NYSDOT contract D265834 bid tabulation
Route 5 Pavement Rehabilitation: City of Amsterdam. Let by New York State DOT on October 15, 2026, Montgomery, Region 02. 5 bids received; low bid $1,543,133 by Callanan Industries Inc.
- Owner
- New York State DOT
- Letting
- 15 OCT 2026
- Pay items
- 56
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Callanan Industries Inc | $1,543,133 | Low |
| 2 | Peter Luizzi & Bros Contracting Inc | $1,997,326 | +29% |
| 3 | Heidelberg Materials Northeast LLC | $2,006,985 | +30% |
| 4 | Cci Companies Inc | $2,017,970 | +31% |
| 5 | Kubricky-Jointa Lime LLC | $2,308,323 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Callanan Industries Inc | 2. Peter Luizzi & Bros Contracting Inc | 3. Heidelberg Materials Northeast LLC | 4. Cci Companies Inc | 5. Kubricky-Jointa Lime LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 318 | $160.00 | $180.00 | $140.00 | $220.00 | $110.00 |
| 2 | Embankment In Place (203.03) | CY | 9 | $500.00 | $120.00 | $246.00 | $120.00 | $155.00 |
| 3 | Trench and Culvert Excavation (206.0201) | CY | 132 | $160.00 | $100.00 | $123.00 | $360.00 | $71.00 |
| 4 | Sediment Filter Log - Temporary, 12”, Type B (209.1312) | LF | 617 | $10.00 | $8.00 | $16.00 | $21.00 | $10.50 |
| 5 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 15 | $400.00 | $220.00 | $260.00 | $1,000.00 | $365.00 |
| 6 | Subbase Course, Type 2 (304.12) | CY | 154 | $400.00 | $205.00 | $360.00 | $500.00 | $515.00 |
| 7 | (404.0589) | TON | 472 | $150.00 | $175.00 | $200.00 | $300.00 | $180.00 |
| 8 | (404.0972) | TON | 1,414 | $150.00 | $146.00 | $185.00 | $170.00 | $195.00 |
| 9 | (407.01040009) | 1,853 | $10.00 | $8.20 | $3.75 | $17.00 | $7.15 | |
| 10 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 13,391 | $1.00 | $1.00 | $0.90 | $1.30 | $1.10 |
| 11 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 15,405 | $3.00 | $4.80 | $2.85 | $9.00 | $3.50 |
| 12 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,348 | $8.00 | $9.50 | $20.00 | $13.00 | $28.50 |
| 13 | (604.070201) | EACH | 29 | $1,500.00 | $2,500.00 | $2,900.00 | $1,800.00 | $1,550.00 |
| 14 | (604.070202) | EACH | 5 | $1,600.00 | $2,800.00 | $5,700.00 | $5,500.00 | $5,100.00 |
| 15 | Prefabricated Adjustment Rings for Manholes (604.10) | EACH | 10 | $700.00 | $950.00 | $860.00 | $1,100.00 | $720.00 |
| 16 | Underdrain Filter, Type I (605.0901) | CY | 132 | $200.00 | $170.00 | $227.00 | $336.00 | $72.50 |
| 17 | (605.1502) | LF | 1,578 | $8.00 | $22.00 | $11.00 | $18.00 | $22.50 |
| 18 | (607.41010010) | 876 | $6.00 | $10.00 | $9.00 | $17.00 | $6.85 | |
| 19 | Concrete Sidewalks and Driveways (608.0101) | CY | 103 | $1,300.00 | $1,850.00 | $1,575.00 | $1,500.00 | $1,750.00 |
| 20 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 15 | $600.00 | $560.00 | $475.00 | $475.00 | $820.00 |
| 21 | (608.21000003) | 55 | $250.00 | $380.00 | $477.00 | $465.00 | $940.00 | |
| 22 | (609.0401) | LF | 1,837 | $70.00 | $100.00 | $77.00 | $120.00 | $87.50 |
| 23 | Topsoil - Roadside (610.1402) | CY | 15 | $400.00 | $100.00 | $610.00 | $420.00 | $315.00 |
| 24 | Turf Establishment -Lawns (610.1602) | SY | 15 | $125.00 | $36.00 | $34.00 | $45.00 | $145.00 |
