Vector Construction Corp: NYSDOT bid record
Vector Construction Corp submitted 100 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 24 of them (24%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $103,636,788
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 24 | 6 | 25% |
| 2023 | 20 | 3 | 15% |
| 2024 | 23 | 6 | 26% |
| 2025 | 20 | 7 | 35% |
| 2026 | 13 | 2 | 15% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 02 | 26 | 9 | 35% |
| Region 03 | 24 | 7 | 29% |
| Region 09 | 24 | 2 | 8% |
| Region 07 | 20 | 6 | 30% |
| Region 06 | 3 | 0 | 0% |
| Region 01 | 2 | 0 | 0% |
| Region 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 84 | 84 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 84 | 84 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 84 | 84 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 82 | 82 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 80 | 80 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 50 | 50 (100%) | $1.00 | $1.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 35 | 35 (100%) | $10.00 | $10.50 |
| Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs | 557.29 | SY | 35 | 33 (94%) | $0.01 | $0.10 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 28 | 28 (100%) | $75.00 | $85.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 27 | 27 (100%) | $80.00 | $90.00 |
| 691.04000020 | 24 | 24 (100%) | $1.00 | $1.00 | ||
| 404.0001 | TON | 24 | 24 (100%) | $80.00 | $95.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Slate Hill Constructors Inc | 67 | 34 of 67 |
| Economy Paving Co Inc | 38 | 20 of 38 |
| Bothar Construction LLC | 28 | 14 of 28 |
| Tioga Construction Company Inc | 23 | 14 of 23 |
| R De Vincentis Construction Inc | 18 | 12 of 18 |
| Ing Civil Inc | 15 | 6 of 15 |
| Winn Construction Services Inc | 14 | 5 of 14 |
| Luck Brothers Inc | 11 | 4 of 11 |
| Bette & Cring LLC | 10 | 8 of 10 |
| Lancaster Development and Tully Construction Co LLC | 10 | 3 of 10 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265806 | Region 09 | RT 23 bridge replacement over Canasawacta Creek | 2 of 7 | $4,682,316 | +3.0% |
| 17 SEP 2026 | D265829 | Region 09 | NYS Rte 51 (BIN 1026410) over Dunderberg Creek | 5 of 5 | $1,356,262 | +16% |
| 27 AUG 2026 | D265794 | Region 09 | Large Culvert Replacement. | 4 of 6 | $10,355,970 | +11% |
| 16 JUL 2026 | D265796 | Region 03 | I-81 OVER RT 11 NEDROW BRIDGE REPLACEMENT | 5 of 6 | $20,122,212 | +10% |
| 16 JUL 2026 | D265802 | Region 07 | NY ROUTE 232 OVER CSX RAILROAD | 2 of 2 | $4,845,209 | +19% |
| 25 JUN 2026 | D265784 | Region 07 | PIN 7143.40 - U.S. ROUTE 11 OVER CSX RAILROAD (ELLISBURG) | 3 of 4 | $4,121,061 | +29% |
| 09 APR 2026 | D265723 | Region 03 | Regional Deck and Joint Repair Project | 2 of 2 | $2,841,800 | +7.0% |
| 09 APR 2026 | D265762 | Region 02 | 2026 Job Order Contract (JOC): Bridges East | 1 of 1 | $1,350,000 | Low |
| 09 APR 2026 | D265763 | Region 02 | 2026 Job Order Contract (JOC): Bridges West | 1 of 1 | $1,260,000 | Low |
| 12 MAR 2026 | D265700 | Region 09 | Rehabilitation of I-86 Bridges over ICRR | 2 of 4 | $6,827,909 | +1.0% |
| 12 MAR 2026 | D265726 | Region 07 | REGION 7 CROSS PIN 6 - BRIDGE RESILIENCY PROJECT. | 2 of 3 | $7,759,264 | +12% |
| 05 MAR 2026 | D265635 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT 25 | 4 of 6 | $3,757,636 | +8.0% |
| 22 JAN 2026 | D265629 | Region 09 | BRIDGE DECK REPLACEMENT - NYS Route 434 Over Choconut Creek | 3 of 5 | $4,641,839 | +6.0% |
| 18 DEC 2025 | D265612 | Region 07 | NY Route 410 over the Black River Bridge Replacement | 2 of 2 | $35,611,877 | +47% |
| 04 DEC 2025 | D265597 | Region 07 | BRIDGE REPLACEMENTS (3), US ROUTE 11 | 2 of 3 | $13,409,049 | +34% |
| 06 NOV 2025 | D265563 | Region 02 | Job Order Contract Highway Maintenance, West, 26 | 1 of 1 | $781,200 | Low |
| 06 NOV 2025 | D265564 | Region 02 | Job Order Contract Highway Maintenance, East, 26 | 1 of 1 | $781,200 | Low |
| 06 NOV 2025 | D265592 | Region 07 | BRIDGE REPLACEMENT - NY Route 3, Town of Hounsfield | 3 of 4 | $2,565,423 | +15% |
| 23 OCT 2025 | D265533 | Region 02 | CULVERT REPAIR AND REPLACEMENT PROJECT ONEIDA COUNTY | 7 of 7 | $3,799,441 | +46% |
| 09 OCT 2025 | D265571 | Region 02 | REGIONAL WHERE AND WHEN 2026 & 2027 | 3 of 3 | $7,401,100 | +38% |
| 11 SEP 2025 | D265553 | Region 02 | LARGE CULVERT REPLACEMENTS | 1 of 5 | $4,807,226 | Low, 4.0% under the second |
| 07 AUG 2025 | D265468 | Region 03 | Regional Large Culvert Rehabilitation/Replacement Project | 2 of 2 | $8,504,399 | +30% |
| 07 AUG 2025 | D265493 | Region 03 | Route 221 Over Big Brook Bridge Replacement | 1 of 6 | $2,579,310 | Low, 3.0% under the second |
| 07 AUG 2025 | D265535 | Region 07 | BRIDGE AND CULVERT REPLACEMENT - NY Routes 3 and 12E | 2 of 3 | $18,203,721 | +10% |
| 07 AUG 2025 | D265555 | Region 06 | I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS | 6 of 6 | $9,592,868 | +90% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.