NYSDOT contract D265802 bid tabulation
NY ROUTE 232 OVER CSX RAILROAD. Let by New York State DOT on July 16, 2026, Jefferson, Region 07. 2 bids received; low bid $4,067,196 by Bette & Cring LLC.
- Owner
- New York State DOT
- Letting
- 16 JUL 2026
- Pay items
- 94
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bette & Cring LLC | $4,067,196 | Low |
| 2 | Vector Construction Corp | $4,845,209 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bette & Cring LLC | 2. Vector Construction Corp |
|---|---|---|---|---|---|
| 1 | Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202) | SF | 8,148 | $60.00 | $85.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 1,820 | $30.00 | $40.00 |
| 3 | Embankment In Place (203.03) | CY | 189 | $20.00 | $65.00 |
| 4 | Select Structural Fill (203.21) | CY | 71 | $150.00 | $140.00 |
| 5 | (203.24010017) | 45 | $100.00 | $85.00 | |
| 6 | Structure Excavation (206.01) | CY | 108 | $100.00 | $90.00 |
| 7 | Geotextile Stabilization (207.24) | SY | 2,735 | $3.00 | $4.00 |
| 8 | Sediment Filter Log – Temporary, 12″, Type A (209.1311) | LF | 1,295 | $6.00 | $8.00 |
| 9 | Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904) | SY | 880 | $3.50 | $5.00 |
| 10 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3313) | LS | 1 | $25,000 | $21,500 |
| 11 | Removal and Disposal of Caulking ACM (BV14) (210.3411) | LF | 207 | $80.00 | $80.00 |
| 12 | Subbase Course, Type 2 (304.12) | CY | 912 | $100.00 | $98.00 |
| 13 | (404.0983) | TON | 1,246 | $155.00 | $170.00 |
| 14 | (404.1989) | TON | 403 | $160.00 | $170.00 |
| 15 | (404.2589) | TON | 616 | $125.00 | $125.00 |
| 16 | Diluted Tack Coat (407.0102) | GAL | 1,519 | $4.00 | $4.00 |
| 17 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 5,387 | $1.00 | $1.00 |
| 18 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 10,575 | $5.00 | $2.20 |
| 19 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 543 | $20.00 | $21.00 |
| 20 | Concrete for Structures, Performance (555.0021) | CY | 21 | $5,000.00 | $6,500.00 |
| 21 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $14.50 | $14.50 |
| 22 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,467 | $2.00 | $10.00 |
| 23 | Stud Shear Connectors for Bridges (556.03) | EACH | 3,876 | $6.00 | $8.00 |
| 24 | (557.1019) | SY | 211 | $525.00 | $650.00 |
| 25 | (557.1119) | SY | 918 | $600.00 | $738.00 |
| 26 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 1,041 | $0.01 | $0.01 |
| 27 | (557.60010004) | 1,041 | $20.00 | $22.00 | |
| 28 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $12.25 | $12.25 |
| 29 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 1,041 | $7.50 | $9.00 |
| 30 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 9,532 | $1.00 | $0.70 |
| 31 | Protective Sealing of New Structural Concrete (559.02) | SF | 4,168 | $1.00 | $1.40 |
| 32 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 5,476 | $2.00 | $0.70 |
| 33 | Type E.B. Fixed Bearing (56 to 111 k) (565.2022) | EACH | 6 | $5,000.00 | $4,000.00 |
| 34 | Type E.B. Expansion Bearing (56 to 111 k) (565.2032) | EACH | 6 | $5,000.00 | $4,000.00 |
| 35 | Type E.B. Expansion Bearing (112 to 168 k) (565.2033) | EACH | 24 | $5,000.00 | $4,000.00 |
| 36 | Armorless Bridge Joint (567.60) | LF | 50 | $200.00 | $750.00 |
| 37 | Transition Bridge Railing (568.70) | LF | 160 | $230.00 | $220.00 |
| 38 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 395 | $240.00 | $340.00 |
| 39 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $12.40 | $12.40 |
| 40 | Decontamination Facilities (570.04) | CALENDAR WEEK | 7 | $50.00 | $1.00 |
| 41 | (570.150001) | LS | 1 | $100,000 | $112,000 |
| 42 | Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04) | LB | 4,258 | $1.00 | $1.00 |
| 43 | (573.010001) | LS | 1 | $200,000 | $300,000 |
| 44 | Removal of Structural Concrete (580.01) | CY | 26 | $3,000.00 | $4,800.00 |
| 45 | Removal and Replacement of Structural Concrete (582.0052) | SF | 310 | $300.00 | $440.00 |
| 46 | (582.99000016) | 200 | $1.00 | $35.00 | |
| 47 | (585.01) | EACH | 12 | $6,500.00 | $5,500.00 |
| 48 | (585.02) | EACH | 24 | $6,500.00 | $6,000.00 |
| 49 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 602 | $150.00 | $70.00 |
| 50 | Bridge Railing Removal and Disposal (587.01) | LF | 322 | $15.00 | $36.00 |
| 51 | Bridge Railing Removal and Storage (587.02) | LF | 64 | $20.00 | $34.00 |
| 52 | (589.520001) | EACH | 36 | $1,000.00 | $600.00 |
| 53 | Box Beam Guide Railing (606.10) | LF | 451 | $57.00 | $50.00 |
| 54 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 451 | $36.00 | $34.00 |
| 55 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 525 | $10.00 | $14.00 |
| 56 | (607.06400016) | 140 | $128.00 | $160.00 | |
| 57 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 20 | $250.00 | $280.00 |
| 58 | Stone Curb – Bridge (Type A) (609.0301) | LF | 60 | $145.00 | $190.00 |
| 59 | (609.99980001) | 543 | $10.00 | $13.00 | |
| 60 | Turf Establishment – Performance (610.1605) | SY | 699 | $12.00 | $14.00 |
| 61 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $120,000 | $242,000 |
| 62 | Type III Construction Barricades (619.04) | EACH | 50 | $200.00 | $240.00 |
| 63 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 362 | $5.00 | $9.00 |
| 64 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 18 | $100.00 | $120.00 |
| 65 | (619.0904) | LF | 174 | $5.00 | $9.00 |
| 66 | (619.111112) | EACH | 3 | $15,000 | $12,000 |
| 67 | (619.130101) | EACH | 1 | $50,000 | $60,000 |
| 68 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $50.00 | $50.00 |
| 69 | Temporary Rumble Strips (619.22) | LF | 216 | $18.00 | $18.00 |
| 70 | Stone Filling (Light) (620.03) | CY | 21 | $155.00 | $160.00 |
| 71 | Bedding Material, Type 1 (620.0801) | CY | 22 | $155.00 | $160.00 |
| 72 | Screened Gravel (In-Place Measure) (623.10) | CY | 1 | $200.00 | $240.00 |
| 73 | Survey Operations (625.01) | LS | 1 | $30,000 | $62,000 |
| 74 | (627.50140008) | 200 | $5.00 | $7.00 | |
| 75 | Field Laboratory (637.01) | EACH | 1 | $2,500.00 | $2,500.00 |
| 76 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $6,000.00 |
| 77 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 11 | $2,000.00 | $3,000.00 |
| 78 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 |
| 79 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 80 | Type A Sign Posts (645.81) | EACH | 1 | $220.00 | $220.00 |
| 81 | Reference Marker Panel (646.21) | EACH | 2 | $35.00 | $50.00 |
| 82 | Steel Post, 1.1 lb/ft (646.31) | EACH | 2 | $65.00 | $70.00 |
| 83 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $250.00 | $240.00 |
| 84 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 1 | $50.00 | $80.00 |
| 85 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 4 | $25.00 | $80.00 |
| 86 | (647.83001002) | 1 | $25.00 | $80.00 | |
| 87 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 16,745 | $1.00 | $0.85 |
| 88 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 12,296 | $1.00 | $0.85 |
| 89 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 4 | $125.00 | $150.00 |
| 90 | Field Change Payment (FCP) (697.03) | DOL | 336,000 | $1.00 | $1.00 |
| 91 | Asphalt Price Adjustment (698.04) | DOL | 2,100 | $1.00 | $1.00 |
| 92 | Fuel Price Adjustment (698.05) | DOL | 400 | $1.00 | $1.00 |
| 93 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 94 | Mobilization (699.040001) | LS | 1 | $153,001 | $170,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.