NYSDOT contract D265553 bid tabulation
LARGE CULVERT REPLACEMENTS. Let by New York State DOT on September 11, 2025, Madison, Oneida, Region 02. 5 bids received; low bid $4,807,226 by Vector Construction Corp.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 130
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vector Construction Corp | $4,807,226 | Low |
| 2 | Slate Hill Constructors Inc | $4,982,016 | +4.0% |
| 3 | Peter Luizzi & Bros Contracting Inc | $5,324,714 | +11% |
| 4 | Bothar Construction LLC | $5,415,622 | +13% |
| 5 | Cci Companies Inc | $5,447,187 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vector Construction Corp | 2. Slate Hill Constructors Inc | 3. Peter Luizzi & Bros Contracting Inc | 4. Bothar Construction LLC | 5. Cci Companies Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $150,000 | $225,000 | $60,000 | $41,000 | $175,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 4,969 | $30.00 | $40.00 | $40.00 | $51.50 | $27.50 |
| 3 | Embankment In Place (203.03) | CY | 7,532 | $30.00 | $30.00 | $58.00 | $52.65 | $72.00 |
| 4 | Select Granular Fill (203.07) | CY | 325 | $65.00 | $80.00 | $80.00 | $98.00 | $155.00 |
| 5 | Select Structural Fill (203.21) | CY | 358 | $65.00 | $95.00 | $90.00 | $95.90 | $158.00 |
| 6 | Structure Excavation (206.01) | CY | 7,088 | $30.00 | $38.00 | $40.00 | $29.00 | $36.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 214 | $45.00 | $38.00 | $40.00 | $22.25 | $140.00 |
| 8 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 100 | $80.00 | $62.00 | $100.00 | $74.75 | $76.00 |
| 9 | Geotextile Bedding (207.20) | SY | 90 | $18.00 | $9.00 | $8.00 | $18.00 | $11.00 |
| 10 | Geotextile Separation (207.21) | SY | 986 | $6.00 | $4.00 | $4.80 | $2.00 | $2.00 |
| 11 | Geotextile Stabilization (207.24) | SY | 986 | $6.00 | $4.00 | $4.80 | $3.20 | $2.00 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 150 | $17.00 | $18.00 | $22.00 | $24.00 | $22.00 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 3,163 | $1.86 | $2.00 | $1.00 | $2.30 | $2.00 |
| 14 | (209.140301) | EACH | 1 | $250.00 | $1,500.00 | $370.00 | $1,223.00 | $900.00 |
| 15 | (209.140302) | EACH | 1 | $250.00 | $1,500.00 | $370.00 | $1,223.00 | $900.00 |
| 16 | Rolled Erosion Control Product, Class II Type B, Intermediate (209.190201) | SY | 1,456 | $6.50 | $7.00 | $7.80 | $8.00 | $7.00 |
| 17 | (209.23010009) | 1,842 | $10.92 | $11.50 | $8.00 | $13.50 | $11.00 | |
| 18 | Subbase Course, Type 2 (304.12) | CY | 1,766 | $90.00 | $95.00 | $85.00 | $72.20 | $125.00 |
| 19 | (404.0001) | TON | 68 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 20 | (404.0982) | TON | 316 | $190.00 | $195.00 | $250.00 | $189.00 | $200.00 |
| 21 | (404.2589) | TON | 1,023 | $135.00 | $135.00 | $210.00 | $146.00 | $145.00 |
| 22 | Diluted Tack Coat (407.0102) | GAL | 406 | $2.00 | $3.00 | $10.00 | $8.60 | $2.50 |
| 23 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 605 | $5.00 | $6.00 | $6.00 | $4.75 | $7.00 |
| 24 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,202 | $16.00 | $19.00 | $11.00 | $12.00 | $22.00 |
| 25 | (553.030001) | EACH | 1 | $35,000 | $1.00 | $30,000 | $13,100 | $40,000 |
| 26 | (553.030002) | EACH | 1 | $95,000 | $50,000 | $30,000 | $87,800 | $95,000 |
| 27 | (554.3001) | SF | 1,917 | $60.00 | $90.00 | $54.00 | $44.00 | $120.00 |
