NYSDOT contract D265582 bid tabulation
Drainage Repair and Resurfacing - Route 5 (Central Ave). Let by New York State DOT on October 23, 2025, Albany, Schenectady, Region 01. 3 bids received; low bid $6,060,961 by Peter Luizzi & Bros Contracting Inc.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 95
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Luizzi & Bros Contracting Inc | $6,060,961 | Low |
| 2 | Callanan Industries Inc | $7,226,241 | +19% |
| 3 | Rifenburg Construction Inc | $8,161,115 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Luizzi & Bros Contracting Inc | 2. Callanan Industries Inc | 3. Rifenburg Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 474 | $95.00 | $225.00 | $111.00 |
| 2 | Embankment In Place (203.03) | CY | 115 | $51.00 | $200.00 | $29.00 |
| 3 | Select Granular Fill (203.07) | CY | 700 | $34.00 | $300.00 | $57.25 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 1,260 | $40.00 | $250.00 | $96.00 |
| 5 | Test Pit Excavation (206.05) | EACH | 19 | $1,150.00 | $1,400.00 | $1,125.00 |
| 6 | Subbase Course, Type 2 (304.12) | CY | 563 | $150.00 | $275.00 | $167.00 |
| 7 | (404.0001) | TON | 780 | $95.00 | $95.00 | $95.00 |
| 8 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 770 | $95.00 | $95.00 | $95.00 |
| 9 | (404.0962) | TON | 15,000 | $103.00 | $90.00 | $118.50 |
| 10 | (404.1989) | TON | 230 | $243.00 | $285.00 | $201.25 |
| 11 | (404.3789) | TON | 375 | $220.00 | $285.00 | $197.00 |
| 12 | Straight Tack Coat (407.0103) | GAL | 8,000 | $7.00 | $6.00 | $3.00 |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 99,736 | $0.55 | $0.48 | $0.60 |
| 14 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 133,000 | $3.00 | $2.00 | $2.40 |
| 15 | (603.6001) | LF | 315 | $208.00 | $160.00 | $390.25 |
| 16 | (603.6002) | LF | 25 | $208.00 | $165.00 | $405.00 |
| 17 | (603.6003) | LF | 20 | $208.00 | $170.00 | $410.50 |
| 18 | (603.6004) | LF | 15 | $250.00 | $175.00 | $405.00 |
| 19 | Concrete Collars (603.77) | EACH | 118 | $1,520.00 | $1,500.00 | $2,615.00 |
| 20 | (603.9812) | LF | 100 | $100.00 | $160.00 | $345.00 |
| 21 | (603.9815) | LF | 35 | $100.00 | $165.00 | $356.00 |
| 22 | (604.070101) | EACH | 2 | $1,900.00 | $1,400.00 | $5,210.00 |
| 23 | (604.070102) | EACH | 17 | $1,900.00 | $1,700.00 | $6,100.00 |
| 24 | (604.070103) | EACH | 4 | $1,900.00 | $3,000.00 | $8,610.00 |
| 25 | (604.070104) | EACH | 3 | $1,900.00 | $3,500.00 | $12,905 |
| 26 | (604.070105) | EACH | 33 | $1,900.00 | $3,150.00 | $5,825.00 |
| 27 | (604.070106) | EACH | 1 | $1,900.00 | $2,600.00 | $10,225 |
| 28 | (604.070107) | EACH | 13 | $1,900.00 | $2,150.00 | $5,450.00 |
| 29 | (604.070108) | EACH | 8 | $1,900.00 | $2,600.00 | $13,100 |
| 30 | (604.300606) | LF | 104 | $1,430.00 | $1,375.00 | $1,900.00 |
| 31 | (604.300671) | LF | 264 | $1,430.00 | $1,300.00 | $1,850.00 |
| 32 | (604.4048) | LF | 67 | $950.00 | $900.00 | $1,115.00 |
| 33 | (604.4084) | LF | 7 | $1,920.00 | $2,300.00 | $7,080.00 |
| 34 | (604.500101) | LF | 8 | $1,000.00 | $2,700.00 | $11,250 |
| 35 | (604.500102) | LF | 9 | $1,000.00 | $2,250.00 | $5,825.00 |
| 36 | (605.1701) | LF | 190 | $20.00 | $10.00 | $14.25 |
| 37 | (605.1702) | LF | 20 | $28.00 | $12.00 | $27.25 |
| 38 | (605.1703) | LF | 5 | $55.00 | $40.00 | $56.50 |
| 39 | (605.1704) | LF | 10 | $60.00 | $40.00 | $40.00 |
| 40 | Box Beam End Piece (606.120101) | EACH | 4 | $1,300.00 | $1,115.00 | $1,115.00 |
| 41 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 114 | $95.00 | $81.50 | $81.50 |
| 42 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 2 | $95.00 | $95.00 | $95.00 |
| 43 | Concrete Sidewalks and Driveways (608.0101) | CY | 120 | $1,380.00 | $2,100.00 | $1,750.00 |
| 44 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 35 | $340.00 | $298.37 | $340.00 |
| 45 | (608.21000003) | 115 | $450.00 | $620.00 | $441.00 | |
| 46 | (609.0401) | LF | 1,862 | $90.00 | $195.00 | $92.00 |
