00 | $30.00 | $75.00 | $55.00 |
| 68 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 37 | $45.00 | $125.92 | $35.00 | $45.00 | $40.00 | $38.00 |
| 69 | Temporary Rumble Strips (619.22) | LF | 414 | $20.00 | $19.35 | $16.50 | $17.00 | $18.00 | $19.00 |
| 70 | Mailboxes (619.27) | EACH | 1 | $320.00 | $457.37 | $200.00 | $350.00 | $100.00 | $500.00 |
| 71 | (619.60750011) | 540 | $6.50 | $35.60 | $60.00 | $21.00 | $22.00 | $15.00 | |
| 72 | Stone Filling (Fine) (620.02) | CY | 21 | $155.00 | $522.25 | $145.00 | $210.00 | $260.00 | $220.00 |
| 73 | Stone Filling (Medium) (620.04) | CY | 217 | $135.00 | $156.31 | $136.00 | $110.00 | $125.00 | $112.00 |
| 74 | Stone Filling (Heavy) (620.05) | CY | 273 | $175.00 | $168.62 | $163.00 | $155.00 | $145.00 | $165.00 |
| 75 | Dry Rip-Rap (620.06) | CY | 16 | $230.00 | $289.55 | $365.00 | $265.00 | $350.00 | $150.00 |
| 76 | Bedding Material, Type 1 (620.0801) | CY | 60 | $115.00 | $100.12 | $94.00 | $110.00 | $150.00 | $125.00 |
| 77 | (620.29110009) | 147 | $120.00 | $196.04 | $76.00 | $115.00 | $140.00 | $185.00 | |
| 78 | Crushed Stone (In-Place Measure) (623.12) | CY | 100 | $130.00 | $97.25 | $94.00 | $200.00 | $160.00 | $125.00 |
| 79 | Survey Operations (625.01) | LS | 1 | $52,000 | $41,926 | $84,000 | $90,000 | $40,000 | $60,000 |
| 80 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 17 | $1,200.00 | $1,391.37 | $2,200.00 | $620.00 | $1,200.00 | $260.00 |
| 81 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 2 | $1,200.00 | $1,391.37 | $3,000.00 | $620.00 | $1,100.00 | $210.00 |
| 82 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 5 | $485.00 | $690.46 | $550.00 | $81.00 | $650.00 | $95.00 |
| 83 | (627.50140008) | 1,416 | $3.00 | $6.40 | $4.00 | $5.00 | $4.00 | $12.00 | |
| 84 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $3,100.00 | $3,826.15 | $1,000.00 | $2,100.00 | $1,000.00 | $2,500.00 |
| 85 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 8 | $3,600.00 | $6,343.93 | $2,000.00 | $3,100.00 | $5,000.00 | $2,200.00 |
| 86 | Office Technology and Supplies (637.34) | DOL | 3,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 87 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 26 | $25.00 | $58.45 | $22.00 | $25.00 | $21.00 | $25.00 |
| 88 | Steel Post, 2.0 lb/ft (646.32) | EACH | 18 | $85.00 | $107.59 | $94.00 | $100.00 | $75.00 | $80.00 |
| 89 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 7 | $45.00 | $40.00 | $200.00 | $100.00 | $10.00 | $145.00 |
| 90 | (663.0110) | LF | 73 | $215.00 | $96.05 | $121.00 | $275.00 | $300.00 | $265.00 |
| 91 | (663.1010) | EACH | 2 | $4,600.00 | $4,427.03 | $4,500.00 | $8,250.00 | $8,400.00 | $4,200.00 |
| 92 | (663.1810) | EACH | 2 | $1,000.00 | $992.92 | $1,050.00 | $2,100.00 | $2,100.00 | $950.00 |
| 93 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 380 | $15.00 | $6.92 | $6.00 | $8.25 | $9.00 | $7.50 |
| 94 | (663.2110) | EACH | 8 | $245.00 | $455.79 | $200.00 | $200.00 | $210.00 | $260.00 |
| 95 | (663.4110) | LF | 80 | $45.00 | $37.91 | $15.00 | $210.00 | $210.00 | $35.00 |
| 96 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 5,068 | $3.00 | $2.93 | $2.50 | $2.50 | $3.00 | $5.00 |
| 97 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 5,068 | $3.00 | $2.93 | $2.50 | $2.50 | $3.00 | $5.00 |
| 98 | Field Change Payment (FCP) (697.03) | DOL | 119,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 99 | Asphalt Price Adjustment (698.04) | DOL | 631.59 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 100 | Fuel Price Adjustment (698.05) | DOL | 303 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 101 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 102 | Mobilization (699.040001) | LS | 1 | $118,031 | $131,258 | $110,000 | $144,000 | $140,000 | $75,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.