NYSDOT contract D265805 bid tabulation
ROUTE 5S & 30A MONTGOMERY COUNTY PAVING REHABILITATION. Let by New York State DOT on June 25, 2026, Montgomery, Region 02. 4 bids received; low bid $4,988,888 by Peter Luizzi & Bros Contracting Inc.
- Owner
- New York State DOT
- Letting
- 25 JUN 2026
- Pay items
- 112
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Luizzi & Bros Contracting Inc | $4,988,888 | Low |
| 2 | Callanan Industries Inc | $5,403,824 | +8.0% |
| 3 | Cobleskill Stone Products Inc. | $5,437,579 | +9.0% |
| 4 | Lancaster Development and Tully Construction Co LLC | $5,769,549 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Luizzi & Bros Contracting Inc | 2. Callanan Industries Inc | 3. Cobleskill Stone Products Inc. | 4. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 344 | $100.00 | $140.00 | $140.00 | $87.70 |
| 2 | Embankment In Place (203.03) | CY | 259 | $50.00 | $80.00 | $98.00 | $102.00 |
| 3 | Select Granular Fill (203.07) | CY | 120 | $50.00 | $240.00 | $118.00 | $101.00 |
| 4 | Select Structural Fill (203.21) | CY | 5 | $100.00 | $500.00 | $375.00 | $120.00 |
| 5 | (203.24010017) | 212 | $80.00 | $180.00 | $92.00 | $136.00 | |
| 6 | Structure Excavation (206.01) | CY | 370 | $55.00 | $55.00 | $109.50 | $69.10 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 141 | $55.00 | $220.00 | $105.50 | $92.90 |
| 8 | Seed and Mulch – Temporary (209.1003) | SY | 7,366 | $1.00 | $3.00 | $2.40 | $2.45 |
| 9 | Silt Fence - Temporary (209.13) | LF | 300 | $1.00 | $14.00 | $21.00 | $31.10 |
| 10 | (209.23010009) | 554 | $7.00 | $17.00 | $16.85 | $20.80 | |
| 11 | Subbase Course, Type 2 (304.12) | CY | 200 | $200.00 | $250.00 | $144.00 | $169.00 |
| 12 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 | $105.00 |
| 13 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 134 | $105.00 | $105.00 | $105.00 | $105.00 |
| 14 | (404.0589) | TON | 1,891 | $150.00 | $145.00 | $166.00 | $230.00 |
| 15 | (404.0681) | TON | 2,048 | $150.00 | $145.00 | $130.60 | $163.00 |
| 16 | (404.0962) | TON | 4,978 | $135.00 | $145.00 | $129.50 | $146.00 |
| 17 | (404.1262) | TON | 2,206 | $135.00 | $145.00 | $114.75 | $146.00 |
| 18 | (404.1989) | TON | 27 | $400.00 | $800.00 | $214.50 | $374.00 |
| 19 | (404.2589) | TON | 132 | $200.00 | $400.00 | $191.25 | $236.00 |
| 20 | Straight Tack Coat (407.0103) | GAL | 6,023 | $9.00 | $9.00 | $7.10 | $13.20 |
| 21 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 85,344 | $0.75 | $0.50 | $0.48 | $1.15 |
| 22 | (490.17011018) | 63,835 | $4.55 | $4.00 | $6.35 | $4.35 | |
| 23 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 143 | $75.00 | $60.00 | $35.00 | $159.00 |
| 24 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 32 | $900.00 | $700.00 | $1,050.00 | $1,340.00 |
| 25 | (520.09000010) | 60 | $10.00 | $15.00 | $7.75 | $13.80 | |
| 26 | (520.60900002) | 30 | $10.00 | $120.00 | $99.00 | $21.70 | |
| 27 | Shields and Shoring (552.17) | SF | 335 | $1.00 | $10.00 | $5.00 | $1.25 |
| 28 | (553.030001) | EACH | 1 | $50,000 | $20,000 | $16,000 | $25,000 |
| 29 | (553.030002) | EACH | 1 | $50,000 | $20,000 | $16,000 | $25,000 |
| 30 | Concrete for Structures, Performance (555.0021) | CY | 48 | $2,500.00 | $2,800.00 | $2,500.00 | $3,150.00 |
| 31 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 | $12.50 |
| 32 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 3,598 | $4.00 | $5.00 | $3.10 | $6.65 |
| 33 | Protective Sealing of New Structural Concrete (559.02) | SF | 567 | $2.00 | $2.00 | $4.90 | $7.05 |
| 34 | (559.16960025) | 700 | $3.50 | $2.00 | $7.80 | $5.95 | |