| 28 | Fill Type Retaining Wall (0 – 6 ft.) (554.40) | SF | 210 | $125.00 | $165.00 | $125.00 | $204.00 | $185.00 |
| 29 | Fill Type Retaining Wall (Greater than 6 ft. – 12 ft.) (554.41) | SF | 631 | $110.00 | $165.00 | $125.00 | $99.00 | $220.00 |
| 30 | Fill Type Retaining Wall (Greater than 12 ft. – 18 ft.) (554.42) | SF | 296 | $135.00 | $165.00 | $125.00 | $101.30 | $250.00 |
| 31 | (555.97130016) | 6 | $3,500.00 | $8,000.00 | $3,500.00 | $3,890.00 | $4,200.00 | |
| 32 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 33 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 1,708 | $5.00 | $6.00 | $5.00 | $5.60 | $3.15 |
| 34 | (559.90010011) | 571 | $45.00 | $10.00 | $8.00 | $7.50 | $5.00 | |
| 35 | (559.91100010) | 1,137 | $4.00 | $2.00 | $4.00 | $4.00 | $5.00 | |
| 36 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 30 | $325.00 | $330.00 | $370.00 | $356.50 | $310.00 |
| 37 | Transition Bridge Railing (568.70) | LF | 130 | $2.00 | $200.00 | $215.00 | $210.00 | $183.00 |
| 38 | (595.50000018) | 4,263 | $4.00 | $7.00 | $6.50 | $5.15 | $11.00 | |
| 39 | (602.90100607) | 109 | $4,500.00 | $3,800.00 | $9,500.00 | $11,600 | $4,000.00 | |
| 40 | (603.171614) | EACH | 1 | $844.00 | $1,050.00 | $1,300.00 | $2,150.00 | $1,100.00 |
| 41 | (603.63060615) | 82 | $2,500.00 | $2,400.00 | $2,230.00 | $2,130.00 | $2,600.00 | |
| 42 | (603.63100615) | 35 | $4,000.00 | $4,300.00 | $4,380.00 | $3,940.00 | $5,400.00 | |
| 43 | (603.64140915) | 78 | $4,000.00 | $3,100.00 | $3,870.00 | $2,850.00 | $4,000.00 | |
| 44 | (603.67000001) | 110 | $2,200.00 | $2,600.00 | $1,680.00 | $2,010.00 | $3,500.00 | |
| 45 | Concrete Collars (603.77) | EACH | 1 | $4,000.00 | $1,900.00 | $2,900.00 | $3,102.00 | $2,000.00 |
| 46 | (603.9824) | LF | 45 | $80.00 | $70.00 | $89.00 | $81.30 | $60.00 |
| 47 | (605.03020015) | 144 | $44.00 | $160.00 | $67.00 | $57.85 | $135.00 | |
| 48 | Underdrain Filter, Type II (605.1001) | CY | 26 | $132.00 | $150.00 | $160.00 | $110.45 | $222.00 |
| 49 | (605.1702) | LF | 306 | $14.00 | $15.00 | $15.00 | $7.45 | $14.00 |
| 50 | Box Beam Guide Railing (606.10) | LF | 1,036 | $60.00 | $52.00 | $57.00 | $55.20 | $48.00 |
| 51 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 111 | $62.00 | $60.00 | $62.00 | $60.40 | $53.00 |
| 52 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $5,000.00 | $4,500.00 | $5,000.00 | $4,836.00 | $4,250.00 |
| 53 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $3,000.00 | $2,200.00 | $2,460.00 | $2,370.00 | $2,100.00 |
| 54 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,049 | $6.00 | $5.00 | $6.00 | $6.20 | $5.00 |
| 55 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $500.00 | $800.00 | $160.00 | $167.00 | $135.00 |
| 56 | (607.08000010) | 587 | $85.00 | $100.00 | $85.00 | $80.50 | $85.00 | |
| 57 | (607.41010010) | 650 | $7.00 | $7.00 | $8.00 | $8.35 | $6.00 | |
| 58 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 13 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 59 | Concrete Sidewalks and Driveways (608.0101) | CY | 2 | $2,800.00 | $3,000.00 | $2,500.00 | $2,020.00 | $4,000.00 |
| 60 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 241 | $225.00 | $230.00 | $380.00 | $230.00 | $260.00 |
| 61 | (608.21000003) | 3 | $500.00 | $500.00 | $450.00 | $371.00 | $400.00 | |
