NYSDOT contract D265635 bid tabulation

CULVERT REPAIR/REPLACEMENT PROJECT 25. Let by New York State DOT on March 5, 2026, Herkimer, Madison, Oneida, Region 02. 6 bids received; low bid $3,470,000 by Maple Ridge Organics LLC.

Owner
New York State DOT
Letting
05 MAR 2026
Pay items
102
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Maple Ridge Organics LLC$3,470,000Low
2Mohawk Valley Materials Inc$3,632,203+5.0%
3BP Excavation LLC$3,723,428+7.0%
4Vector Construction Corp$3,757,636+8.0%
5Slate Hill Constructors Inc$3,827,040+10%
6Birdsall Excavation and Construction LLC$3,872,718+12%
NYSDOT contract D265635: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Maple Ridge Organics LLC2. Mohawk Valley Materials Inc3. BP Excavation LLC4. Vector Construction Corp5. Slate Hill Constructors Inc6. Birdsall Excavation and Construction LLC
1Clearing and Grubbing (201.06)LS1$15,000$22,601$42,000$40,000$40,000$50,000
2 (203.01990006)25$120.00$132.17$64.00$111.00$170.00$80.00
3Unclassified Excavation and Disposal (203.02)CY3,301$30.00$44.19$23.00$30.00$45.00$45.00
4Embankment In Place (203.03)CY2,718$55.00$43.11$55.00$26.50$50.00$55.00
5Select Granular Fill (203.07)CY47$85.00$73.74$67.00$85.00$90.00$50.00
6Select Structural Fill (203.21)CY564$80.00$87.60$63.00$85.00$115.00$90.00
7 (203.24010017)6$175.00$47.79$115.00$130.00$250.00$80.00
8Sand Backfill (203.25)CY51$130.00$97.79$64.00$100.00$105.00$40.00
9 (203.51990006)50$30.00$14.42$21.00$22.50$23.00$25.00
10Structure Excavation (206.01)CY3,378$45.00$18.30$22.00$40.00$45.00$35.00
11Trench and Culvert Excavation (206.0201)CY308$45.00$20.87$35.00$29.00$60.00$50.00
12 (206.04000001)1$545.00$3,923.60$1,000.00$1,000.00$1,000.00$650.00
13Geotextile Bedding (207.20)SY536$5.50$8.96$9.00$11.25$10.00$3.50
14Seed and Mulch – Temporary (209.1003)SY4,873$1.00$2.04$2.00$4.00$2.00$7.00
15Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY3,096$4.00$10.03$6.00$4.50$6.00$9.00
16 (209.23010009)1,695$6.50$8.71$15.00$7.50$10.00$18.00
17Subbase Course, Type 2 (304.12)CY1,656$80.00$81.14$86.00$85.00$100.00$75.00
18 (404.0189)TON33$145.00$140.73$190.00$195.00$200.00$290.00
19 (404.0982)TON618$140.00$136.18$165.00$170.00$175.00$225.00
20 (404.2589)TON1,229$120.00$118.45$145.00$150.00$155.00$200.00
21Straight Tack Coat (407.0103)GAL555$7.50$7.04$11.30$11.50$12.00$30.00
22Asphalt Pavement Joint Adhesive (418.7603)LF2,028$1.00$1.29$1.54$2.00$2.00$5.50
23Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY4,307$6.50$6.53$8.00$9.00$10.00$25.00
24Interim Steel Sheeting (552.15)SF3,125$100.00$95.69$86.00$65.00$65.00$75.00
25Shields and Shoring (552.17)SF552$2.50$21.25$8.00$1.00$1.00$40.00
26 (552.230101)SF281$15.00$97.77$9.00$45.00$32.00$95.00
27 (553.020001)EACH1$20,000$23,315$35,000$55,000$1.00$25,000
28 (553.020002)EACH1$20,000$25,568$30,000$20,000$1.00$25,000
29 (553.020003)EACH1$20,000$18,336$20,000$50,000$1.00$25,000