| 35 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 96 | $300.00 | $266.00 | $310.00 | $401.00 |
| 36 | Transition Bridge Railing (568.70) | LF | 128 | $250.00 | $195.00 | $205.00 | $285.00 |
| 37 | Removal of Structural Concrete (580.01) | CY | 1 | $10,000 | $10,000 | $5,635.00 | $9,330.00 |
| 38 | Removal and Replacement of Structural Concrete (582.0051) | CY | 1 | $7,500.00 | $12,000 | $11,000 | $11,900 |
| 39 | Removal and Replacement of Structural Concrete (582.0052) | SF | 2 | $2,000.00 | $1,800.00 | $5,765.00 | $6,500.00 |
| 40 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 193 | $50.00 | $45.00 | $109.00 | $84.60 |
| 41 | Bridge Railing Removal and Disposal (587.01) | LF | 96 | $50.00 | $20.00 | $60.00 | $29.30 |
| 42 | Culvert-End Safety Grate (603.0101) | SF | 518 | $95.00 | $140.00 | $53.00 | $105.00 |
| 43 | (603.6005) | LF | 19 | $700.00 | $1,100.00 | $555.00 | $199.00 |
| 44 | (603.7305) | EACH | 3 | $3,500.00 | $7,500.00 | $6,345.00 | $5,360.00 |
| 45 | Concrete Collars (603.77) | EACH | 6 | $3,000.00 | $5,000.00 | $6,615.00 | $5,900.00 |
| 46 | (603.9860) | LF | 46 | $1,200.00 | $500.00 | $325.00 | $404.00 |
| 47 | (604.070201) | EACH | 9 | $2,100.00 | $2,000.00 | $5,175.00 | $1,700.00 |
| 48 | (604.070202) | EACH | 4 | $3,000.00 | $4,000.00 | $5,350.00 | $6,610.00 |
| 49 | Box Beam Guide Railing (606.10) | LF | 2,406 | $55.00 | $53.00 | $56.00 | $59.50 |
| 50 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 120 | $65.00 | $58.00 | $61.00 | $73.40 |
| 51 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 8 | $5,000.00 | $4,500.00 | $4,750.00 | $5,570.00 |
| 52 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 4 | $5,500.00 | $5,850.00 | $6,100.00 | $6,450.00 |
| 53 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,500.00 | $2,250.00 | $2,400.00 | $3,040.00 |
| 54 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 3,086 | $5.50 | $5.00 | $5.25 | $9.75 |
| 55 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 7 | $200.00 | $185.00 | $195.00 | $627.00 |
| 56 | (608.01030008) | 322 | $300.00 | $400.00 | $625.00 | $491.00 | |
| 57 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 75 | $450.00 | $350.00 | $310.00 | $341.00 |
| 58 | (608.03040008) | 69 | $300.00 | $275.00 | $410.00 | $516.00 | |
| 59 | (608.21000003) | 30 | $400.00 | $300.00 | $425.00 | $512.00 | |
| 60 | (609.0401) | LF | 571 | $100.00 | $110.00 | $118.00 | $164.00 |
| 61 | Topsoil - Roadside (610.1402) | CY | 5 | $500.00 | $900.00 | $166.00 | $475.00 |
| 62 | Turf Establishment -Lawns (610.1602) | SY | 26 | $1.00 | $400.00 | $74.00 | $117.00 |
| 63 | Turf Establishment – Performance (610.1605) | SY | 922 | $1.00 | $40.00 | $11.15 | $60.70 |
| 64 | (617.10000024) | 30 | $50.00 | $100.00 | $275.00 | $122.00 | |
| 65 | (617.11000024) | LS | 1 | $10,000 | $2,000.00 | $2,200.00 | $828.00 |
| 66 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $589,935 | $925,000 | $867,000 | $331,000 |
| 67 | Type III Construction Barricades (619.04) | EACH | 6 | $300.00 | $600.00 | $115.00 | $224.00 |
| 68 | (619.0901) | LF | 75,000 | $0.40 | $0.38 | $0.40 | $0.48 |
| 69 | (619.110513) | EACH | 5 | $12,000 | $4,800.00 | $23,900 | $10,800 |
| 70 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $100.00 | $22.00 | $119.00 | $145.00 |
| 71 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 600 | $100.00 | $40.00 | $108.00 | $168.00 |
| 72 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 20 | $90.00 | $75.00 | $50.00 | $99.30 |
| 73 | Pavement Patching (Tonnage) (619.2602) | TON | 40 | $300.00 | $420.00 | $550.00 | $557.00 |