| 62 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 33 | $140.00 | $130.00 | $220.00 | $278.00 | $275.00 |
| 63 | Topsoil - Lawns (610.1403) | CY | 4.30 | $350.00 | $300.00 | $95.00 | $340.00 | $185.00 |
| 64 | Turf Establishment – Performance (610.1605) | SY | 3,909 | $6.00 | $25.00 | $10.00 | $14.60 | $21.00 |
| 65 | Watering Vegetation (610.19) | 1,000 GALLONS | 2 | $300.00 | $575.00 | $170.00 | $632.50 | $525.00 |
| 66 | (611.0181) | EACH | 3 | $2,200.00 | $1,450.00 | $750.00 | $1,569.75 | $1,365.00 |
| 67 | (611.0451) | EACH | 3 | $350.00 | $160.00 | $115.00 | $172.50 | $150.00 |
| 68 | (611.19010024) | 3 | $600.00 | $450.00 | $300.00 | $471.50 | $410.00 | |
| 69 | (611.19040024) | 3 | $60.00 | $50.00 | $300.00 | $51.75 | $45.00 | |
| 70 | Rodent Guard (611.21) | EACH | 3 | $30.00 | $40.00 | $115.00 | $40.25 | $35.00 |
| 71 | (613.04000001) | 97 | $160.00 | $200.00 | $80.00 | $136.00 | $200.00 | |
| 72 | (615.03070108) | 1 | $20,000 | $6,000.00 | $1,700.00 | $4,700.00 | $7,000.00 | |
| 73 | (617.10000024) | 56 | $100.00 | $85.00 | $55.00 | $83.75 | $180.00 | |
| 74 | (617.11000024) | LS | 1 | $1,500.00 | $5,000.00 | $2,600.00 | $2,920.00 | $1,500.00 |
| 75 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $395,000 | $500,000 | $235,000 | $144,331 | $160,000 |
| 76 | Type III Construction Barricades (619.04) | EACH | 26 | $140.00 | $50.00 | $120.00 | $124.00 | $200.00 |
| 77 | (619.100101) | LF | 4,483 | $1.25 | $1.50 | $0.70 | $1.55 | $1.30 |
| 78 | (619.110513) | EACH | 4 | $9,500.00 | $4,600.00 | $12,000 | $8,900.00 | $3,700.00 |
| 79 | (619.130201) | EACH | 1 | $180,000 | $30,000 | $25,000 | $95,500 | $40,000 |
| 80 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $30.00 | $85.00 | $47.00 | $94.30 | $37.00 |
| 81 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 2,580 | $35.00 | $55.00 | $47.00 | $84.87 | $34.00 |
| 82 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 132 | $50.00 | $20.00 | $47.00 | $59.00 | $75.00 |
| 83 | Temporary Rumble Strips (619.22) | LF | 192 | $18.00 | $18.00 | $20.00 | $21.00 | $25.00 |
| 84 | Mailboxes (619.27) | EACH | 1 | $100.00 | $100.00 | $225.00 | $268.00 | $175.00 |
| 85 | Stone Filling (Light) (620.03) | CY | 64 | $145.00 | $125.00 | $165.00 | $90.00 | $300.00 |
| 86 | Stone Filling (Medium) (620.04) | CY | 160 | $145.00 | $150.00 | $165.00 | $102.00 | $275.00 |
| 87 | Bedding Material, Type 1 (620.0801) | CY | 40 | $145.00 | $150.00 | $120.00 | $100.00 | $235.00 |
| 88 | Bedding Material, Type 2 (620.0802) | CY | 32 | $145.00 | $150.00 | $130.00 | $86.35 | $250.00 |
| 89 | (621.51970008) | 232 | $12.00 | $35.00 | $11.00 | $21.65 | $60.00 | |
| 90 | Survey Operations (625.01) | LS | 1 | $75,000 | $40,000 | $81,000 | $110,000 | $55,000 |
| 91 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 9 | $600.00 | $800.00 | $700.00 | $1,325.00 | $600.00 |
| 92 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 3 | $250.00 | $425.00 | $530.00 | $1,400.00 | $115.00 |
| 93 | (625.05010006) | 1 | $150.00 | $220.00 | $600.00 | $124.00 | $1,200.00 | |
| 94 | (627.50140008) | 379 | $4.00 | $6.00 | $4.40 | $15.00 | $14.00 | |
| 95 | Field Laboratory (637.01) | EACH | 4 | $1,000.00 | $2,000.00 | $2,400.00 | $560.00 | $3,500.00 |
| 96 | Concrete Cylinder Curing Equipment (637.04) | EACH | 4 | $1,500.00 | $1,000.00 | $2,700.00 | $5,000.00 | $1,000.00 |