30 (553.020004)EACH1$20,000$22,888$20,000$20,000$1.00$25,000
31 (553.020005)EACH1$20,000$25,866$35,000$50,000$1.00$25,000
32 (553.020006)EACH1$20,000$27,517$35,000$20,000$1.00$25,000
33Protective Sealing of New Structural Concrete (559.02)SF604$2.00$13.24$1.00$0.75$8.00$2.00
34 (595.50000018)4,397$5.50$4.47$3.00$4.00$5.50$7.00
35 (603.63080515)79$3,500.00$3,225.69$4,685.00$3,700.00$3,700.00$3,590.00
36 (603.64100715)68$3,700.00$3,648.71$4,600.00$4,600.00$3,800.00$3,975.00
37 (603.64160815)80$4,800.00$4,604.39$5,890.00$5,100.00$4,100.00$4,900.00
38Box Beam Guide Railing (606.10)LF1,773$65.00$62.15$54.00$55.00$58.00$66.00
39Box Beam Guide Railing End Assembly Type I (606.120102)EACH2$5,200.00$5,042.89$4,600.00$5,000.00$5,000.00$4,730.00
40Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH5$2,800.00$2,697.36$2,200.00$2,200.00$2,500.00$2,530.00
41Box Beam End Assembly Type III (606.1203)EACH3$7,300.00$7,036.60$7,000.00$7,000.00$6,500.00$6,600.00
42Removing and Disposing Cable Guide Railing (606.70)LF449$7.50$19.09$5.00$5.00$13.00$3.00
43Removing and Disposing Box Beam Guide Railing (606.73)LF1,250$6.00$19.19$6.00$5.50$9.00$5.00
44Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH2$480.00$606.13$1,500.00$425.00$850.00$280.00
45 (607.95000008)1,170$5.00$14.97$9.00$5.00$15.00$15.00
46Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON34$220.00$263.87$303.00$305.00$320.00$280.00
47Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY3$110.00$175.92$195.00$170.00$210.00$290.00
48Topsoil – Reuse On-Site Materials (610.1401)CY280$45.00$16.19$130.00$45.00$75.00$45.00
49Topsoil - Roadside (610.1402)CY187$90.00$100.04$85.00$93.00$120.00$120.00
50Turf Establishment - Roadside (610.1601)SY3,912$1.50$4.97$2.50$2.00$2.50$15.00
51Watering Vegetation (610.19)1,000 GALLONS1$20.00$1,172.77$1,000.00$1,000.00$105.00$500.00
52 (611.0201)EACH3$590.00$879.58$675.00$625.00$700.00$850.00
53 (611.0422)EACH15$85.00$117.27$109.00$125.00$115.00$185.00
54 (611.19020024)3$225.00$117.27$210.00$175.00$230.00$275.00
55 (611.19040024)7$35.00$76.23$64.00$30.00$75.00$60.00
56Rodent Guard (611.21)EACH3$30.00$117.27$20.00$35.00$22.00$30.00
57 (613.04000001)24$115.00$111.25$40.00$77.00$250.00$55.00
58 (616.15000024)600$20.00$17.59$30.00$65.00$28.00$65.00
59Basic Work Zone Traffic Control (619.01)LS1$135,000$178,610$70,000$140,000$450,000$75,000
60Type III Construction Barricades (619.04)EACH41$145.00$272.58$45.00$110.00$50.00$200.00
61 (619.06010009)1$73,000$65,394$65,000$45,000$18,000$18,000
62Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF1,745$8.50$8.21$7.00$7.00$8.00$1.75
63 (619.100104)LF3,100$6.50$6.45$5.50$5.50$6.00$5.00
64 (619.110513)EACH2$7,000.00$9,757.29$10,000$6,500.00$4,500.00$28,000
65 (619.110613)WEEK8$1,200.00$439.78$6,000.00$900.00$2,800.00$2,000.00
66 (619.130201)EACH2$20,000$30,785$15,000$95,000$35,000$32,000
67Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF760$60.00$111.14$80.00$30.00$75.00$55.00
68Warning Lights on Temporary Positive Barriers (619.1719)EACH37$45.00$125.92$35.00$45.00$40.00$38.00
69Temporary Rumble Strips (619.22)LF414$20.00$19.35$16.50$17.00$18.00$19.00
70Mailboxes (619.27)EACH1$320.00$457.37$200.00$350.00$100.00$500.00
71 (619.60750011)540$6.50$35.60$60.00$21.00$22.00$15.00
72Stone Filling (Fine) (620.02)CY21$155.00$522.25$145.00$210.00$260.00$220.00
73Stone Filling (Medium) (620.04)CY217$135.00$156.31$136.00$110.00$125.00$112.00
74Stone Filling (Heavy) (620.05)CY273$175.00$168.62$163.00$155.00$145.00$165.00
75Dry Rip-Rap (620.06)CY16$230.00$289.55$365.00$265.00$350.00$150.00
76Bedding Material, Type 1 (620.0801)CY60$115.00$100.12$94.00$110.00$150.00$125.00
77 (620.29110009)147$120.00$196.04$76.00$115.00$140.00$185.00
78Crushed Stone (In-Place Measure) (623.12)CY100$130.00$97.25$94.00$200.00$160.00$125.00
79Survey Operations (625.01)LS1$52,000$41,926$84,000$90,000$40,000$60,000
80Concrete Right of Way Markers Type H (High) (625.03)EACH17$1,200.00$1,391.37$2,200.00$620.00$1,200.00$260.00
81Concrete Right of Way Markers Type L (Low) (625.04)EACH2$1,200.00$1,391.37$3,000.00$620.00$1,100.00$210.00
82Steel Pin and Cap Right of Way Markers (625.05)EACH5$485.00$690.46$550.00$81.00$650.00$95.00
83 (627.50140008)1,416$3.00$6.40$4.00$5.00$4.00$12.00
84Concrete Cylinder Curing Equipment (637.04)EACH3$3,100.00$3,826.15$1,000.00$2,100.00$1,000.00$2,500.00
85Engineer’s Field Office – Type 3 (637.13)MONTH8$3,600.00$6,343.93$2,000.00$3,100.00$5,000.00$2,200.00
86Office Technology and Supplies (637.34)DOL3,200$1.00$1.00$1.00$1.00$1.00$1.00
87Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH26$25.00$58.45$22.00$25.00$21.00$25.00
88Steel Post, 2.0 lb/ft (646.32)EACH18$85.00$107.59$94.00$100.00$75.00$80.00
89Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH7$45.00$40.00$200.00$100.00$10.00$145.00
90 (663.0110)LF73$215.00$96.05$121.00$275.00$300.00$265.00
91 (663.1010)EACH2$4,600.00$4,427.03$4,500.00$8,250.00$8,400.00$4,200.00
92 (663.1810)EACH2$1,000.00$992.92$1,050.00$2,100.00$2,100.00$950.00
93Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB380$15.00$6.92$6.00$8.25$9.00$7.50
94 (663.2110)EACH8$245.00$455.79$200.00$200.00$210.00$260.00
95 (663.4110)LF80$45.00$37.91$15.00$210.00$210.00$35.00
96White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF5,068$3.00$2.93$2.50$2.50$3.00$5.00
97Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF5,068$3.00$2.93$2.50$2.50$3.00$5.00
98Field Change Payment (FCP) (697.03)DOL119,000$1.00$1.00$1.00$1.00$1.00$1.00
99Asphalt Price Adjustment (698.04)DOL631.59$1.00$1.00$1.00$1.00$1.00$1.00
100Fuel Price Adjustment (698.05)DOL303$1.00$1.00$1.00$1.00$1.00$1.00
101Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
102Mobilization (699.040001)LS1$118,031$131,258$110,000$144,000$140,000$75,000
NYSDOT contract D265635: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy