NYSDOT contract D265533 bid tabulation

CULVERT REPAIR AND REPLACEMENT PROJECT ONEIDA COUNTY. Let by New York State DOT on October 23, 2025, Oneida, Region 02. 7 bids received; low bid $2,597,975 by Cci Companies Inc.

Owner
New York State DOT
Letting
23 OCT 2025
Pay items
92
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cci Companies Inc$2,597,975Low
2Powis Contracting Inc$2,927,376+13%
3Peter Luizzi & Bros Contracting Inc$3,056,485+18%
4Mohawk Valley Materials Inc$3,110,918+20%
5Maple Ridge Organics LLC$3,122,032+20%
6Slate Hill Constructors Inc$3,333,540+28%
7Vector Construction Corp$3,799,441+46%
NYSDOT contract D265533: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cci Companies Inc2. Powis Contracting Inc3. Peter Luizzi & Bros Contracting Inc4. Mohawk Valley Materials Inc5. Maple Ridge Organics LLC6. Slate Hill Constructors Inc
1Clearing and Grubbing (201.06)LS1$130,000$15,000$55,000$17,510$25,500$50,000
2 (202.010001)LS1$76,000$25,000$38,000$154,484$85,500$300,000
3Unclassified Excavation and Disposal (203.02)CY14,902$18.00$24.00$34.00$27.38$28.00$40.00
4Embankment In Place (203.03)CY4,594$9.50$35.00$50.00$14.96$49.00$36.00
5Select Granular Fill (203.07)CY129$132.00$150.00$74.00$110.80$58.00$95.00
6Structure Excavation (206.01)CY2,504$7.00$86.24$37.00$32.46$44.00$48.00
7Trench and Culvert Excavation (206.0201)CY3,495$12.00$61.79$41.00$35.65$46.00$42.00
8Geotextile Bedding (207.20)SY130$10.00$10.52$15.00$14.03$6.50$7.00
9Seed and Mulch – Temporary (209.1003)SY1,963$0.85$2.72$1.00$2.25$0.90$1.00
10Silt Fence - Temporary (209.13)LF500$5.00$8.97$4.50$24.86$6.00$5.00
11Turbidity Curtain – Temporary (209.1501)LF164$10.00$33.89$35.00$50.57$34.00$18.00
12Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY2,904$4.35$5.95$5.90$2.94$4.00$5.00
13 (209.23010009)2,264$10.00$9.54$7.00$5.65$7.00$8.00
14 (210.29050002)70,000$1.00$1.00$1.00$1.00$1.00$1.00
15Subbase Course, Type 2 (304.12)CY421$100.00$79.43$85.00$65.03$88.00$120.00
16 (404.0001)TON13$90.00$90.00$90.00$90.00$90.00$90.00
17 (404.0982)TON65$275.00$251.18$270.00$244.81$155.00$185.00
18 (404.1989)TON190$175.00$190.08$210.00$168.86$145.00$160.00
19Straight Tack Coat (407.0103)GAL43$2.35$30.70$8.50$23.69$6.00$13.00
20Asphalt Pavement Joint Adhesive (418.7603)LF866$2.10$1.83$4.50$20.13$2.50$3.00
21Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY48$50.00$185.80$40.00$96.82$91.00$135.00
22 (553.030001)EACH1$23,000$40,900$22,000$19,709$29,500$1.00
23 (553.030002)EACH1$55,000$40,900$22,000$55,639$29,500$1.00
24Concrete for Structures, Performance (555.0021)CY3$2,500.00$2,224.65$3,700.00$2,771.02$3,750.00$6,000.00
25 (555.10000006)38$300.00$391.45$740.00$307.76$440.00$200.00
26Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00$10.00
27Protective Sealing of New Structural Concrete (559.02)SF444$7.50$3.18$3.00$7.23$2.00$10.00
28Steel Bridge Railing (Three-Rail) (568.54)LF42$210.00$297.37$275.00$343.47$265.00$300.00
29Transition Bridge Railing (568.70)LF128$200.00$246.10$250.00$284.25$270.00$250.00
30 (595.50000018)1,871$5.00$3.13$5.20$5.52$6.00$7.00
31Structural Paving of Inverts with Portland Cement Concrete (602.2002)SF893$112.00$47.05$68.00$113.74$29.00$110.00
32 (603.171416)EACH1$700.00$3,908.23$900.00$6,131.27$1,250.00$400.00
33 (603.172212)EACH2$5,000.00$9,673.57$7,000.00$8,302.04$3,900.00$4,250.00
34 (603.63160815)58$6,100.00$6,028.14$6,150.00$7,012.11$6,600.00$5,500.00
35Box Beam Guide Railing (606.10)LF1,019$47.00$44.09$56.00$50.93$59.00$55.00
36Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF106$55.00$63.58$62.00$73.43$66.00$65.00
37Box Beam Guide Railing End Assembly Type I (606.120102)EACH2$4,200.00$4,101.68$4,800.00$4,737.45$5,050.00$4,500.00
38Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH6$2,200.00$2,204.65$2,500.00$2,546.37$2,450.00$2,200.00
39Removing and Disposing Cable Guide Railing (606.70)LF701$9.50$9.55$3.00$7.29$6.50$16.00
40Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH6$600.00$2,230.74$550.00$94.48$620.00$1,100.00
41 (607.41010010)400$5.00$7.69$6.50$12.31$5.00$8.00
