Peter Luizzi & Bros Contracting Inc: NYSDOT bid record

Peter Luizzi & Bros Contracting Inc submitted 12 bids on New York State DOT contracts in the data, from 16 JUN 2022 to 15 OCT 2026, and was the low bidder on 3 of them (25%). When it was not low, its total sat a median +20% above the low bid.

Owner
New York State DOT
Low bid volume
$14,573,969
Latest bid
15 OCT 2026
Data through
15 OCT 2026
12Bids
3Low bids
25Win rate, percent
+20%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
2022200%
20245120%
20253133%
20262150%
Peter Luizzi & Bros Contracting Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 028225%
Region 014125%
Peter Luizzi & Bros Contracting Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1212 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1212 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1212 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1212 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1212 (100%)$1.00$1.00
Seed and Mulch – Temporary209.1003SY87 (88%)$1.00$1.75
404.0001TON77 (100%)$80.00$95.00
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT66 (100%)$80.00$90.00
627.50140008125 (42%)$4.40$6.00
Performance Concrete Quality Adjustment – Concrete for Structures555.9902QUALITY UNIT55 (100%)$12.50$10.50
Subbase Course, Type 2304.12CY124 (33%)$88.00$96.00
Topsoil - Roadside610.1402CY64 (67%)$105.00$105.00
Peter Luizzi & Bros Contracting Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Callanan Industries Inc52 of 5
Rifenburg Construction Inc52 of 5
Bothar Construction LLC53 of 5
Slate Hill Constructors Inc53 of 5
Vector Construction Corp42 of 4
Kubricky-Jointa Lime LLC32 of 3
Cci Companies Inc31 of 3
BP Excavation LLC21 of 2
James H Maloy Inc22 of 2
Maple Ridge Organics LLC21 of 2
Peter Luizzi & Bros Contracting Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
15 OCT 2026D265834Region 02Route 5 Pavement Rehabilitation: City of Amsterdam2 of 5$1,997,326+29%
25 JUN 2026D265805Region 02ROUTE 5S & 30A MONTGOMERY COUNTY PAVING REHABILITATION1 of 4$4,988,888Low, 8.0% under the second
23 OCT 2025D265533Region 02CULVERT REPAIR AND REPLACEMENT PROJECT ONEIDA COUNTY3 of 7$3,056,485+18%
23 OCT 2025D265582Region 01Drainage Repair and Resurfacing - Route 5 (Central Ave)1 of 3$6,060,961Low, 19% under the second
11 SEP 2025D265553Region 02LARGE CULVERT REPLACEMENTS3 of 5$5,324,714+11%
21 NOV 2024D265328Region 01Culvert Repair / Replacement SFY 254 of 4$4,610,781+20%
21 NOV 2024D265347Region 02Intersection improvement - RTE 67 AT CLIZBE AVENUE7 of 8$655,296+46%
21 NOV 2024D265355Region 02CULVERT REPAIR AND REPLACEMENT PROJECT 24 ONEIDA COUNTY5 of 5$2,993,868+30%
24 OCT 2024D265330Region 02LARGE CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS1 of 5$3,524,120Low, 3.0% under the second
11 JUL 2024D265261Region 01INTERSECTION SAFETY IMPROVEMENT - NY Rte 292 of 3$3,465,012+3.0%
15 DEC 2022D264925Region 02CULVERT REPLACEMENT PROJECT, FULTON COUNTY5 of 5$2,141,660+26%
16 JUN 2022D264827Region 01US-4 (Central Avenue) Pavement Resurfacing, Mechanicville2 of 4$2,197,598+10%
Peter Luizzi & Bros Contracting Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy