NYSDOT contract D265446 bid tabulation
I88 RESURFACING AND JOINT REPAIRS. Let by New York State DOT on March 27, 2025, Schoharie, Region 09. 3 bids received; low bid $13,266,234 by Cobleskill Stone Products Inc..
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 77
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cobleskill Stone Products Inc. | $13,266,234 | Low |
| 2 | Heidelberg Materials Northeast-Ny LLC | $14,489,851 | +9.0% |
| 3 | Lancaster Development and Tully Construction Co LLC | $16,451,125 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cobleskill Stone Products Inc. | 2. Heidelberg Materials Northeast-Ny LLC | 3. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 2,909 | $21.00 | $53.00 | $80.70 |
| 2 | (203.24010017) | 5,835 | $29.75 | $34.00 | $10.00 | |
| 3 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 150 | $46.25 | $37.23 | $35.50 |
| 4 | (304.00010018) | 67,345 | $0.45 | $0.41 | $0.92 | |
| 5 | Subbase Course, Optional Type (304.15) | CY | 247 | $67.45 | $63.00 | $85.40 |
| 6 | (404.0001) | TON | 2,349.39 | $90.00 | $90.00 | $90.00 |
| 7 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1,784.93 | $90.00 | $90.00 | $90.00 |
| 8 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 440 | $90.00 | $90.00 | $90.00 |
| 9 | (404.0589) | TON | 10,542 | $77.00 | $100.00 | $125.00 |
| 10 | (404.1989) | TON | 1,263 | $92.65 | $132.00 | $164.00 |
| 11 | (404.2589) | TON | 2,101 | $98.95 | $116.00 | $131.00 |
| 12 | (406.1252) | TON | 35,699 | $85.00 | $96.50 | $100.00 |
| 13 | (407.01040009) | 61,217 | $4.30 | $2.95 | $1.00 | |
| 14 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 330,488 | $0.55 | $0.30 | $0.01 |
| 15 | (490.17011018) | 19,293 | $3.35 | $2.85 | $5.00 | |
| 16 | Box Beam Guide Railing (606.10) | LF | 21,118 | $43.30 | $40.25 | $48.50 |
| 17 | Box Beam Median Barrier (606.11) | LF | 16,509 | $63.00 | $59.75 | $70.70 |
| 18 | Box Beam End Piece (606.120101) | EACH | 9 | $755.00 | $700.00 | $846.00 |
| 19 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $5,175.00 | $4,500.00 | $6,000.00 |
| 20 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 11 | $5,775.00 | $5,100.00 | $5,500.00 |
| 21 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 7 | $9,050.00 | $7,850.00 | $9,890.00 |
| 22 | Resetting Box Beam Median Barrier (New Posts) (606.5448) | LF | 1,474 | $39.00 | $35.00 | $41.40 |
| 23 | Removing and Disposing Cable Guide Railing (606.70) | LF | 20,813 | $2.90 | $2.75 | $3.25 |
| 24 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 3,231 | $3.15 | $3.00 | $3.55 |
| 25 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 34 | $530.00 | $500.00 | $592.00 |
| 26 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 23 | $158.00 | $150.00 | $178.00 |
| 27 | (606.85020001) | 12 | $790.00 | $700.00 | $888.00 | |
| 28 | Concrete Sidewalks and Driveways (608.0101) | CY | 1 | $2,500.00 | $2,150.00 | $6,400.00 |
| 29 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $163,000 | $700,000 | $919,000 |
| 30 | (619.0901) | LF | 150,696 | $0.32 | $0.30 | $0.36 |
| 31 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 24 | $158.00 | $200.00 | $178.00 |
| 32 | Survey Operations (625.01) | LS | 1 | $10,500 | $30,000 | $169,996 |
| 33 | (625.09010015) | LS | 1 | $1,000.00 | $2,500.00 | $8,690.00 |