42Topsoil – Reuse On-Site Materials (610.1401)CY704$45.00$46.17$47.00$30.71$44.00$75.00
43Topsoil - Roadside (610.1402)CY34$100.00$268.85$85.00$189.45$91.00$100.00
44Turf Establishment - Roadside (610.1601)SY3,035$1.20$2.00$3.50$1.78$2.00$1.25
45 (610.16020324)3,617$1.35$2.15$4.30$1.78$2.00$1.50
46Watering Vegetation (610.19)1,000 GALLONS6$100.00$605.00$110.00$1,184.36$21.00$110.00
47 (611.0161)EACH8$675.00$984.40$650.00$710.62$580.00$700.00
48 (611.0341)EACH16$360.00$774.19$470.00$710.62$390.00$375.00
49 (611.0441)EACH42$95.00$112.80$115.00$177.65$82.00$100.00
50 (611.19010024)4$105.00$590.64$59.00$1,776.54$130.00$110.00
51 (611.19030024)8$5.25$466.57$36.00$1,776.54$140.00$53.00
52 (615.01010108)573$150.00$106.31$168.00$89.07$96.00$150.00
53 (616.08000024)686$15.50$19.48$18.00$23.69$16.00$20.00
54 (616.14000024)3$1,200.00$6,095.62$1,100.00$5,761.84$300.00$1,550.00
55 (617.10000024)25$250.00$112.17$55.00$375.37$81.00$100.00
56 (617.11000024)LS1$3,000.00$959.63$2,700.00$6,731.14$645.00$3,250.00
57Basic Work Zone Traffic Control (619.01)LS1$80,000$135,000$80,000$10,591$165,000$100,000
58Type III Construction Barricades (619.04)EACH6$100.00$281.70$150.00$615.17$230.00$50.00
59 (619.110513)EACH2$7,000.00$19,553$15,000$21,319$7,050.00$8,000.00
60Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF240$60.00$127.05$45.00$120.17$54.00$60.00
61Warning Lights on Temporary Positive Barriers (619.1719)EACH18$50.00$41.06$55.00$78.23$17.00$40.00
62Stone Filling (Light) (620.03)CY134$125.00$151.98$135.00$127.97$98.00$140.00
63Stone Filling (Heavy) (620.05)CY2,029$165.00$87.04$135.00$176.87$215.00$140.00
64Bedding Material, Type 1 (620.0801)CY650$115.00$120.80$115.00$105.82$89.00$120.00
65 (620.30010001)228$250.00$142.29$270.00$425.48$220.00$235.00
66Crushed Stone (In-Place Measure) (623.12)CY56$165.00$173.64$115.00$110.73$120.00$150.00
67Survey Operations (625.01)LS1$25,000$38,453$43,000$11,844$41,500$20,000
68Concrete Right of Way Markers Type H (High) (625.03)EACH5$1,650.00$1,696.77$750.00$118.44$825.00$1,150.00
69Steel Pin and Cap Right of Way Markers (625.05)EACH1$500.00$1,060.49$550.00$59.22$605.00$700.00
70 (625.09010015)LS1$18,000$3,588.97$5,000.00$71,442$2,300.00$2,500.00
71 (627.50140008)717$10.00$11.09$4.40$5.92$3.00$6.00
72Concrete Cylinder Curing Equipment (637.04)EACH1$1.00$5,864.12$3,200.00$6,772.18$2,000.00$100.00
73Engineer’s Field Office – Type 3 (637.13)MONTH12$3,000.00$6,648.82$2,900.00$10,147$3,450.00$4,000.00
74Office Technology and Supplies (637.34)DOL2,000$1.00$1.00$1.00$1.00$1.00$1.00
75 (637.41000115)12$235.00$174.07$165.00$296.09$250.00$250.00
76Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF8$44.00$43.07$48.00$49.74$76.00$67.00
77Type A Sign Posts (645.81)EACH3$215.00$169.20$300.00$195.42$290.00$250.00
78Reference Marker Panel (646.21)EACH1$34.00$30.76$58.00$35.53$50.00$45.00
79Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH20$16.00$19.48$35.00$22.50$27.00$23.00
80Steel Post, 2.0 lb/ft (646.32)EACH16$68.00$61.53$100.00$71.06$110.00$100.00
81Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH2$130.00$164.07$180.00$189.49$185.00$165.00
82Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH1$26.00$132.56$48.00$280.46$575.00$11.00
83 (647.83001002)7$19.00$132.56$15.00$320.53$100.00$11.00
84 (658.11000017)15$400.00$256.36$260.00$398.30$52.00$850.00
85 (658.14000002)3$500.00$3,076.26$2,400.00$2,960.91$905.00$550.00
86White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF1,056$6.25$4.61$7.20$7.11$6.00$7.00
87Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF128$6.25$10.25$7.20$7.11$6.00$7.00
88Field Change Payment (FCP) (697.03)DOL107,000$1.00$1.00$1.00$1.00$1.00$1.00
89Asphalt Price Adjustment (698.04)DOL188.33$1.00$1.00$1.00$1.00$1.00$1.00
90Fuel Price Adjustment (698.05)DOL929$1.00$1.00$1.00$1.00$1.00$1.00
91Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
92Mobilization (699.040001)LS1$99,000$35,789$116,000$50,335$120,000$120,000
NYSDOT contract D265533: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy