Cobleskill Stone Products Inc.: NYSDOT bid record
Cobleskill Stone Products Inc. submitted 21 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 25 JUN 2026, and was the low bidder on 11 of them (52%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $66,207,422
- Latest bid
- 25 JUN 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 4 | 50% |
| 2023 | 2 | 0 | 0% |
| 2024 | 3 | 2 | 67% |
| 2025 | 3 | 1 | 33% |
| 2026 | 5 | 4 | 80% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 14 | 11 | 79% |
| Region 02 | 7 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Engineer’s Field Office – Type 2 | 637.12 | MONTH | 10 | 6 (60%) | $2,600.00 | $2,500.00 |
| Stone Filling (Light) | 620.03 | CY | 9 | 6 (67%) | $90.00 | $163.00 |
| 691.04000020 | 6 | 6 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 6 | 6 (100%) | $77.50 | $90.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 15 | 5 (33%) | $0.55 | $1.00 |
| 404.0001 | TON | 5 | 5 (100%) | $90.00 | $95.00 | |
| Unclassified Excavation and Disposal | 203.02 | CY | 14 | 4 (29%) | $33.00 | $71.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lancaster Development and Tully Construction Co LLC | 8 | 2 of 8 |
| Bothar Construction LLC | 6 | 4 of 6 |
| Heidelberg Materials Northeast-Ny LLC | 4 | 2 of 4 |
| Cci Companies Inc | 2 | 1 of 2 |
| Rifenburg Construction Inc | 2 | 1 of 2 |
| Callanan Industries Inc | 2 | 1 of 2 |
| Hanson Aggregates New York LLC | 2 | 2 of 2 |
| Dolomite Products Co Inc/DBA A L Blades | 2 | 1 of 2 |
| Maple Ridge Organics LLC | 2 | 0 of 2 |
| Marcy Excavation Services LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 JUN 2026 | D265805 | Region 02 | ROUTE 5S & 30A MONTGOMERY COUNTY PAVING REHABILITATION | 3 of 4 | $5,437,579 | +9.0% |
| 26 MAR 2026 | D265744 | Region 09 | PAVEMENT MAINTENANCE - Various Locations. | 1 of 2 | $14,995,417 | Low, 26% under the second |
| 05 FEB 2026 | D265667 | Region 09 | JOC Highway/Drainage Combined, Chenango and Otsego Counties | 1 of 3 | $852,238 | Low, 26% under the second |
| 05 FEB 2026 | D265668 | Region 09 | JOC Highway/Drainage Combined, Delaware and Schoharie. | 1 of 2 | $852,652 | Low, 38% under the second |
| 05 FEB 2026 | D265670 | Region 09 | JOC Highway/Drainage Combined, Sullivan County | 1 of 1 | $463,994 | Low |
| 18 DEC 2025 | D265618 | Region 02 | RESURFACING PAVEMENT PROJECT - Rte 5, TOWN OF PALATINE | 2 of 2 | $1,692,473 | +20% |
| 27 MAR 2025 | D265446 | Region 09 | I88 RESURFACING AND JOINT REPAIRS | 1 of 3 | $13,266,234 | Low, 9.0% under the second |
| 27 FEB 2025 | D265417 | Region 02 | PAVEMENT REHABILITATION - Rt 67: Rt. 5 to Rt. 10 | 2 of 2 | $6,053,465 | +22% |
| 08 AUG 2024 | D265289 | Region 09 | I88 - REST AREA TRUCK PARKING EXPANSION | 1 of 3 | $2,311,619 | Low, 5.0% under the second |
| 23 MAY 2024 | D265260 | Region 02 | ROUTES 5S AND 920T PAVEMENT REHABILITATION PROJECT | 3 of 3 | $1,498,247 | +51% |
| 08 FEB 2024 | D265154 | Region 09 | I-88 Crack and Seat, Exit 18 to 19, Otsego County | 1 of 3 | $21,767,702 | Low, 13% under the second |
| 30 NOV 2023 | D265131 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT HERKIMER COUNTY | 7 of 9 | $1,242,839 | +27% |
| 19 JAN 2023 | D264940 | Region 02 | Route 5S Corridor Improvements | 4 of 4 | $7,868,601 | +28% |
| 15 DEC 2022 | D264811 | Region 09 | 9ADA20 - ADA ACCESSIBILITY PROJECT | 2 of 3 | $3,088,489 | +27% |
| 20 OCT 2022 | D264868 | Region 09 | RT 97 SLOPE STABILIZATION | 4 of 4 | $5,562,384 | +69% |
| 19 MAY 2022 | D264780 | Region 09 | JOC- FOR HIGHWAY & DRAINAGE WORK IN PART OF NYSDOT REGION 9 | 1 of 1 | $909,640 | Low |
| 21 APR 2022 | D264783 | Region 09 | Sullivan, JOC - HIGHWAY/DRAINAGE COMBINED, Various Locations | 1 of 1 | $475,135 | Low |
| 07 APR 2022 | D264777 | Region 09 | JOC - HIGHWAY/DRAINAGE COMBINED | 1 of 1 | $790,991 | Low |
| 24 MAR 2022 | D264744 | Region 02 | ROUTE 162 PAVEMENT REHABILATION: | 2 of 4 | $10,999,644 | +4.0% |
| 03 FEB 2022 | D264718 | Region 09 | MILLING AND RESURFACING I-88, Near exit 23 | 1 of 3 | $9,521,801 | Low, 14% under the second |
| 06 JAN 2022 | D264693 | Region 09 | ROUTE 28, SHOULDER WIDENING And Safety Improvements | 5 of 5 | $3,263,442 | +37% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.