| 25 | Watering Vegetation (610.19) | 1,000 GALLONS | 1 | $500.00 | $125.00 | $1,000.00 | $1,050.00 | $580.00 |
| 26 | (611.0151) | EACH | 3 | $1,040.00 | $1,300.00 | $1,000.00 | $1,050.00 | $1,200.00 |
| 27 | (611.19010024) | 3 | $470.00 | $135.00 | $167.00 | $160.00 | $545.00 | |
| 28 | (614.060104) | EACH | 3 | $3,000.00 | $2,100.00 | $1,500.00 | $2,300.00 | $980.00 |
| 29 | (617.11000024) | LS | 1 | $6,500.00 | $2,000.00 | $1,000.00 | $3,000.00 | $3,200.00 |
| 30 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $192,000 | $323,000 | $400,000 | $55,000 | $563,945 |
| 31 | (619.0901) | LF | 8,115 | $0.50 | $0.38 | $0.30 | $0.34 | $0.62 |
| 32 | (619.110513) | EACH | 2 | $6,000.00 | $7,500.00 | $11,500 | $11,000 | $9,650.00 |
| 33 | Survey Operations (625.01) | LS | 1 | $15,000 | $40,000 | $23,000 | $65,000 | $15,400 |
| 34 | (627.50140008) | 2,346 | $3.50 | $5.00 | $7.40 | $7.20 | $6.25 | |
| 35 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $2,500.00 | $3,300.00 | $3,500.00 | $4,000.00 | $4,850.00 |
| 36 | Office Technology and Supplies (637.34) | DOL | 5,001 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 37 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 42 | $45.25 | $56.00 | $45.25 | $50.00 | $52.50 |
| 38 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 411 | $44.00 | $56.00 | $44.75 | $50.00 | $51.50 |
| 39 | Type A Sign Posts (645.81) | EACH | 96 | $260.00 | $310.00 | $260.00 | $275.00 | $300.00 |
| 40 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 20 | $200.00 | $250.00 | $200.00 | $220.00 | $230.00 |
| 41 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 60 | $40.00 | $50.00 | $40.00 | $119.00 | $46.00 |
| 42 | (655.05020010) | 10 | $1,000.00 | $3,600.00 | $2,300.00 | $1,700.00 | $2,650.00 | |
| 43 | Manhole Frame & Cover (655.1202) | EACH | 10 | $1,000.00 | $2,500.00 | $1,200.00 | $1,700.00 | $1,700.00 |
| 44 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 34 | $1,500.00 | $3,600.00 | $2,500.00 | $2,150.00 | $2,650.00 |
| 45 | (662.60030008) | 1 | $1,100.00 | $871.76 | $1,000.00 | $630.00 | $1,050.00 | |
| 46 | Adjust Existing Valve Box Elevation (663.33) | EACH | 44 | $350.00 | $300.00 | $400.00 | $630.00 | $265.00 |
| 47 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 8,786 | $2.00 | $1.10 | $0.87 | $1.00 | $2.20 |
| 48 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 7,534 | $2.00 | $1.10 | $0.87 | $1.00 | $2.20 |
| 49 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 11,971 | $3.60 | $3.10 | $2.50 | $2.75 | $4.40 |
| 50 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 2,591 | $3.00 | $3.10 | $2.50 | $2.75 | $3.70 |
| 51 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 24 | $225.00 | $320.00 | $275.00 | $300.00 | $275.00 |
| 52 | Field Change Payment (FCP) (697.03) | DOL | 60,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Asphalt Price Adjustment (698.04) | DOL | 307.63 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Fuel Price Adjustment (698.05) | DOL | 187.71 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 55 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 56 | Mobilization (699.040001) | LS | 1 | $50,000 | $72,000 | $75,000 | $65,000 | $85,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 15, 2026. Compiled by Mirage Metrics.