| 74 | Stone Filling (Light) (620.03) | CY | 61 | $180.00 | $275.00 | $195.00 | $215.00 |
| 75 | Bedding Material, Type 1 (620.0801) | CY | 11 | $160.00 | $275.00 | $268.00 | $231.00 |
| 76 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 818 | $30.00 | $20.00 | $21.60 | $28.00 |
| 77 | Cleaning Closed Drainage Systems (621.03) | LF | 2,390 | $20.00 | $10.50 | $18.60 | $15.60 |
| 78 | Cleaning Drainage Structures (621.04) | EACH | 33 | $450.00 | $575.00 | $465.00 | $901.00 |
| 79 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 693 | $9.00 | $45.00 | $17.70 | $37.20 |
| 80 | (621.51000015) | 5,616 | $10.00 | $15.00 | $13.00 | $35.20 | |
| 81 | (621.51950006) | 180 | $12.00 | $30.00 | $15.50 | $6.65 | |
| 82 | Survey Operations (625.01) | LS | 1 | $50,000 | $35,000 | $44,300 | $139,105 |
| 83 | (627.50140008) | 2,148 | $5.00 | $5.50 | $6.45 | $12.40 | |
| 84 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $2,000.00 | $2,500.00 | $4,240.00 |
| 85 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $5,000.00 | $3,500.00 | $2,600.00 | $7,000.00 |
| 86 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 87 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,538 | $50.00 | $43.25 | $45.00 | $56.90 |
| 88 | Type A Sign Posts (645.81) | EACH | 236 | $250.00 | $225.00 | $240.00 | $287.00 |
| 89 | (645.81090003) | 40 | $55.00 | $64.50 | $68.00 | $63.30 | |
| 90 | (645.830202) | EACH | 8 | $3,000.00 | $3,825.00 | $4,000.00 | $3,360.00 |
| 91 | Reference Marker Panel (646.21) | EACH | 59 | $35.00 | $45.75 | $48.35 | $39.20 |
| 92 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 87 | $20.00 | $26.00 | $27.50 | $22.80 |
| 93 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 1 | $50.00 | $60.75 | $64.00 | $32.90 |
| 94 | Steel Post, 1.1 lb/ft (646.31) | EACH | 65 | $55.00 | $87.00 | $92.00 | $63.30 |
| 95 | Steel Post, 2.0 lb/ft (646.32) | EACH | 48 | $75.00 | $105.00 | $111.00 | $82.20 |
| 96 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 11 | $250.00 | $205.00 | $215.00 | $276.00 |
| 97 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 214 | $75.00 | $40.00 | $42.25 | $82.20 |
| 98 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 8 | $400.00 | $675.00 | $714.00 | $417.00 |
| 99 | (647.83001002) | 59 | $40.00 | $10.00 | $10.50 | $43.00 | |
| 100 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 23,315 | $1.00 | $1.00 | $0.52 | $0.62 |
| 101 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 8 | $3,500.00 | $4,000.00 | $2,720.00 | $6,310.00 |
| 102 | Adjust Existing Valve Box Elevation (663.33) | EACH | 6 | $500.00 | $500.00 | $453.25 | $581.00 |
| 103 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 70,200 | $0.70 | $0.42 | $0.49 | $0.53 |
| 104 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 40,501 | $0.70 | $0.42 | $0.49 | $0.53 |
| 105 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 6,964 | $3.00 | $3.75 | $4.35 | $4.75 |
| 106 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 582 | $2.00 | $3.75 | $8.85 | $4.75 |
| 107 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 2 | $225.00 | $390.00 | $1,800.00 | $493.00 |
| 108 | Field Change Payment (FCP) (697.03) | DOL | 176,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 109 | Asphalt Price Adjustment (698.04) | DOL | 3,226.71 | $1.00 | $1.00 | $1.00 | $1.00 |
| 110 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 111 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 112 | Mobilization (699.040001) | LS | 1 | $190,000 | $195,000 | $200,000 | $221,372 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.