| 97 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 12 | $6,000.00 | $4,000.00 | $3,300.00 | $2,730.00 | $4,000.00 |
| 98 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 99 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 27 | $65.00 | $55.00 | $60.00 | $58.00 | $51.00 |
| 100 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 44 | $65.00 | $50.00 | $52.00 | $50.00 | $44.00 |
| 101 | Type A Sign Posts (645.81) | EACH | 19 | $310.00 | $230.00 | $250.00 | $248.00 | $215.00 |
| 102 | (645.81090003) | 5 | $70.00 | $73.00 | $80.00 | $78.20 | $68.00 | |
| 103 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 12 | $30.00 | $24.00 | $25.00 | $24.75 | $22.00 |
| 104 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 3 | $25.00 | $42.00 | $47.00 | $46.00 | $40.00 |
| 105 | Steel Post, 2.0 lb/ft (646.32) | EACH | 11 | $110.00 | $100.00 | $105.00 | $103.00 | $90.00 |
| 106 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 6 | $225.00 | $160.00 | $170.00 | $172.50 | $150.00 |
| 107 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 7 | $25.00 | $10.00 | $45.00 | $34.50 | $30.00 |
| 108 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 7 | $40.00 | $10.00 | $57.00 | $57.50 | $50.00 |
| 109 | (647.83001002) | 1 | $40.00 | $10.00 | $28.00 | $11.50 | $10.00 | |
| 110 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 519 | $12.00 | $15.00 | $34.00 | $14.30 | $16.00 |
| 111 | (670.2002) | LF | 180 | $30.00 | $24.00 | $53.00 | $28.75 | $27.00 |
| 112 | (670.2602) | LF | 100 | $10.00 | $8.00 | $22.00 | $20.70 | $8.25 |
| 113 | (670.30010139) | 4 | $1,000.00 | $1,200.00 | $1,170.00 | $1,782.50 | $950.00 | |
| 114 | Pullboxes over 7 1/2 to 10 cubic feet, inside volume (Lighting) (670.3010) | EACH | 3 | $3,000.00 | $2,000.00 | $1,900.00 | $2,771.50 | $2,650.00 |
| 115 | (670.40240008) | 1 | $3,000.00 | $2,000.00 | $4,900.00 | $4,542.50 | $3,000.00 | |
| 116 | (670.41090611) | 2 | $500.00 | $650.00 | $1,650.00 | $1,700.00 | $500.00 | |
| 117 | (670.42010002) | 1 | $5,000.00 | $5,500.00 | $7,500.00 | $8,855.00 | $4,900.00 | |
| 118 | (670.7003) | LF | 450 | $3.00 | $3.30 | $3.70 | $8.90 | $3.00 |
| 119 | (670.7006) | LF | 400 | $2.00 | $2.00 | $3.00 | $4.00 | $1.50 |
| 120 | Ground Wire No. 6 AWG. (670.7501) | LF | 226 | $2.50 | $4.00 | $3.50 | $7.50 | $2.30 |
| 121 | (670.75070011) | 200 | $1.50 | $2.00 | $2.60 | $4.00 | $1.40 | |
| 122 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $1,800.00 | $1,000.00 | $900.00 | $1,100.00 | $1,100.00 |
| 123 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,238 | $4.00 | $4.50 | $4.00 | $4.90 | $3.50 |
| 124 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 2,949 | $4.00 | $4.50 | $4.00 | $4.90 | $3.50 |
| 125 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 57 | $5.00 | $5.50 | $6.00 | $5.75 | $5.00 |
| 126 | Field Change Payment (FCP) (697.03) | DOL | 198,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 127 | Asphalt Price Adjustment (698.04) | DOL | 913.89 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 128 | Fuel Price Adjustment (698.05) | DOL | 1,538 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 129 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 130 | Mobilization (699.040001) | LS | 1 | $180,000 | $160,000 | $200,000 | $205,801 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.