James H Maloy Inc: NYSDOT bid record
James H Maloy Inc submitted 16 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $3,827,000
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
| 2025 | 2 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 10 | 1 | 10% |
| Region 09 | 3 | 0 | 0% |
| Region 02 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 7 | 7 (100%) | $10.00 | $10.50 |
| Embankment In Place | 203.03 | CY | 14 | 6 (43%) | $28.50 | $43.11 |
| 607.41010010 | 12 | 6 (50%) | $5.25 | $7.15 | ||
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 6 | 6 (100%) | $77.50 | $90.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 5 | 5 (100%) | $1.00 | $1.00 |
| 404.0001 | TON | 5 | 5 (100%) | $80.00 | $95.00 | |
| Mailboxes | 619.27 | EACH | 7 | 4 (57%) | $320.00 | $325.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ing Civil Inc | 6 | 4 of 6 |
| Rifenburg Construction Inc | 5 | 3 of 5 |
| Slate Hill Constructors Inc | 4 | 3 of 4 |
| Winn Construction Services Inc | 4 | 4 of 4 |
| Harrison & Burrowes Bridge Constructors Inc | 4 | 3 of 4 |
| Vector Construction Corp | 3 | 2 of 3 |
| Tioga Construction Company Inc | 3 | 2 of 3 |
| D A Collins Construction Co Inc | 3 | 3 of 3 |
| Bothar Construction LLC | 3 | 3 of 3 |
| Rifenburg Contracting Corporation | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265829 | Region 09 | NYS Rte 51 (BIN 1026410) over Dunderberg Creek | 2 of 5 | $1,227,000 | +5.0% |
| 07 MAY 2026 | D265769 | Region 01 | Bridge Repair/Culvert Replacement SFY 27A | 4 of 5 | $14,497,000 | +6.0% |
| 27 MAR 2025 | D265319 | Region 01 | BRIDGE REPLACEMENT - US Route 9W over CSX Railroad | 2 of 3 | $16,934,000 | +3.0% |
| 23 JAN 2025 | D265369 | Region 09 | INTERSECTION RECONSTRUCTION - Routes 7 & 23 | 4 of 6 | $4,932,000 | +22% |
| 19 DEC 2024 | D265385 | Region 01 | BRIDGE REPLACEMENT - NY Rt 146 over Normans Kill | 2 of 3 | $9,727,000 | +10% |
| 21 NOV 2024 | D265328 | Region 01 | Culvert Repair / Replacement SFY 25 | 1 of 4 | $3,827,000 | Low, 8.0% under the second |
| 21 NOV 2024 | D265347 | Region 02 | Intersection improvement - RTE 67 AT CLIZBE AVENUE | 6 of 8 | $647,000 | +44% |
| 22 AUG 2024 | D265286 | Region 02 | BRIDGE REPLACEMENT - Route 29 over Caroga Creek | 7 of 7 | $2,615,000 | +29% |
| 25 JUL 2024 | D265277 | Region 01 | Replacement of Route 22 over White Creek | 3 of 3 | $4,568,000 | +31% |
| 15 JUN 2023 | D265049 | Region 01 | Bridge Where and When SFY 23 | 3 of 3 | $9,494,000 | +21% |
| 19 JAN 2023 | D264940 | Region 02 | Route 5S Corridor Improvements | 2 of 4 | $6,914,000 | +13% |
| 19 JAN 2023 | D264951 | Region 01 | Culvert Replacements & REHAB/REPAIRS, SFY22 | 3 of 4 | $8,892,000 | +18% |
| 16 JUN 2022 | D264818 | Region 01 | Bridge Where and When SFY 2022, NYSDOT Region-1 | 3 of 3 | $2,417,000 | +17% |
| 19 MAY 2022 | D264795 | Region 01 | Placement of concrete box tunnel under CSX bridge. | 2 of 2 | $1,965,000 | +53% |
| 20 JAN 2022 | D264644 | Region 01 | NYSDOT Region-1, Culvert Replacement Various Locations. | 4 of 5 | $4,172,000 | +16% |
| 06 JAN 2022 | D264640 | Region 09 | Deck Replacement US Rte 20 Over NY Rte 166, Cherry Valley | 6 of 7 | $3,469,000 | +20% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.