| 47 | Topsoil - Roadside (610.1402) | CY | 8 | $118.00 | $200.00 | $187.00 |
| 48 | Turf Establishment - Roadside (610.1601) | SY | 69 | $4.00 | $6.00 | $2.50 |
| 49 | Turf Establishment – Performance (610.1605) | SY | 100 | $14.00 | $27.00 | $80.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $380,000 | $950,000 | $1,048,772 |
| 51 | Type III Construction Barricades (619.04) | EACH | 85 | $130.00 | $275.00 | $78.00 |
| 52 | (619.111113) | EACH | 2 | $12,000 | $14,000 | $11,500 |
| 53 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 5 | $100.00 | $85.00 | $85.00 |
| 54 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $80,000 | $2,500.00 | $150,000 |
| 55 | Traffic Control Supervisor (619.25) | MONTH | 19 | $1,400.00 | $1,000.00 | $100.00 |
| 56 | Pavement Patching (Force Acount) (619.2601) | DOL | 6,000 | $1.00 | $1.00 | $1.00 |
| 57 | Pavement Patching (Tonnage) (619.2602) | TON | 18 | $300.00 | $683.74 | $1,050.00 |
| 58 | Cleaning Drainage Structures (621.04) | EACH | 137 | $320.00 | $350.00 | $420.00 |
| 59 | Survey Operations (625.01) | LS | 1 | $40,000 | $7,500.00 | $75,000 |
| 60 | (625.09010015) | LS | 1 | $4,000.00 | $2,500.00 | $20,000 |
| 61 | (627.50140008) | 9,294 | $4.10 | $11.45 | $4.50 | |
| 62 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 283 | $85.00 | $126.99 | $142.00 |
| 63 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 94 | $85.00 | $108.34 | $122.00 |
| 64 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 20 | $85.00 | $73.74 | $109.00 |
| 65 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 70 | $100.00 | $18.46 | $150.00 |
| 66 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 19 | $2,500.00 | $3,500.00 | $3,000.00 |
| 67 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 68 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 69 | (637.41000115) | 19 | $130.00 | $150.00 | $400.00 | |
| 70 | (637.41000215) | 19 | $130.00 | $150.00 | $400.00 | |
| 71 | (637.41000315) | 19 | $130.00 | $150.00 | $400.00 | |
| 72 | (637.41000415) | 19 | $130.00 | $150.00 | $400.00 | |
| 73 | Type A Sign Posts (645.81) | EACH | 5 | $415.00 | $350.00 | $350.00 |
| 74 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 7 | $205.00 | $175.00 | $175.00 |
| 75 | Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704) | EACH | 46 | $2,400.00 | $2,800.00 | $2,000.00 |
| 76 | Welded Frame & Reticuline Grate 6 (655.1106) | EACH | 24 | $1,730.00 | $1,800.00 | $1,200.00 |
| 77 | Manhole Frame & Grate (655.1201) | EACH | 2 | $1,950.00 | $1,700.00 | $1,300.00 |
| 78 | Manhole Frame & Cover (655.1202) | EACH | 19 | $1,500.00 | $1,600.00 | $1,275.00 |
| 79 | (680.05010007) | 3 | $25,000 | $22,360 | $22,360 | |
| 80 | (680.05020007) | 6 | $3,900.00 | $3,490.00 | $3,490.00 | |
| 81 | (680.80324515) | 3 | $3,500.00 | $2,975.00 | $2,975.00 | |
| 82 | (680.82250601) | 1 | $1,050.00 | $875.00 | $875.00 | |
| 83 | (680.82250701) | 2 | $1,050.00 | $875.00 | $875.00 | |
| 84 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 5,449 | $1.20 | $1.25 | $1.00 |
| 85 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 37,350 | $1.20 | $0.95 | $1.00 |
| 86 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 26,485 | $3.80 | $1.75 | $3.59 |
| 87 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 637 | $3.50 | $1.75 | $3.00 |
| 88 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 24 | $90.00 | $74.00 | $75.00 |
| 89 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 159 | $270.00 | $150.00 | $225.00 |
| 90 | (691.04000020) | 42,000 | $1.00 | $1.00 | $1.00 | |
| 91 | Field Change Payment (FCP) (697.03) | DOL | 470,000 | $1.00 | $1.00 | $1.00 |
| 92 | Asphalt Price Adjustment (698.04) | DOL | 24,817 | $1.00 | $1.00 | $1.00 |
| 93 | Fuel Price Adjustment (698.05) | DOL | 7,607 | $1.00 | $1.00 | $1.00 |
| 94 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 95 | Mobilization (699.040001) | LS | 1 | $220,000 | $265,000 | $313,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.