| 34 | Stress Relieving Pavement Repairs (633.16) | SY | 30,000 | $103.50 | $104.50 | $126.00 |
| 35 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,500.00 | $2,000.00 | $3,820.00 |
| 36 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $2,300.00 | $3,000.00 | $7,010.00 |
| 37 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 |
| 38 | (637.41000115) | 24 | $65.50 | $105.00 | $118.00 | |
| 39 | (637.41000215) | 24 | $65.50 | $105.00 | $118.00 | |
| 40 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 14 | $42.50 | $40.00 | $47.70 |
| 41 | Type A Sign Posts (645.81) | EACH | 2 | $211.00 | $200.00 | $10,000 |
| 42 | (645.830701) | EACH | 2 | $8,675.00 | $8,220.00 | $538.00 |
| 43 | Reference Marker Panel (646.21) | EACH | 108 | $46.50 | $43.75 | $52.10 |
| 44 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 857 | $31.65 | $29.00 | $35.50 |
| 45 | Steel Post, 2.0 lb/ft (646.32) | EACH | 725 | $81.50 | $74.25 | $91.50 |
| 46 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 2 | $26.50 | $25.00 | $29.60 |
| 47 | (647.83001002) | 693 | $13.75 | $13.00 | $15.40 | |
| 48 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 116,704 | $0.29 | $0.15 | $0.46 |
| 49 | Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020) | QUALITY UNIT | 848 | $90.00 | $90.00 | $90.00 |
| 50 | (662.60010004) | 1,500 | $1.00 | $1.00 | $1.00 | |
| 51 | Pole Excavation and Concrete Foundation (680.5001) | CY | 1.20 | $3,535.00 | $2,508.00 | $3,970.00 |
| 52 | (680.510501) | EACH | 3 | $1,525.00 | $2,118.00 | $1,710.00 |
| 53 | (680.520106) | LF | 250 | $16.35 | $16.02 | $18.40 |
| 54 | (680.520204) | LF | 60 | $15.85 | $9.73 | $17.80 |
| 55 | Conduit Jacking or Boring (680.53) | LF | 150 | $52.75 | $98.00 | $59.20 |
| 56 | (680.70070010) | 1 | $1,690.00 | $5,838.00 | $1,890.00 | |
| 57 | (680.77000001) | LS | 1 | $2,325.00 | $2,160.00 | $2,600.00 |
| 58 | Breakaway Transformer Base (680.8223) | EACH | 1 | $910.00 | $1,122.00 | $1,020.00 |
| 59 | (680.90920008) | 1 | $885.00 | $602.00 | $994.00 | |
| 60 | Watertight Disconnect Box (680.9401) | EACH | 2 | $425.00 | $1,331.00 | $474.00 |
| 61 | Ground Wire (680.9403) | LF | 400 | $2.65 | $2.61 | $2.95 |
| 62 | (680.950106) | LF | 400 | $4.85 | $3.46 | $5.45 |
| 63 | (680.95110009) | 1 | $1,575.00 | $578.00 | $1,760.00 | |
| 64 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $11.56 | $11.56 | $11.56 |
| 65 | (683.06010013) | 1 | $6,125.00 | $7,141.00 | $6,870.00 | |
| 66 | (683.17002211) | 1 | $7,285.00 | $12,272 | $8,170.00 | |
| 67 | (683.93090104) | 2 | $67,000 | $88,158 | $75,200 | |
| 68 | (685.16010014) | 137,573 | $1.25 | $1.19 | $1.40 | |
| 69 | (685.17010014) | 108,762 | $1.25 | $1.19 | $1.40 | |
| 70 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 20,968 | $3.15 | $2.99 | $3.55 |
| 71 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 8 | $79.15 | $75.00 | $88.80 |
| 72 | (691.04000020) | 105,000 | $1.00 | $1.00 | $1.00 | |
| 73 | Field Change Payment (FCP) (697.03) | DOL | 720,000 | $1.00 | $1.00 | $1.00 |
| 74 | Asphalt Price Adjustment (698.04) | DOL | 124,277.08 | $1.00 | $1.00 | $1.00 |
| 75 | Fuel Price Adjustment (698.05) | DOL | 25,414 | $1.00 | $1.00 | $1.00 |
| 76 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 77 | Mobilization (699.040001) | LS | 1 | $475,270 | $550,000 | $631,214 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.